DOI QR코드

DOI QR Code

Experimental and numerical assessment of beam-column connection in steel moment-resisting frames with built-up double-I column

  • 투고 : 2017.07.31
  • 심사 : 2017.11.07
  • 발행 : 2018.02.10

초록

Built-up Double-I (BD-I) columns consist of two hot rolled IPE sections and two cover plates which are welded by fillet welds. In Iran, this type of column is commonly used in braced frames with simple connections and sometimes in low-rise Moment Resisting Frames (MRF) with Welded Flange Plate (WFP) beam-column detailing. To evaluate the seismic performance of WFP connection of I-beam to BD-I column, traditional and modified exterior MRF connections were tested subjected to cyclic prescribed loading of AISC. Test results indicate that the traditional connection does not achieve the intended behavior while the modified connection can moderately meet the requirements of MRF connection. The numerical models of the connections were developed in ABAQUS finite element software and validated with the test results. For this purpose, moment-rotation curves and failure modes of the tested connections were compared with the simulation results. Moreover to avoid improper failure modes, some improvements of the connections were evaluated through a numerical study.

키워드

참고문헌

  1. ANSI/AISC 341 (2010), Seismic provisions for structural steel buildings, American Institute of Steel Construction; Chicago, IL, USA.
  2. ANSI/AISC 358 (2010), Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications, American Institute of Steel Construction; Chicago, IL, USA.
  3. ASTM A6 / A6M-12 (2012), Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling, ASTM International, West Conshohocken, PA, USA.
  4. ASTM A370-14 (2014), Standard Test Methods and Definitions for Mechanical Testing of Steel Products, ASTM International, West Conshohocken, PA, USA.
  5. AWS D1.8/D1.8M (2009), Structural Welding Code- Seismic Supplement, American Welding Society, MI, USA.
  6. Ataollahi, S., Banan, M.R. and Banan, M.R. (2016), "Numerical cyclic behavior of T-RBS: A new steel moment connection", Steel Compos. Struct., Int. J., 21(6), 1251-1264. https://doi.org/10.12989/scs.2016.21.6.1251
  7. Bai, R., Chan, S.L. and Hao, J.P. (2015), "Improved design of extended end-plate connection allowing for prying effects", J. Constr. Steel Res., 113, 13-27. https://doi.org/10.1016/j.jcsr.2015.05.008
  8. Chi, B., Uang, C.M. and Chen, A. (2006), "Seismic rehabilitation of pre-Northridge steel moment connections: A case study", J. Constr. Steel Res., 62(8), 783-792. https://doi.org/10.1016/j.jcsr.2005.11.001
  9. Civjan, S.A., Engelhardt, M.D. and Gross, J.L. (2000), "Retrofit of pre-Northridge moment-resisting connections", J. Struct. Eng. (ASCE), 126(4), 445-452. https://doi.org/10.1061/(ASCE)0733-9445(2000)126:4(445)
  10. Coelho, A.M.G. and Bijlaard, F.S.K. (2007), "Experimental behaviour of high strength steel end-plate connections", J. Constr. Steel Res., 63(9), 1228-1240. https://doi.org/10.1016/j.jcsr.2006.11.010
  11. D'Aniello, M., Tartaglia, R., Costanzo, S. and Landolfo, R. (2017), "Seismic design of extended stiffened end-plate joints in the framework of Eurocodes", J. Constr. Steel Res.,128, 512-527. https://doi.org/10.1016/j.jcsr.2016.09.017
  12. Deylami, A. and Gholipour, M. (2011), "Experimental and analytical investigation of modified moment connection of Ibeam to double-I built-up column", J. Civil Survey. Eng. (JCSE), 45(6), 643-657.
  13. Deylami, A. and Salami, M. (2011), "Retrofitting of moment connection of double-I built-up column using trapezoidal stiffeners", Procedia Eng., 14, 2544-2551. https://doi.org/10.1016/j.proeng.2011.07.320
  14. Deylami, A. and Shiravand, M.R. (2010), "Application of full depth side-plate to moment connection of I-Beam to Double-I column", Adv. Struct. Eng., 13(6), 1047-1062. https://doi.org/10.1260/1369-4332.13.6.1047
  15. Dubina, D. and Stratan, A. (2002), "Behaviour of welded connections of moment resisting frames beam-to-column joints", Eng. Struct., 24(11), 1431-1440. https://doi.org/10.1016/S0141-0296(02)00091-3
  16. Engelhardt, M.D. and Husain, A.S. (1993), "Cyclic-loading performance of welded flange-bolted web connections", J. Struct. Eng. (ASCE), 119(12), 3537-3550. https://doi.org/10.1061/(ASCE)0733-9445(1993)119:12(3537)
  17. Erfani, S., Asnafi, A.A. and Goudarzi, A.R. (2016), "Connection of I-beam to box-column by a short stub beam", J. Constr. Steel Res., 127, 136-150. https://doi.org/10.1016/j.jcsr.2016.07.025
  18. FEMA (Federal Emergency Management Agency)-350 (2000), Recommended seismic design criteria for new steel moment-frame buildings, SAC Joint Venture; Washington, DC, USA.
  19. FEMA (Federal Emergency Management Agency)-351 (2000), Recommended seismic evaluation and upgrade criteria for existing welded steel moment-frame buildings, SAC Joint Venture; Washington, DC, USA.
  20. FEMA (Federal Emergency Management Agency)-355E (2000), State of the art report on past performance of steel moment-frame buildings in earthquakes, SAC Joint Venture; Washington, DC, USA.
  21. Gholami, M., Deylami, A. and Tehranizadeh, M. (2013), "Seismic performance of flange plate connections between steel beams and box columns", J. Constr. Steel Res., 84, 36-48. https://doi.org/10.1016/j.jcsr.2012.11.011
  22. Gholami, M., Tehranizadeh, M. and Deylami, A. (2013), "Evaluation of welded flange plate connections between steel beams and box columns", Adv. Steel Constr., 9(1), 59-76.
  23. Goswami, R. and Murty, V.R. (2010), "Externally reinforced welded I-beam-to-box-column seismic connection", J. Struct. Eng. (ASCE), 136(1), 23-30. https://doi.org/10.1061/(ASCE)0733-9399(2010)136:1(23)
  24. INBC-10 (2008), Design and construction of steel buildings, BHRC (Building and Housing Research Center), (2nd Ed.), Tehran, Iran.
  25. INBC-10 (2013), Design and construction of steel buildings, BHRC (Building and Housing Research Center), (4th Ed.), Tehran, Iran.
  26. Jahanbakhti, E., Fanaie, N. and Rezaeian, A. (2017), "Experimental investigation of panel zone in rigid beam to box column connection", J. Constr. Steel Res., 137, 180-191. https://doi.org/10.1016/j.jcsr.2017.06.025
  27. Kim, T., Stojadinović, B. and Whittaker, A.S. (2008), "Seismic performance of pre-Northridge welded steel moment connections to built-up box columns", J. Struct. Eng. (ASCE), 134(2), 289-299. https://doi.org/10.1061/(ASCE)0733-9445(2008)134:2(289)
  28. Lee, Ch.H. and Kim, J.H. (2007), "Seismic design of reduced beam section steel moment connections with bolted web attachment", J. Constr. Steel Res., 63(4), 522-531. https://doi.org/10.1016/j.jcsr.2006.06.030
  29. Lee, K., Li, R., Chen, L., Oh, K. and Kim, K.S. (2014), "Cyclic testing of steel column-tree moment connections with various beam splice lengths", Steel Compos. Struct., Int. J., 16(2), 221-231. https://doi.org/10.12989/scs.2014.16.2.221
  30. Mahin, S.A. (1998), "Lessons from damages to steel buildings during Northridge earthquake", Eng. Struct., 20(4), 261-270. https://doi.org/10.1016/S0141-0296(97)00032-1
  31. Mazrooei, A., Ghobadi, M.S. and Ghassemieh, M. (2011), Cyclic behavior and retrofitting of plate reinforced beam to column moment connections; Report No. R-573; BHRC (Building and Housing Research Center); Tehran, Iran. [In Persian]
  32. Mazrooei, A., Simonian, V. and Nikkhah Eshghi, M. (2005), Evaluation of rigid welded connections used in Iran, Report No. R-305, BHRC (Building and Housing Research Center); Tehran, Iran. [In Persian]
  33. Mirghaderi, A.R., Torabian, Sh. and Keshavarzi, F. (2010), "Ibeam to box-column connection by a vertical plate passing through the column", Eng. Struct., 32(8), 2034-2048. https://doi.org/10.1016/j.engstruct.2010.03.002
  34. Morrison, M.L., Schweizer, D.Q. and Hassan, T. (2016), "Seismic enhancement of welded unreinforced flange-bolted web steel moment connections", J. Struct. Eng. (ASCE), 142(11), 36-48.
  35. Popov, E.P., Balan, T.A. and Yang, T.S. (1998), "Post-Northridge earthquake steel moment connections", Earthq. Spectra, 14(4), 659-677. https://doi.org/10.1193/1.1586021
  36. Ramirez, C.M., Lignos, D.G., Miranda, E. and Kolios, D. (2012), "Fragility functions for pre-Northridge welded steel moment-resisting beam-to-column connections", Eng. Struct., 45, 574-584. https://doi.org/10.1016/j.engstruct.2012.07.007
  37. Ricles, J.M., Fisher, J.W., Lu, L.W. and Kaufmann, E.J. (2002), "Development of improved welded moment connections for earthquake-resistant design", J. Constr. Steel Res., 58(5-8), 565-604. https://doi.org/10.1016/S0143-974X(01)00095-5
  38. Righiniotis, T.D. and Imam, B. (2004), "Fracture reliability of a typical Northridge steel moment resisting connection", Eng. Struct., 26(3), 381-390. https://doi.org/10.1016/j.engstruct.2003.10.010
  39. Shanmugam, N.E. and Ting, L.C. (1995), "Welded interior boxcolumn to I-beam connections", J. Struct. Eng. (ASCE), 121(5), 824-830. https://doi.org/10.1061/(ASCE)0733-9445(1995)121:5(824)
  40. Tong, L., Chen, Y., Chen, Y. and Fang, Ch. (2016), "Cyclic behaviour of beam-to-column joints with cast steel connectors", J. Constr. Steel Res., 116, 114-130. https://doi.org/10.1016/j.jcsr.2015.09.005
  41. Uang, C.M., Bondad, D. and Lee, C.H. (1998), "Cyclic performance of haunch repaired steel moment connections: Rxperimental testing and analytical modeling", Eng. Struct., 20(4-6), 552-561. https://doi.org/10.1016/S0141-0296(97)00093-X
  42. Whittaker, A., Gilani, A. and Bertero, V. (1998), "Evaluation of pre-Northridge steel moment resisting frame joints", Struct. Des. Tall Special Build., 7(4), 263-283. https://doi.org/10.1002/(SICI)1099-1794(199812)7:4<263::AID-TAL118>3.0.CO;2-B

피인용 문헌

  1. Development and testing of cored moment resisting stub column dampers vol.34, pp.1, 2018, https://doi.org/10.12989/scs.2020.34.1.107
  2. Further study on improvement on strain concentration in through-diaphragm connection vol.39, pp.2, 2018, https://doi.org/10.12989/scs.2021.39.2.135