References
- Andersen, B., Henriksen, B. and Aarseth, W. (2007). "Benchmarking of project management office establishment: extracting best practices." Journal of Management in Engineering, Vol. 23, No. 2, pp. 97-104. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:2(97)
- Barney, J. (1991). "Firm resources and sustained competitive advantage." Journal of Management, Vol. 17, No. 1, pp. 99-120. https://doi.org/10.1177/014920639101700108
- Barney, J. B. and Hesterly, W. (2005). Strategic Management and Competitive Advantage Concepts and Cases, 3rd Edition. Pearson. London.
- Borich, G. D. (1980). "A needs assessment model for conducting follow-up studies." Journal of Teacher Education, Vol. 31, No. 3, pp. 39-42. https://doi.org/10.1177/002248718003100310
- Chang, S. J. (2007). Strategic management in the age of global competition, 5th Edition. Pakyongsa.
- Cho, D. Y. (2009). "Exploring how to set priority in need analysis with survey." A Journal of Research in Education, Vol. 35, pp. 165-187 (in Korean).
- Choi, J. (2012). "Dynamic capability building of technology-based ventures in the international context: the case of Korean game companies in Japan." Journal of Strategic Management, Vol. 15, No. 1, pp. 33-63.
- Choi, J. I. (2002). A practical guide to needs assessment for HRD, Hakjisa (in Korean).
- Choi, S. J. (2014). The dynamic capabilities of construction companies to meet changing environments, Doctoral Thesis, Yonsei University, Seoul, South Korea.
- Daft, R. L. (2010). Understanding the theory and design of organizations, 10th Edition, Mason, OH : South-Western.
- Flynn, B. B., Wu, S. J. and Melnyk, S. (2010). "Operational capabilities: hidden in plain view." Business Horizons, Vol. 53, No. 3, pp. 247-256. https://doi.org/10.1016/j.bushor.2010.01.001
- Ha, S. W. (2015). An analysis of phase-based competitiveness of project management consultants in the overseas building projects introducing IPA, Master Thesis, Hanyang University, Seoul, South Korea (in Korean).
- Hanna, A. S., Ibrahim, M. W., Lotfallah, W., Iskandar, K. A. and Russell, J. S. (2016). "Modeling project manager competency: An integrated mathematical approach." Journal of Construction Engineering and Management, Vol. 142, No. 8, 04016029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001141
- Jaafari, A. (1984). "Criticism of CPM for project planning analysis." Journal of Construction Engineering and Management, Vol. 110, No. 2, pp. 222-233. https://doi.org/10.1061/(ASCE)0733-9364(1984)110:2(222)
- Ji, B. O. (2015). Global competitiveness of korean civil engineering consultancy services in developing countries, Master Thesis, University of Seoul, Seoul, South Korea (in Korean).
- Kim, S. B. and Kim, Y. B. (2013). "A study on core competencies to increase global competitiveness for the korean construction industry - Focusing on discrepancies between construction and design competencies." Journal of Korean Society of Civil Engineers, Vol. 33, No. 6, pp. 2529-2539 (in Korean). https://doi.org/10.12652/Ksce.2013.33.6.2529
- Korea Engineering & Consulting Association (KENCA) (2016). PMC project performance statistical data (in Korean).
- Lee, B. (2017). How to improve competencies for international PMC Project - Focusing on engineering companies, Master Thesis. Yonsei University. Seoul. South Korea.
- Lee, B. N. (2015). Reconstruction of PMC experience of high-speed railway (Mega-Project) construction project: Experiences and implications for developing overseas PMC market entry strategy, Institute of Construction and Environmental Engineering.
- Lee, K. W., Han, S. H., Park, H. K. and Chin, K. H. (2013). "Strategies for balancing the competitiveness between engineering and construction in the Korean infrastructure industry." Journal of The Korean Society of Civil Engineers, Vol. 33, No. 1, pp. 347-354. https://doi.org/10.12652/Ksce.2013.33.1.347
- Lu, M. and Li, H. (2003). "Resource-activity critical-path method for construction planning." Journal of Construction Engineering and Management, Vol. 129, No. 4, pp. 412-420. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(412)
- Memon, A. H., Rahman, I. A., Abdullah, M. R. and Azis, A. A. A. (2011). "Factors affecting construction cost in mara large construction project: Perspective of project management consultant." International Journal of Sustainable Construction Engineering and Technology, Vol. 1, No. 2, pp. 41-54.
- Ministry of Trade, Industry and Energy (MOTIE) (2010). The 21st national competitiveness enhancement committee. MOTIE, pp. 5-9.
- Moon, H. J., Kim, T. H. and Leem, C. S. (2010). "Development of consulting capability assessment model and its application." Entrue Journal of Information Technology, Vol. 9, No. 2, pp. 93-106 (in Korean).
- Oh, S. K., Jun, J. S. and Park, Y. H. (2014). "Complementing a typical educational needs analysis using a survey in setting the priority of the needs." The Journal of Research in Education, Vol. 27, No. 4, pp. 77-98 (in Korean).
- Porter, M. E. (1981). "The contributions of industrial organization to strategic management." Academy of Management Review, Vol. 6, No. 4, pp. 609-620. https://doi.org/10.5465/AMR.1981.4285706
- Queeney, D. S. (2000). "Continuing professional education." Handbook of adult and continuing education, C. E. Kasworm, A. D. Rose and J. M. Ross-Gordon, SAGE, Thousand Oaks, California, pp. 375-391.
- Royer, K. (1986). "The federal government and the critical path." Journal of Construction Engineering and Management, Vol. 112, No. 2, pp. 220-225. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:2(220)
- Sarda, A. and Dewalkar, S. (2016). "Role of project management consultancy in construction." International Journal of Technical Research and Applications, Vol. 4, No. 2, pp. 317-320.
- Schnaars, S. P. (2002). Managing imitation strategies, Simon and Schuster, New York, N.Y.
- Teece, D. J. (2007). "Explicating dynamic capabilities: The nature and microfoundations of (sustainable) enterprise performance." Strategic Management Journal, Vol. 28, No. 13, pp. 1319-1350. https://doi.org/10.1002/smj.640
- Teece, D. J., Pisano, G. and Shuen, A. (1997). "Dynamic capabilities and strategic management." Strategic Management Journal, pp. 509-533.
- Weerawardena, J. and Mavondo, F. T. (2011). "Capabilities, innovation and competitive advantage." Industrial Marketing Management, Vol. 40, No. 8, pp. 1220-1223. https://doi.org/10.1016/j.indmarman.2011.10.012
- Wernerfelt, B. (1984). "A Resource-Based View of the Firm." Strategic Management Journal, Vol. 5, No. 2, pp. 171-180. https://doi.org/10.1002/smj.4250050207
- Witkin, B. R. and Altschuld, J. W. (1995). Planning and conducting needs assessments: A practical guide, Sage, Thousand Oaks, California.
- Wohlgemuth, V. and Wenzel, M. (2016). "Dynamic capabilities and routinization." Journal of Business Research, Vol. 69, No. 5, pp. 1944-1948. https://doi.org/10.1016/j.jbusres.2015.10.085
- Zhao, Z. Y., Zuo, J. and Zillante, G. (2011). "Situation and competitiveness of foreign project management consultancy enterprises in China." Journal of Management in Engineering, Vol. 27, No. 4, pp. 200-209. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000060