References
- Barry, D., and Hartigan, J. A. (1993). "A bayesian analysis for change point problems." Journal of the American Statistical Association, 88(421), pp. 309-319. https://doi.org/10.2307/2290726
- Bae, D. H., Lee, B. J., and Jung, I. W. (2008). "Analysi s of Construction Conditions Change due to Climate Change." Journal of Civil Engineering, KSCE, 28(4), pp. 513-521.
- Bang, J. K., Ham, H. D., Lee, J. W., and Kim, K. H. (2010). "Necessity & Efficient Utilization of NonWorking Days by Weather Condition in Building Construction." Korean Journal of Construction Engineering and Management, KICEM, pp. 123-124.
- Chae, H, M. (2007). "Influence of the Global Warming in Domestic Construction Schedules." Korean Journal of Construction Engineering and Management, KICEM, 11, pp. 567-571.
-
Climate Change Information Center (2016). "Korea Climate Change Assessment Report."
. - Cho, H J. (2017). "Evaluation Model of Urban Flood Vulnerability due to Climate Change." Urban Design Institute of Korea.
-
Climate Information Center (2016). "Revised Evaluation Report."
. -
Climate information portal (2016). "Climate change in observation."
. - Erdman, C., and Emerson, J. W. (2007). "bcp: A Package for Performing a Bayesian Analysis of Change Point Problems, R package version 1.8.4, URL (http://CRAN. R-procject.org/)" Journal of Korea Water Resources Association, 43(7), pp. 645-655.
- Hwang, S. H., Kim, J. H., Yoo, C. S., and Jung, S. W. (2010). "A Probabilistic Estimation of Changing Points of Seoul Rainfall Using BH Bayesian Analysis." Journal of Korea Water Resources Association, 7(216), pp. 645-655.
- Hwang, S. H., Kim, J. H., Yoo, C., and Jung, S. W. (2010). "A probabilistic estimation of changing points of Seoul rainfall using BH Bayesian analysis." Journal of Korea Water Resources Association, 43(7), pp. 645-655. https://doi.org/10.3741/JKWRA.2010.43.7.645
- Han, B. K., Chung, E. S., Lee, B. R., and Sung, J. H. (2013). "Investigating Changes over Time of Precipitation Indicators." Journal of Wetlands Research, 15(2), pp. 233-250. https://doi.org/10.17663/JWR.2013.15.2.233
- Jeong, S, N., and Lee, H. K. (2003). "A Study on the Method of Decision Making for the Optimal Startig Time Considering the Climate elements." Architectural Institute Of Korea, 19(5), pp. 113-120.
- Jo, K, D., and Jang, H. (2010). "Preliminary study on the current status of climate change and the necessity of adaptation strategies in Incheon." Incheon development institute.
- Jo, H, K., Kim, S, B., Sin, H, J., and Kim, S, J. (2011). "Projection of Future Snowfall by Using Climate Change Scenarios." Journal of Korean Geographical Society, 14(3), pp.188-202.
- Jung, S, J., Sung, J, H., and Kim, B, S. (2013). "Change Projection of Extreme Indices using RCP Climate Change Scenario." Korea Water Resources Association, 46(11), pp. 1089-1101.
- Joo, J. G., Kim, S, D., Pack, M, J., and Kim, J, H. (2015). "Evaluation and Calibration Method Proposal of RCP Daily Precipitation Data." Korean Society of Hazard Mitigation, 15(2), pp. 79-91.
- Kang, U. S. (2004). "The Impact of the Convention on Climate Change on Construction Industry and Appropriate Countermeasures." Korean Society Civil Engineers, 53(4), pp. 24-29.
- Kim, C. D., Lee, D. H., You, J. S., You, J. K., Jung. J. H., Jung. H. K., and Yu, J. H. (2006). "Calculation of Non-Working Days due to Weather Factors during Structural Steel Works." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 137-145.
- Kang, W. S. (2007). "The Impacts and Measures of Climate Change on Construction Industry." Construction Economy Research Institute of Korea.
- Kwon, S. B. (2007). "Study on the Influence of the Weather Factors on Productivity and Number of Working Days in Marine Construction." Dissertation of master degree in Seoul National University of Technology.
- Kim, B. G., Yun, Y. H., and Kim, G. S. (2013) "Estimating the probability of rainfall in Seoul according to climate change scenarios." Korean Society Civil Engineers, 39, pp. 1786-1789.
- Ko, G. J., and Lee, C. S. (2015). "A Study on the Change of Non-Working Days of Incheon Metropolitan through BCP Analysis." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 80-88.
- Lee, S. H,. and Kwon, W. T. (2004). "A Variation of Summer Rainfall in Korea." Journal of Korean Geographical Society, 39(6), pp. 819-832.
- Lee, D. H., You, J. S., You, J. K., Jung, J. H., Jung, H. K., You, J. H., and Kim, C. D. (2005). "Study on Calculation of Non-Working Days for Steel Structure Work with Consideration of Weather Element." Korean Journal of Construction Engineering and Management, KICEM, pp. 244-247.
- Lee, K. H., Kim, K. R., and Shin, D. W. (2006). "Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 100-108.
- Lee, J. K,. and Kim, Y. O.(2010). "A Study on Selection of Standard Scenarios in Korea for Climate Change." Journal of Climate Change Research, 1(1), pp. 59-73.
- Lee, K. M., Sung, J. H., Kim, Y. O., and Lee, S. H. (2011). "Change-point Analysis of Mean Temperature and Extreme Temperature in the Republic of Korea." Journal of Korean Geographical Society, 46(5), pp. 83-596.
- Lee, G. H. (2013). "Impact of climate change scenarios in the Building Sector." Journal of Korean Geographical Society, 33(2), pp. 64-69.
-
Meteorological Agency (2016). "Climate Prediction."
. -
Meteorological Agency (2016). "Domestic Climate Incheon Regional Characteristics."
. - Shin, J. H., Lee, J. A., and Lee, C. S. (2005). "The Estimation of Non-Working days for the Construction Project Incheon Region." Korean Journal of Construction Engineering and Management, KICEM, 6(1), pp. 58-64.
- Shin, S, H. (2009). "Climate Change and Construction." Korea Association of Air Conditioning Refrigerationg and Sanitary Engineers, 26(5), pp. 74-82.
-
R Studio (2016). "bcp packages."
.