DOI QR코드

DOI QR Code

A Study on the Property of Combustion tower Dust in EAF Process

전기로 연소탑 하단에 포집되는 분진의 특성 연구

  • Kim, Young-Hwan (Steelmaking Research Team in R&D Center of Dongkuk Steel Mill Co.) ;
  • Yoo, Jung-Min (Steelmaking Research Team in R&D Center of Dongkuk Steel Mill Co.)
  • 김영환 (동국제강 중앙기술연구소 제강연구팀) ;
  • 유정민 (동국제강 중앙기술연구소 제강연구팀)
  • Received : 2017.07.18
  • Accepted : 2017.08.29
  • Published : 2017.10.31

Abstract

During steelmaking on EAF, 1 ~ 2% of dust is generated. EAF Dust contains 20 ~ 30% of Zn and Fe. Dust contained in Off-gas is passed through combustion tower and cooling tower, and then captured in bag filter. About 15 wt.% of dust is dropped at the bottom of Combustion tower by its specific gravity, which was also carried out to recycle company with more higher charge than Bag filter dust. This study is focused on the combustion tower dust, and seperation as a function of operation period and particle size. As a result, Zn and Fe content of dust is more affected by size factor than operation period.

전기로 제강 공정에서 분진은 제강생산량의 1 ~ 2%가 발생하고 있으며, 분진 중에는 유가금속인 Zn과 Fe가 20 ~ 30% 정도 함유되어 있다. 전기로 배가스에 포함된 분진은 전기로 출구 덕트를 빠져나와 배가스를 완전연소하기 위한 연소탑과 냉각을 위한 냉각탑을 거쳐 Bag filter에 포집된다. 연소탑 하단에서 비중 차이에 의해 포집되는 분진은 전체 발생량의 15%에 해당하며 기존 Bag filter 분진보다 고가로 위탁처리 되고 있다. 본 연구는 연소탑 하단에 포집되는 분진의 유가금속 분리 회수에 대한 연구로서, 전기로 조업 시점과 분진의 입도에 따른 성분을 분석하여 유가금속의 함량 차이를 비교하였다. 본 연구 결과 전기로 조업 시점에 따른 영향 보다는 입도에 따라 Zn과 Fe의 함량에 큰 차이를 보였다.

Keywords

References

  1. Jaehong Yoon, Chihyun Yoon and Myungwon Lee, 2017 : A Study on Kinetic of Volatilization Behavior of Metal Elements Contained in Electric Arc Furnace Dust
  2. Moon, S. M. and Kim, T. D., 2014 : Unit process Analysis for EAF Dust Plant Operation, Journal of Korean Inst. of Resources Recycling, 23(1), pp.80-85. https://doi.org/10.7844/kirr.2014.23.1.80
  3. N. Y. Ma., 2011 : On In-process Separation of Zinc from EAF Dust, pp.947-952.
  4. Sune Eriksson, 1991 : Disposal, Recycling & Recovery of EAF Exhaust Dust, AIME. pp.145-149.
  5. Eung-Cho Lee, 1998 : A study on the development of hydrometallurgical processes of Electric Arc Furnace dust, Research report, National research foundation of Korea.
  6. H. K. Shin, D. Y. Lee, and S. M. Moon, 1999 : Recovery of Metals from EAF Dust with RAPID System, GME'99, pp.450-456.
  7. A. G. Guenennec et al. 2004 : Dust Formation by Bubbleburst Phenomenon at the Surface of a Liquid Steel Bath, ISIJ International, 44(8), pp.1328-1333. https://doi.org/10.2355/isijinternational.44.1328
  8. Yoshiaki KASHIWAYA et al. 2004 : ISIJ International, 44(10), pp.1774-1779. https://doi.org/10.2355/isijinternational.44.1774