References
- Du, J., Leung, J. Y. T. (1990). Minimizing total tardiness on one machine is NP-Hard, Mathematics of Operations Research, 15(3), 483-495 https://doi.org/10.1287/moor.15.3.483
- Hanna, A. S., Taylor, C. S., Sullivan, K. T. (2004). Impact of Extended Overtime on Construction Labor Productivity, J. Constr. Engrg. and Mgmt., ASCE, 131(6), 734-739.
- Hegazy, T., Wassef, N. (2001). Cost optimization in projects with repetitive nonserial activities, J. Constr. Engrg. and Mgmt., ASCE, 127(3), 183-191. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(183)
- Hinze, J. (2004). Construction Planning & Scheduling, 2nd ed, Pearson/Prentice Hall, Upper Saddle River, NJ.
- Horner, R. M. W., Talhouni, B. T. (1995). Effects of accelerated working, delays, and disruptions on labour productivity, Chartered Institute of Building, Ascot, Berkshire, U.K.
- Jiang, G, Shi, J. (2005). Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints, J. Constr. Eng. Manage., ASCE, 131(9), 986- 992. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(986)
- Lu, M., Li, H. (2003). Resource-activity critical-path method for construction planning, J. Constr. Eng. Manage., ASCE, 129(4), 412- 420. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(412)
- Moselhi, O., E. R, K. (1993). Scheduling of repetitive projects with cost optimization, J. Constr. Engrg. Mgmt., ASCE, 119(4), 681- 697. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(681)
- Nkasu, M. M., Leung, K. H. (1997). A resources scheduling decision support system for concurrent projects management, Int. J. Prod. Res., 35(11), 3107-3132. https://doi.org/10.1080/002075497194318
- O'Brien, W. J. (2000). Multi-project resource allocation: parametric models and managerial implications, Eighth Annual Conference of the International Group for Lean Construction, University of Sussex, Brighton, United Kingdom, July 17-18
- O'Brien, W. J., Fischer M. A. (2000). Importance of capacity constraints to construction cost and schedule, J. Constr. Engrg. and Mgmt., ASCE, 126(5), 366-373. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(366)
- Reda, R. (1990). RPM: Repetitive project modeling, J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(316)
- RS Means. (2005). RS Means Building Construction Cost Data, 63rd Edition, RS Means, Kingston, MA, USA.
- Song, C. (2005). Multi-resource allocation across multi projects by subcontractor, Master thesis, University of Florida.
- Suhail, S., Neale, R. (1994). CPM/LOB: New methodology to integrate CPM and line of balance, J. Constr. Engrg. and Mgmt., ASCE, 120(3), 667-684. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(667)
- Thabet, W. J., Beliveau, Y. J. (1994). Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings, J. Constr. Engrg. and Mgmt., ASCE, 120(1), 96-116. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(96)
- Yang, B., Geunes, J., O'Brien, W. J. (2005). A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling, Computers & Operations Research, 31, 1273-1301.