A Study on the Development of Algorithm for Defining the Installation Sequence of Outfitting

의장재 설치 순서 결정을 위한 알고리즘 개발 연구

  • Choi, Jaeho (Dept. of Naval Architecture & Ocean Systems Engineering, Korea Maritime & Ocean University) ;
  • Kim, Jihye (Dept. of Naval Architecture & Ocean Systems Engineering, Korea Maritime & Ocean University) ;
  • Woo, Jonghun (Dept. of Naval Architecture & Ocean Systems Engineering, Korea Maritime & Ocean University)
  • 최재호 (한국해양대학교 조선해양시스템공학과) ;
  • 김지혜 (한국해양대학교 조선해양시스템공학과) ;
  • 우종훈 (한국해양대학교 조선해양시스템공학과)
  • Received : 2017.01.06
  • Accepted : 2017.07.15
  • Published : 2017.10.20

Abstract

Outfittings of offshore plants and high value-added vessels, such as FPSO, drillship, are much more than outfittings of general ships. So the complexity of the outfittings is increased and the importance of outfittings has also increased. But, there is no clear method to define the installation sequence of outfittings, yet. In this study, we developed the algorithm to define the installation sequence of outfittings by applying variables and constraints related to outfitting, such as process parameters, weighting coefficients, installation constraints. Also, we developed the application that applied the algorithm and compared cases by changing the weighting coefficients of process parameters. We verified the practicality of the algorithm by developing the application. The results of this study are that the accuracy of the outfitting planning is improved and efficient lead time can be predicted by defining the installation sequence of outfittings.

Keywords

References

  1. Ham, D.K. Back, M.G. Park, J.G. & Woo, J.H., 2016. A study of piping leadtime forecast in offshore plants outfittings procurement management. Journal of the Society of Naval Architects of Korea, 53(1), pp.29-36. https://doi.org/10.3744/SNAK.2016.53.1.29
  2. Hong, Y.G. Jung, E.K. Jeon, J. & Kim, S.Y., 1997. Generation of erection sequence In shipbuilding process planning. Journal of the Korean institute of Industrial Engineers, 10(1), pp.189-207.
  3. Kim, J.H. Lee, Y.G. Lim, H.K. & Woo, J.H., 2016. A study on the methodology in assembly sequence for offshore plant topside spool. 2016 Spring Proceedings of Korean Institute of Industrial Engineers, Jeju, Korea, 13-14 April 2016, pp.535-540.
  4. Korea Energy Economics Institute (KEEI), 2015. A proposal for offshore plant of Korea resource development. Korea: KEEI.
  5. Kim, S.S., 2015. The three heavy industries operating loss sharply. [Online] (Updated 2 June 2015) Available at: http://www.monthlymaritimekorea.com/news/articleView.html?idxno=16199 [Accessed 2 June 2015].
  6. Rose, C. Coenen, J. & Hopman, H., 2015. Definition of ship outfitting as a resource availability cost problem and development of a heuristic solution. Journal of Ship Production and Design, 32(3), pp. 154-165.
  7. Seo, J.Y., 2015. Assembly sequence planning for ship and offshore structures considering welding distortion. Master's Thesis. Korea Advanced Institute of Science and Technology.
  8. Yan, W. & Nienhuis, U., 2012. Automatic generation of assembly sequence for the planning of outfitting processes in shipbuilding. Journal of Ship Production and Design, 28(2), pp.49-59.