참고문헌
- Cho, T. J., & Choi, J. S. (2011). Case Studies : Schedule Delay Factors and Delay Prevention Program for Concrete Frame Work in Apartment Construction Project, Journal of the Korea Institute of Building Construction, 11(1), 9-17 https://doi.org/10.5345/JKIC.2011.02.1.009
- Lee, J. S. (2007). Delay Analysis Using Linear Schedule in Construction, Journal of the Architectural Institute of Korea, Structure & Construction Section, 23(8), 213-20
- Lee, K. J., & Kim, Y. S. (2010). An Importance Analysis for the Major Schedule Management Factors Classified by Construction Participants in High-rise Building Reinforced Concrete Work, Journal of the Architectural Institute of Korea, Structure & Construction Section, 26(12), 185-92
- Lee, J. H., Kim, H. S., Park, H. S., & Kim, Y. S. (2000). A model for Construction Delay Claim Analysis Based on Internet, Journal of the Architectural Institute of Korea, Structure & Construction Section, 20(1), 423-26
- Kim. D. J., Kim, K. H, Lee, K. H., Lee, J. S., & Lee, H. S. (1999). Analyzing the Impacts of Delay on a Schedule in Construction Project, Journal of the Architectural Institute of Korea, Structure & Construction Section, 15(9), 113-22
- Kim, E. J., Kim, J. H., Lee, J. H., & Huh, Y. K. (2016). Analysis of Different Perception on the Importance of Construction Schedule Delay Factors by Participants in Apartment Construction Projects, Journal of the Architectural Institute of Korea, Structure & Construction Section, 18(3), 165-72
- Kim, J. H. (1999). A Construction Delay Claim Analysis Procedure, Thesis, Chung-Ang University.
- Ko, S. S. (2007). A Study Evaluation of Influence Factors about the Construction Delay FMEA in Apartment Housing, Thesis, Hanyang University.
- Kwon, J. H. (2008). Development for Analysis System of Delayed Duration for Construction Project, Thesis, Gyeongsang National University.
- Park, C. W., & Yun, S. H. (2009). A Case Study on Reason Analysis for Schedule Delay of Apartment House, Journal of the Korea Institute of Building Construction, 9(1), 89-94 https://doi.org/10.5345/JKIC.2009.9.1.089
- Han, J. K. (2003). An Analysis on Delay Factors of Major Trades in Apartment Housing Project, Thesis, Sungkyunkwan University.
- Han, J. K., Chin, S. Y., & Kim, Y. S. (2003). An Analysis on Delay Factors of Major Trades in Apartment Housing Project, Journal of the Architectural Institute of Korea, Structure & Construction Section, 19(3), 163-70