How to Avoid Severe Incidents at Hydropower Plants

  • Received : 2016.08.30
  • Accepted : 2017.04.24
  • Published : 2017.06.30

Abstract

Hydropower is now changing its role from the energy generator into the most powerful and reliable tool for stabilizing the electrical network, especially under the increase of intermittent power sources like wind-power and solar-power. Although the hydropower plants are the most robust generating facilities, they are not immune from unexpected severe incidents having long downtime, considerable restoration cost and sometimes fatalities. The present paper provides some study results about severe incidents in the conventional hydropower plants, mainly about the flood, fire and electro-mechanical troubles, except for the incidents of civil facilities. It also provides some possible scenarios which may lead some measures how to avoid such incidents. Finally, it provides some comprehensible recommendations to avoid severe incidents based on experiences.

Keywords

References

  1. Yasuda, M and Watanabe, S., 2016, "How to Avoid Severe Incidents at Pumped Storage Power Plants," 28th IAHR.
  2. IEEJ, Technical Report No.1144, 2009, "Study on equipment troubles of hydroelectric power plants," (In Japanese).
  3. The Federation of Electric Power Companies of Japan (FEPC), Engineering Department, 1988-2012, "Annual statistics of safety and maintenance activities for electric facilities," (In Japanese).
  4. Japan Meteorological Agency, 2013, "Climate change observation report 2013," (In Japanese).
  5. Japan Electric Power Civil Engineering Association, 2007, "Report for operational control of hydroelectric power against the abnormal weather," pp29, (In Japanese).
  6. Doi, Y., 2015, "Damages and Restoration works of a hydroelectric power station hit by Typhoon 12," New Energy Foundation, 103rd Practical seminar of middle and small hydropower technologies (In Japanese).
  7. Cheng, C.T. et al., 2009, "Evaluation of Landslides and Debris flow hazards for Reconstruction of Chin-shan Hydropower plant in Tachia Watershed after CHI-CHI Earthquake," An International Conference in Commemoration of the 10th Anniversary of the Chi-Chi Earthquake.
  8. Roose, D., 2015, "Investigation, Re-creation Indicates Likely Ignition Point of Thermalito Fire," HydroWorld.com.
  9. Bardy D.M. et al., 2011, "Emergency Response: Lessons Learned during Recovery from a Fire in the Detroit Powerhouse," HydroWorld.com.
  10. U.S. Fire Administration, 2002, "Fire at Watts Bar Hydroelectric plant," USFA-TR-147.
  11. Westberg, O.A., 2015, "Safety conditions in underground power plants: A histrical view of accidents. What did we learn?" Hydro2015, 13.01, Bordeaux, France.
  12. Water Power & Dam Construction, September 1981.
  13. Halipchuk, P. et al., 2011, "Machining Solutions: Repairing Cracked Turbine Shafts at Jenpeg," HydroWorld.com.
  14. Acker F., 2011, "Fatal failures: Siberia's hydro disaster," Engineering and Technology Magazine.
  15. BC HYDRO, 2008, "GM SHRUM GENERATING STATION G3 RUNNER FAILURE TECHNICAL ANALYSIS AND RECOMMENDATIONS," Report No. E653.
  16. Alvarez, A., 2011, "Solving a Problem Related to Shear Pin Failure," HydroWorld.com.
  17. Aliabadi, A. and Shamekhi, A., 2007. "Von Karman frequency excitation caused cracking of the Karun III Francis runner," HYDRO2007 6.04.
  18. Fisher, R.K. Jr., et al., 2002, "A Case Study in Resonant Hydroelastic Vibration: The causes of Runner Cracks and the Solutions implemented for the Xiaolangdi Hydroelectric Project," 21st IAHR.
  19. Price, J. W.H., 1998, "The failure of the Dartmouth turbine casing," International Journal of Pressure Vessels and Piping Volume 75, Issue 7, pp 559-566. https://doi.org/10.1016/S0308-0161(98)00048-9
  20. Gummer, J.H. and Hensman, P.C., 1992, "A review of stayvane cracking in hydraulic turbines," Water Power & Dam Construction.
  21. Combes, G., et al., 2015, "A case of penstock rupture due to spherical valve resonance: investigations and numerical simulation," HYDRO 2015, 19.06.
  22. CIGRE TB454, 2011, "Hydro-generators Fire Protection Update (Questionnaire)," Working Group A1. 04.
  23. CIGRE TB392, 2009, "Survey of Hydrogenerator failures," Working Group A1.10.
  24. NFPA 851, 2010, "Recommended Practice for Fire Protection for Hydroelectric Generating Plants".