DOI QR코드

DOI QR Code

Design and Fabrication of Test Equipment for mass production of Automatic Test Equipment(ATE)

  • Received : 2017.06.23
  • Accepted : 2017.07.19
  • Published : 2017.08.31

Abstract

In this paper, we proposed the test equipment that can perform separate performance tests to mass-produce the Automatic Test Equipment. Until now, the performance test of the ATE has been performed after it has been assembled perfectly. It is possible to perform the performance test only when the external device manufacturing and setting of measurement resources and the internal wiring work have been completed. So we have been studying test equipment that separately tested the switching devices that played a key role in the performance of the ATE. To build the test equipment, we reviewed the circuit card assemblies that make up the switching devices. We designed a test equipment that satisfies the performance test and apply the completed test equipment to the actual production process to analyze whether it was effective in improving the time and workability of the performance test. The test equipment has the advantage that it can be used universally in the mass production process of ATE with the same type of switching device.

Keywords

References

  1. W. K. Kim, "Design and Implementation of the multi-function switching system for Automatic Test Equipment(ATE)," Journal of the Graduate School of Industry Kumoh National Institute of Technology, Dec. 2012.
  2. Y. H. Yoon, K. U. Ku, J. J. Keum, U. H. Hwang, and S. Woo, "The Study on Improvement of ATE Reliability in Production Phase," The Institute of Electronics Engineers of Korea - System and Control, Vol. 47, No. 6, pp. 19-26, Nov. 2010.
  3. K. J. Choi, "The Study on The Production Testing Equipment for the Improvement of System Test Reliability in FCS," Journal of the Institute of Electronics and Information Engineers, Vol. 53, No. 11, pp. 139-147, Nov. 2016. https://doi.org/10.5573/IEIE.2016.53.11.139
  4. D. J. Kim, "Real-Time System Parallel Testing Techniques for Weapon System Error Verification," Journal of the Institute of Electronics and Information Engineers, Vol. 53, No. 11, pp. 130-138, Nov. 2016. https://doi.org/10.5573/ieie.2016.53.11.130
  5. S. M. Lee, and Y. K. Kim, "The Study of PCB tester for improving productivity," Journal of Korea Institute of Information and Communication Engineering, Vol. 16, No. 12, pp. 2808-2814, Dec. 2012. https://doi.org/10.6109/jkiice.2012.16.12.2808
  6. Y. K. Yang, S. I. Oh, K. S. Kang, "The study on the Process Capability Index for Continuously Improvement Quality Safety," Journal of the Korea Safety Management & Science, Vol. 8, No. 3, pp. 11-25, Jun. 2006.
  7. J. G. Kim, I. H. Kim, H. M. Kim, "On the Six-sigma Approach in Dependability Management System IEC60300," Proceedings of the Safety Management and Science Conference, pp. 639-649, Nov. 2010.
  8. S. H. Hong, H. M. Gwon, M. K. Lee, and S. B. Kim, "Basic Statistics and MINITAB Usage for Six Sigma," KOREAN STANDARDS ASSOCIATION, Mar. 2012.