참고문헌
- PLG Inc, Seabrook station probabilistic safety assessment, Section 13.3, Risk of two unit station, Prepared for Public Service Company of New Hampshire, PLG-0300, 1983.
- T. Hakata, Seismic PSA method for multiple nuclear power plants in a site, Reliab. Eng. Syst. Saf. 92 (2007) 883-894. https://doi.org/10.1016/j.ress.2006.04.022
- S. Samaddar, K. Hibino, O. Coman, Technical approach for safety assessment of multi-unit NPP sites subject to external events, Probabilistic Safety Assessment and Management PSAM 12, Honolulu, Hawaii, 2014.
- M.A. Stutzke, Scoping estimates of multiunit accident risk, Probabilistic Safety Assessment and Management PSAM 12, Honolulu, Hawaii, 2014.
- K. Flemming, On the issues of integrated risk-a PRA practitioners perspective, Proceedings of the ANS International Topical Meeting on Probabilistic Safety Analysis, San Francisco, CA, USA, 2005.
- T.D. Duy, D. Vasseur, E. Serdet, Multi units probabilistic safety assessment: methodological elements suggested by EDF R&D, Probabilistic Safety Assessment and Management PSAM 12, Honolulu, Hawaii, 2014.
- V. Hassija, C.S. Kumar, K. Velusamy, Probabilistic safety assessment of multi-unit nuclear power plant sites-an integrated approach, J. Loss Prevent. Process Ind. 32 (2014) 52-62. https://doi.org/10.1016/j.jlp.2014.07.013
- S. Schroer, M. Modarres, An event classification schema for evaluating site risk in a multi-unit nuclear power plant probabilistic risk assessment, Reliab. Eng. Syst. Saf. 117 (2013) 40-51. https://doi.org/10.1016/j.ress.2013.03.005
- K. Ebisawa, T. Teragaki, S. Nomura, H. Abe, M. Shigemori, M. Shimomoto, Concept and methodology for evaluating core damage frequency considering failure correlation at multi units and sites and its application, Nucl. Eng. Des. 288 (2015) 82-97. https://doi.org/10.1016/j.nucengdes.2015.01.002
- J.W. Reed, M.W. McCann, J. Iihara, H. Hadidi-Tamjed, Analytical techniques for performing probabilistic seismic risk assessment of nuclear power plants, ICOSSAR '85, 4th International Conference on Structural Safety and Reliability, Kobe, Japan, 1985.
- S. Epstein, A. Rauzy, Can we trust PRA? Reliab. Eng. Syst. Saf. 88 (2005) 195-205. https://doi.org/10.1016/j.ress.2004.07.013
- S. Han, J. Park, D. Kim, H. Lim, S. Jang, Comparison of various methods to quantify a fault tree for Seismic PSA, Transactions of the Korean Nuclear Society Spring Meeting, Jeju, Korea, 2015.
- EPRI, Methodology for developing seismic fragilities, TR-103959, 1994.
- S. Han, H. Lim, Top event probability evaluation of a fault tree having circular logics by using Monte Carlo method, Nucl. Eng. Des. 243 (2012) 336-340. https://doi.org/10.1016/j.nucengdes.2011.11.029
피인용 문헌
- Feasibility of shared use of alternative AC diesel generator under dual-unit station blackout vol.54, pp.10, 2017, https://doi.org/10.1080/00223131.2017.1359123
- Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site vol.50, pp.8, 2018, https://doi.org/10.1016/j.net.2018.04.005
- AIMS-MUPSA software package for multi-unit PSA vol.50, pp.8, 2017, https://doi.org/10.1016/j.net.2018.06.012
- Development of logical structure for multi-unit probabilistic safety assessment vol.50, pp.8, 2017, https://doi.org/10.1016/j.net.2018.10.012
- A Method to Avoid Underestimated Risks in Seismic SUPSA and MUPSA for Nuclear Power Plants Caused by Partitioning Events vol.14, pp.8, 2021, https://doi.org/10.3390/en14082150
- Probability subtraction method for accurate quantification of seismic multi-unit probabilistic safety assessment vol.53, pp.4, 2021, https://doi.org/10.1016/j.net.2020.09.022
- Multi-unit nuclear power plant probabilistic risk assessment: A comprehensive survey vol.213, pp.None, 2021, https://doi.org/10.1016/j.ress.2021.107782