References
- 이정훈 (2017). "Planning and Control of Modular Building Construction Projects Using Discrete-Event Simulation" 서울대학교 박사학위논문
- Abu Hammad, A., Salem, O., Hastak, M., & Syal, M. (2008). Decision support system for manufactured housing facility layout. Journal of Architectural Engineering, 14(2), 36-46. https://doi.org/10.1061/(ASCE)1076-0431(2008)14:2(36)
- Hasan, S., Al-Hussein, M., & Gillis, P. (2010, December). Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles. In Proceedings of the Winter
- Moghadam, M. (2014). Lean-MOD: An Approach to Modular Construction Manufacturing Production Efficiency Improvement (Doctoral dissertation, University of Alberta).
- Wu, D., Lin, Y., Wang, X., Wang, X., & Gao, S. (2010). Algorithm of crane selection for heavy lifts. Journal of Computing in Civil Engineering, 25(1), 57-65. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000065