Acknowledgement
Supported by : National Natural Science Foundation of China
References
- Bazant, Z.P. (1972), "Prediction of concrete creep effects using age-adjusted effective modulus method", ACI J., 69(4), 212-217.
- Bazant, Z.P., Yu, Q. and Li, G.H. (2012a), "Excessive long-time deflections of prestressed box girders. I: Record-span bridge in Palau and other paradigms", J. Struct. Eng., ASCE, 138(6), 676-686. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000487
- Bazant, Z.P., Yu, Q. and Li, G.H. (2012b), "Excessive long-time deflections of prestressed box girders. II: Numerical analysis and lessons learned", J. Struct. Eng., ASCE, 138(6), 687-696. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000375
- Cao, G.H. (2000), "Analysis and experimental study on shear lag effect of RC box girder", M.Sc. Dissertation, Hunan University, Changsha, China. (in Chinese)
- CEB-FIP model code 1990 (1993), Model Code for Concrete Structures, Euro-International Committee for Concrete-International Federation for Prestressing; Lausanne, Switzerland.
- Dezi, L. and Mentrasti, L. (1985), "Nonuniform bending-stress distribution (shear lag)", J. Struct. Eng., ASCE, 111(12), 2675-2690. https://doi.org/10.1061/(ASCE)0733-9445(1985)111:12(2675)
- Dezi, L., Gara, F. and Leoni, G. (2003), "Shear-lag effect in twin-girder composite decks", Steel Compos. Struct., 3(2), 111-122. https://doi.org/10.12989/scs.2003.3.2.111
- Dezi, L., Gara, F., Leoni, G. and Tarantino, A.M. (2001), "Time-dependent analysis of shear-lag effect in composite beams", J. Eng. Mech., ASCE, 127(1), 71-79. https://doi.org/10.1061/(ASCE)0733-9399(2001)127:1(71)
- Elbadry, M., Ghali, A. and Gayed, R.B. (2014), "Deflection control of prestressed box girder bridges", J. Bridge Eng., ASCE, 19(5), 04013027. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000564
- Gara, F., Leoni, G. and Dezi, L. (2009), "A beam element including shear lag effect for the time-dependent analysis of steel-concrete composite decks", Eng. Struct., 31(8), 1888-1902. https://doi.org/10.1016/j.engstruct.2009.03.017
- Gara, F., Ranzi, G. and Leoni, G. (2010), "Short- and long-term analytical solutions for composite beams with partial interaction and shear-lag effects", Int. J. Steel Struct., 10(4), 359-372. https://doi.org/10.1007/BF03215844
- Ghali, A., Favre, R. and Elbadry, M. (2012), Concrete Structures: Stresses and Deformations, Analysis and Design for Serviceability, (4th Edition), Spon Press, London, UK.
- Gilbert, R.I. and Ranzi, G. (2011), Time-dependent Behavior of Concrete Structures, Spon Press, London, UK.
- Granata, M.F., Margiotta, P. and Arici, M. (2013), "Simplified procedure for evaluating the effects of creep and shrinkage on prestressed concrete girder bridges and the application of European and North American prediction models", J. Bridge Eng., ASCE, 18(12), 1281-1297. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000483
- Guo, T. and Chen, Z.H. (2016), "Deflection control of long-span PSC box-girder bridge based on field monitoring and probabilistic FEA", J. Perform. Constr. Facil., ASCE, 30(6), 04016053. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000909
- Jirasek, M. and Bazant, Z.P. (2002), Inelastic Analysis of Structures, Wiley, Chichester, UK.
- Kristek, V. and Bazant, Z.P. (1987), "Shear lag effect and uncertainty in concrete box girder creep", J. Struct. Eng., ASCE, 113(3), 557-574. https://doi.org/10.1061/(ASCE)0733-9445(1987)113:3(557)
- Kristek, V. and Kadlec, L. (2014), "The cross-section warping effect with the associated creep-induced deformations", Adv. Eng. Softw., 72, 213-217. https://doi.org/10.1016/j.advengsoft.2013.06.015
- Lacidogna, G. and Tarantino, M. (1996), "Approximate expressions for the ageing coefficient and the relaxation function in the viscoelastic analysis of concrete structures", Mater. Struct., 29(3), 131-140. https://doi.org/10.1007/BF02486158
- Lin, Z.B. and Zhao, J. (2011a), "Least-work solutions of flange normal stresses in thin-walled flexural members with high-order polynomial", Eng. Struct., 33(10), 2754-2761. https://doi.org/10.1016/j.engstruct.2011.05.022
- Lin, Z.B. and Zhao, J. (2011b), "Revisit of AASHTO effective flange-width provisions for box girders", J. Bridge Eng., ASCE, 16(6), 881-889. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000194
- Lou, T.J., Lopes, S.M.R. and Lopes, A.V. (2014), "A finite element model to simulate long-term behavior of prestressed concrete girders", Finite Elem. Anal. Des., 81, 48-56. https://doi.org/10.1016/j.finel.2013.11.007
- Lou, T.J., Lopes, S.M.R. and Lopes, A.V. (2015a), "FE analysis of short- and long-term behavior of simply supported slender prestressed concrete columns under eccentric end axial loads causing uniaxial bending", Eng. Struct., 85, 52-62. https://doi.org/10.1016/j.engstruct.2014.12.023
- Lou, T.J., Lopes, S.M.R. and Lopes, A.V. (2015b), "Interaction between time-dependent and second-order effects of externally posttensioned members", J. Bridge Eng., ASCE, 20(11), 06015003. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000761
- Lou, T.J., Lopes, S.M.R. and Lopes, A.V. (2016), "Time-dependent behavior of concrete beams prestressed with bonded AFRP tendons", Compos. Part B: Eng., 97, 1-8. https://doi.org/10.1016/j.compositesb.2016.04.070
- Luo, Q.Z., Wu, Y.M., Li, Q.S., Tang, J. and Liu, G.D. (2004), "A finite segment model for shear lag analysis", Eng. Struct., 26(14), 2113-2124. https://doi.org/10.1016/j.engstruct.2004.07.010
- Malm, R. and Sundquist, H. (2010), "Time-dependent analyses of segmentally constructed balanced cantilever bridges", Eng. Struct., 32(4), 1038-1045. https://doi.org/10.1016/j.engstruct.2009.12.030
- Norachan, P., Kim, K.D. and Onate, E. (2014), "Analysis of segmentally constructed prestressed concrete bridges using hexahedral elements with realistic tendon profiles", J. Struct. Eng., ASCE, 140(6), 04014028. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000923
- Pan, Z.F., Fu, C.C. and Jiang, Y. (2011), "Uncertainty analysis of creep and shrinkage effects in long-span continuous rigid frame of Sutong Bridge", J. Bridge Eng., ASCE, 16(2), 248-258. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000147
- Reissner, E. (1946), "Analysis of shear lag in box beams by the principle of the minimum potential energy", Q. Appl. Math., 4(3), 268-278. https://doi.org/10.1090/qam/17176
- Robertson, I.N. (2005), "Prediction of vertical deflections for a long-span prestressed concrete bridge structure", Eng. Struct., 27(12), 1820-1827. https://doi.org/10.1016/j.engstruct.2005.05.013
- Sousa, C., Sousa, H., Neves, A.S. and Figueiras, J. (2012), "Numerical evaluation of the long-term behavior of precast continuous bridge decks", J. Bridge Eng., ASCE, 17(1), 89-96. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000233
- Sousa, H., Bento, J. and Figueiras, J. (2014), "Assessment and management of concrete bridges supported by monitoring databased finite-element modeling", J. Bridge Eng., ASCE, 19(6), 05014002. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000604
- Takacs, P.F. (2002), "Deformations in concrete cantilever bridges: Observations and theoretical modelling", Ph.D. Dissertation, The Norwegian University of Science and Technology, Trondheim, Norway.
- Wen, Q.J. (2011), "Long-term effect analysis of prestressed concrete box-girder bridge widening", Constr. Build. Mater., 25(4), 1580-1586. https://doi.org/10.1016/j.conbuildmat.2010.09.041
- Wu, Y.P., Liu, S.Z., Zhu, Y.L. and Lai, Y.M. (2003), "Matrix analysis of shear lag and shear deformation in thin-walled box beams", J. Eng. Mech., ASCE, 129(8), 944-950. https://doi.org/10.1061/(ASCE)0733-9399(2003)129:8(944)
- Xiang, Y.Q. and He, X.Y. (2015), "Time-dependent behavior of PC box girder bridges considering non-uniform shrinkage and creep", J. Harbin Inst. Tech., 47(12), 117-122. (in Chinese)
- Xiang, Y.Q., Tang, G.B. and Liu, C.X. (2011), "Cracking mechanism and simplified design method for bottom flange in prestressed concrete box girder bridge", J. Bridge Eng., ASCE, 16(2), 267-274. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000151
- Yang, I.H. (2007a), "Uncertainty and sensitivity analysis of time-dependent effects in concrete structures", Eng. Struct., 29(7), 1366-1374. https://doi.org/10.1016/j.engstruct.2006.07.015
- Yang, I.H. (2007b), "Prediction of time-dependent effects in concrete structures using early measurement data", Eng. Struct., 29(10), 2701-2710. https://doi.org/10.1016/j.engstruct.2007.01.015
- Zhang, Y.H. (2012), "Improved finite-segment method for analyzing shear lag effect in thin-walled box girders", J. Struct. Eng., ASCE, 138(10), 1279-1284. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000552
- Zhang, Y.H. and Lin, L.X. (2014a), "Shear lag analysis of thin-walled box girders adopting additional deflection as generalized displacement", J. Eng. Mech., ASCE, 140(4), 04014005. https://doi.org/10.1061/(ASCE)EM.1943-7889.0000705
- Zhang, Y.H. and Lin, L.X. (2014b), "Shear lag analysis of thin-walled box girders based on a new generalized displacement", Eng. Struct., 61, 73-83. https://doi.org/10.1016/j.engstruct.2013.12.031
- Zhou, S.J. (2010), "Finite element considering shear-lag effect in box girder", J. Eng. Mech., ASCE, 136(9), 1115-1122. https://doi.org/10.1061/(ASCE)EM.1943-7889.0000156