Abstract
Over the past several years, sea trade have increased traffic by ships which highlighted a problem of unwanted species invading the surrounding seas through ship's ballast water discharge. Maritime trade volume has continuously increased worldwide and the problem still exists. The respective countries are spending billions of dollars in an effort to clean up the contamination and prevent pollution. As part of an effort to solve marine environmental problem, BWM(Ballast Water Management) convention was adopted at a diplomatic conference on Feb. 13 2004. In order to comply harmoniously this convention by each country. This convention will be effective after 12 months from the date which 30 countries ratified accounting for more than 35% of the world merchant shipping volume. On Sep. 8 2016, Finland ratified this convention and effective condition was satisfied as 52 states and world merchant vessel fleet 35.1441%. Thus, after Sep. 8 2017, all existing vessels shall be equipped with BWTS(Ballast Water Treatment System) in accordance with D-2 Regulation, which physically handles ballast water from ballast water exchange system(D-1 Regulation). In this study, we analyzed in detail the optimal design method using the Risk Analysis and Evaluation technique which is mainly used in the manufacturing factory or the risky work site comparing with the traditional design concept method applying various criteria. The Risk Assessment Method is a series of processes for finding the Risk Factors in the design process, analyzing a probility of the accident and size of the accident and then quantifying the Risk Incidence and finally taking measures. In this study, this method was carried out for Electrolysis treatment type on DWT 180K Bulk Carrier using "HAZOP Study" method among various methods. In the Electrolysis type, 63 hazardous elements were identified.