PURPOSES : In this study, the pavement condition of non-mill-and-overlay and mill-and-overlay on deteriorated concrete pavement was compared. In addition, the suitable time to perform the initial overlay was investigated. METHODS : The condition of the pavement sections that were not additionally overlaid on non-mill-and-overlay or mill-and-overlay on deteriorated concrete pavements was investigated according to overlay pavement age. The condition of non-mill-and-overlay and mill-and-overlay sections of expressway route 25, which has more information on overlay history than other routes, was compared according to the number of times of overlay. The relation between the concrete pavement condition just before the overlay and the number of times of overlay was investigated for the non-mill-and-overlay and mill-and-overlay sections for which the first overlay was performed in the same year. RESULTS : The pavement condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections, showing higher Highway Pavement Condition Index(HPCI) regardless of overlay pavement age. The number of reflection crackings of the non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. As a result of observing the cores obtained from the overlay sections, the proportion of the deteriorated non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. The SD measured just before the overlay on the concrete pavement for which additional overlay was not performed was smaller than that for which additional overlay was performed regardless of the milling of the concrete slab surface. The HPCI of the concrete pavement for which overlay was performed just once was higher than that for which overlay was performed more than one time. CONCLUSIONS : Accordingly, it was concluded that the condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections. In addition, the better the condition of concrete pavement just before the initial overlay, the longer the duration of the overlay effect.

키워드

참고문헌

  1. Kang, M. S. (2011). Distribution of Chloride in Concrete Pavement Subjected to De-icing Salts and Its Effect on the Failure of Asphalt Overlay. Ph.D. Thesis, Hanyang University, Korea.
  2. KEC (2011). An Improvement of Highway Pavement Condition Index(HPCI) and Evaluation Level. Report, Korea Expressway Corporation, Korea.
  3. KEC (2012). An Improvement of Asphalt Overlay Pavement On Concrete Pavement. Report, Korea Expressway Corporation, Korea.
  4. KEC (2015). An Application Method of Old Concrete Pavement In Public, Non-Milling and Milling Overlay Comparison. Report, Korea Expressway Corporation, Korea.
  5. KECRI (2015a). An Extension of Milling Overlay Present Serviceability On Old Concrete Pavemen. Report, Korea Expressway Corporation Research Institute, Korea.
  6. KECRI (2015b). A Research Result of Honam Expressway Pavement Condition. Report, Korea Expressway Corporation Research Institute, Korea.
  7. Lim, S. K. and Shin, H. J. (2003). "Damage Example of Old Concrete Pavement and Overlay Repair Section", International Journal of Highway Engineering, Vol. 10, No. 4, pp.49-53.
  8. Son, H. C., Kwon, S. O., Lee, J. J., Back, C. M., Lim, S. K., and Shin, H. J. (2013). "A Study for Determining the Rehabilitation Method Group Using NHPCI on Asphalt Concrete Pavement of National Highway", International Journal of Highway Engineering, Vol. 15, No. 2, pp.1-9. https://doi.org/10.7855/IJHE.2013.15.2.001