Abstract
The collapse accidents during a open ground excavation in urban areas not only lead to human injuries and material damages in the construction site, but also lead to road sinks and damages to the adjacent facilities due to settlement of ground around the construction site. Therefore, during a open ground excavation in the urban areas, it is necessary to thoroughly prepare for prevention of collapse accidents, and consider whole construction stage such as planning, design and construction. In this study, the priorities to be managed mainly were obtained in order to prevent collapse accidents during a open ground excavation. After analyzing results from past accidents cases for open ground excavations, priorities were evaluated regarding collapse-inducing elements using the Delphi technique which is a decision-making method by consensus among experts. As a result, insufficient groundwater treatment, bad geotechnical investigation and instability on construction, etc. were obtained as priorities for prevention of collapse accidents.
도심지 개착식 굴착공사 중 발생하는 붕괴사고는 공사장 내에서의 인명 및 물질적 피해를 불러일으킬 뿐만 아니라, 공사장 주변의 지반침하로 인한 도로함몰 및 시설물 피해를 유발한다. 따라서, 도심지에서 개착식 굴착공사를 수행함에 있어서, 계획, 설계 및 시공의 건설 전체 단계에서 굴착공사 붕괴 방지를 위한 철저한 대비가 필요하다. 본 연구에서는 이와 같은 개착식 굴착공사 중 붕괴사고 예방을 위해, 중점적으로 관리되어야 할 우선 요소 결정 연구를 수행하였다. 먼저, 과거 흙막이 굴착공사의 사고사례 조사결과를 분석하고, 전문가 합의에 의한 의사결정 방법인 델파이 기법을 이용하여 붕괴 유발 요소에 대한 중요도를 산정하였다. 그 결과, 지하수 처리, 지반조사의 부실, 시공상의 불안정 등이 흙막이 공사 붕괴 예방을 위한 중점 관리 요소로 도출되었다.