참고문헌
- Andersen, G., Cox, C., Chouinard, L. and Hover, W. (2001), "Prioritization of ten Embankment Dams according to physical feficiencies", J. Geotech. Geoenviron. Eng., 127(4), 335-345. https://doi.org/10.1061/(ASCE)1090-0241(2001)127:4(335)
- Andersen, G., Chouinard, L., Bouvier, C. and Back, W. (1999), "Ranking Procedure on Maintenance Tasks for Monitoring of Embankment Dams", J. Geotech. Geoenviron. Eng., 125(4), 247-259. https://doi.org/10.1061/(ASCE)1090-0241(1999)125:4(247)
- Ashtankar, V.B. and Chore, H.S. (2015), "Thermo-structural monitoring of RCC dam in India through instrumentation", Struct. Monit. Maint., 2(2), 95-113. https://doi.org/10.12989/SMM.2015.2.2.095
- Barai, S. and Pandey, P.C. (2004), "Knowledge based expert system approach to instrumentation selection (INSEL)", Transport, 19(4), 171-176.
- Bartholomew, C.L., Murray, C.B. and Goins, D.L. (1987), Embankment Dam Instrumentation Manual, U.S. Dept. of the Interior, Bureau of Reclamation.
- Bascetin, A. (2007), "A decision support system using analytical hierarchy process (AHP) for the optimal environmental reclamation of an open-pit mine", Environ. Geol., 52(4), 663-672. https://doi.org/10.1007/s00254-006-0495-7
- Bassett, R. (2012), A guide to field instrumentation in geotechnics: Principles, installation and reading, Abingdon, Oxon: Spon Press.
- Chavan, A.R. and Valunjkar, S.S. (2015), "A study of instruments used for dam instrumentation in gravity and earthen dams", Int. J. Eng. Technic. Res., 3(5), 355-361.
- Colombo, M., Domaneschi, M. and Ghisi, A. (2016), "Existing concrete dams: loads definition and finite element models validation", Struct. Monit. Maint., 3(2), 129-144. https://doi.org/10.12989/SMM.2016.3.2.129
- Dunnicliff, J. (1993), Geotechnical Instrumentation for Monitoring Field Performance, John Wiley and Sons, Inc., New York.
- Eberhardt, E. and Stead, D. (2011), Geotechnical Instrumentation, SME Mining Engineering Handbook, Ed., Peter Darling, 3rd ed. Society for Mining, Metallurgy, and Exploration (SME), Inc. 551-571.
- Fell, R., McGregor, P., Stapledon, D., Bell, G. and Foster, M. (2014), Geotechnical Engineering of Dams, EH Leiden,The Netherlands: CRC Press.
- FERC (1994), Instrumentation and Monitoring. In Engineering Guidelines for the Evaluation of Hydropower Projects. Federal Energy Regulatory Commission, Office of Hydropower Licensing, Washington DC.
- Gul, M., Celik, E., Aydin, N., Gumus, A.B. and Guneri, A.F. (2016), "A state of the art literature review of VIKOR and its fuzzy extensions on applications", Appl. Soft Comput., 46, 60-89. https://doi.org/10.1016/j.asoc.2016.04.040
- Hwang, C.L. and Yoon, K. (1981), Multiple Attribute Decision Making: Methods and Applications A State of the Art Survey. Springer-Verlag Berlin Heidelberg, New York.
- Jing, S., Niu, Z. and Chang, P.C. (2015), "The application of VIKOR for the tool selection in lean management", J. Intel. Manufact., doi:10.1007/s10845-015-1152-3.
- Kim, R.E., Li, J., Spencer, B.F., Nagayama Jr.T. and Mechitov, K.A. (2016), "Synchronized sensing for wireless monitoring of large structures", Smart Struct. Syst., 18(5), 885-909. https://doi.org/10.12989/sss.2016.18.5.885
- Kim, J.T., Sim, S.H., Cho, S., Yun, C.B. and Min, J. (2016), "Recent R&D activities on structural health monitoring in Korea", Struct. Monit. Maint., 3(1), 91-114. https://doi.org/10.12989/SMM.2016.3.1.091
- Kong, S.K. (2003), "Application of instrumentation system for safety control in basement construction works", BCA Seminar - Avoiding Failures in Excavation Works, Singapore.
- Kurniati, E., Sutanhaji, A.T. and Anggraini, O.A. (2013), "Land acquisition and resettlement action plan (LARAP) of Dam Project using Analytical Hierarchical Process (AHP): A case study in Mujur Dam, Lombok Tengah District-West Nusa Tenggara, Indonesia", Procedia Environ. Sci., 17, 418-423. https://doi.org/10.1016/j.proenv.2013.02.055
- Lee, A.H.I., Chen, W.C. and Chang, C.J. (2008), "A Fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan", Exp. Syst. Appl., 34(1), 96-107. https://doi.org/10.1016/j.eswa.2006.08.022
- Li, H.N., Li, D.S., Ren, L., Yi, T.H., Jia, Z.G. and Li, K.P. (2016), "Structural health monitoring of innovative civil engineering structures in Mainland China", Struct. Monit. Maint., 3(1), 1-32. https://doi.org/10.12989/SMM.2016.3.1.001
- Li, H.N., Yi, T.H., Ren, L., Li, D.S. and Huo, L.S. (2014), "Reviews on innovations and applications in structural health monitoring for infrastructures", Struct. Monit. Maint., 1(1), 1-45. https://doi.org/10.12989/SMM.2014.1.1.001
- Machan, G. and Bennett, V.G. (2008), Use of Inclinometers for Geotechnical Instrumentation on Transportation Projects: State of practice. In Transportation research circular E-C129, Washington, DC.
- Masoumi, I. and Rashidinejad, F. (2011), "Preference ranking of post-mining land use through LIMA framework", 9th International Conference on Clean Technologies for the Mining Industry, Santiago, Chile.
- Masoumi, I., Naraghi, S., Rashidi-nejad, F. and Masoumi, S. (2014), "Application of fuzzy multi-attribute decision-making to select and to rank the post-mining land-use", Environ. Earth Sci., 72(1), 221-231. https://doi.org/10.1007/s12665-013-2948-0
- Mauriya, V.K. (2010), "Geotechnical instrumentation in earth and rock-fill dams", Indian Geotechnical Conference, Mumbai.
- Nagarajaiah, S. and Erazo, K. (2016), "Structural monitoring and identification of civil infrastructure in the United States", Struct. Monit. Maint., 3(1), 51-69. https://doi.org/10.12989/smm.2016.3.1.051
- Naterop, D. (2002), "Instrumentation of geotechnical structures and new technologies of information new developments in instrumentation and data management", 8th Portuguese National Congress on Geotechnical Engineering, Lisbon.
- Negro, Jr. A., Karlsrud, K., Srithar, S., Ervin, M.C. and Voster, E. (2009), "Prediction, monitoring and evaluation of performance of geotechnical structures", Proceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering, Alexandria.
- Novak, P., Moffat, A.I.B., Nalluri, C. and Narayanan, R. (2007), Hydraulic Structures, Fourth Edition, CRC Press, New York.
- Opricovic, S. and Tzeng, G.H. (2002), "Multi criteria planning of post-earthquake sustainable reconstruction", Comput.-Aid. Civ. Infrastruct. Eng., 17(3), 211-220. https://doi.org/10.1111/1467-8667.00269
- Opricovic, S. and Tzeng, G.H. (2003), "Fuzzy multi criteria model for postearthquake land-use planning", Natural Haz. Rev., 4(2), 59-64. https://doi.org/10.1061/(ASCE)1527-6988(2003)4:2(59)
- Opricovic, S. and Tzeng, G.H. (2004), "Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS", Eur. J. Operat. Res., 156(2), 445-455. https://doi.org/10.1016/S0377-2217(03)00020-1
- Opricovic, S. and Tzeng, G.H. (2007), "Extended VIKOR method in comparison with outranking methods", Eur. J. Operat. Res., 178(2), 514-529. https://doi.org/10.1016/j.ejor.2006.01.020
- Pate-Cornell, M.E. and Tagaras, G. (1986), "Risk costs for new dams: Economic analysis and effects of monitoring", Water Resour. Res., 22(1), 5-14. https://doi.org/10.1029/WR022i001p00005
- Pehlivan, H. and Bayata, H.F. (2016), "Usability of inclinometers as a complementary measurement tool in structural monitoring", Struct. Eng. Mech., 58(6), 1077-1085. https://doi.org/10.12989/sem.2016.58.6.1077
- Saaty, T.L. (1980), "The Analytic Hierarchy Process", McGraw-Hill, New York.
- Saaty, T.L. (1990), "The Analytic Hierarchy Process", McGraw-Hill, New York.
- Saaty, T.L. and Vargas, L.G. (1994), "Decision making in economic, political, social, and technological environments with the analytic hierarchy process", RWS Publications, Pittsburgh.
- Safari, M., Ataei, M., Khalokakaei, R. and Karamozian, M. (2010), "Mineral processing plant location using the analytic hierarchy process-a case study: the Sangan iron ore mine (phase 1)", Mining Sci. Technol., 20(5), 691-695. https://doi.org/10.1016/S1674-5264(09)60264-7
- Samaras, G.D., Gkanas, N.I. and Vitsa, K.C. (2014), "Assessing risk in Dam projects using AHP and ELECTRE I", Int. J. Constr. Manage., 14(4), 255-266.
- San Cristobal Mateo, J.R. (2012), Multi Criteria Analysis in the Renewable Energy Industry, London: Springer.
- Sarsby, R.W. (2013), Environmental Geotechnics, Second Edition, ICE Publishing, Westminster, London, United Kingdom.
- Sharma, R.P. and Kumar, A. (2013), "Case histories of earthen dam failures", Seventh International Conference on Case Histories in Geotechnical Engineering, Chicago.
- Shayesteh, K., Ghashami, S. and Mirsanjari, M.M. (2015), "A survey on earthquake risk assessment of dams and prioritization of management strategies, using AHP method (Case study: Ekbatan Dam, Hamedan, Iran)", Int. J. Farm. Allied Sci., 4(3), 189-196.
- Singh, S., Olugu, E.U., Musa, S.N., Mahat, A.B. and Wong, K.Y. (2015), "Strategy selection for sustainable manufacturing with integrated AHP-VIKOR method under interval-valued fuzzy environment", Int. J. Adv. Manufact. Technol., 84(1), 547-563.
- Solinst Canada Ltd. (2013), Model 601 Standpipe Piezometer Datasheet, http://www.solinst.com/downloads/.
- Su, H., Wen, Z. and Wang, F. (2016), "Fractal behavior identification for monitoring data of dam safety", Struct. Eng. Mech., 57(3), 529-541. https://doi.org/10.12989/sem.2016.57.3.529
- USACE (1995), Instrumentation of Embankment Dams and Levees, U.S. Army Corps of Engineers, EM 1110-2-1908, Washington, DC.
- Yasser, M., Jahangir, K. and Mohammad, A. (2013), "Earth dam site selection using the analytic hierarchy process (AHP): a case study in the west of Iran", Arab. J. Geosci., 6(9), 3417-3426. https://doi.org/10.1007/s12517-012-0602-x
- Yavuz, M., Iphar, M. and Once, G. (2008), "The optimum support design selection by using AHP method for the main haulage road in WLC Tuncbilek colliery", Tunnelling Underground Space Technol., 23(2), 111-119. https://doi.org/10.1016/j.tust.2007.02.001
- Yi, T.H., Zhou, G.D., Li, H.N. and Zhang, X.D. (2015), "Optimal sensor placement for health monitoring of high-rise structure based on collaborative-climb monkey algorithm", Struct. Eng. Mech., 54(2), 305-317. https://doi.org/10.12989/sem.2015.54.2.305
- Yu, P.L. (1973), "A class of solutions for group decision problems", Manage. Sci., 19(8), 936-946. https://doi.org/10.1287/mnsc.19.8.936
- Zeleny, M. (1982), Multiple Criteria Decision Making, McGraw-Hill, New York.
- Zeng, Q.L., Li, D.D. and Yang, Y.B. (2013), "VIKOR method with enhanced accuracy for Multiple Criteria Decision Making in healthcare management", J. Med. Syst., 37(2), 9908. https://doi.org/10.1007/s10916-012-9908-1
피인용 문헌
- Optimization of tailings disposal method using fuzzy analytic hierarchy process pp.1607-0798, 2019, https://doi.org/10.2166/ws.2019.028
- Integrated fuzzy decision approach for reliability improvement of dam instrumentation and monitoring vol.3, pp.2, 2017, https://doi.org/10.1080/24705314.2018.1461546