Abstract
Purpose: Most enterprises adopt six sigma acts to maximize the business performance with raising the executiveness for the project improvements in each parts. But there are little studies about six sigma actual operations in manufacturing whether the six sigma improvements that have injected a lot of budget, efforts, labours and time are run properly. Methods: This study select 31 interviewees who have MBB or BB from 5 large enterprises running six sigma over 10 years and 5 SMEs running six sigma over 5 years to understand and review the operational status of six sigma actions in manufacturing industry and to secure representativeness. This study identify the operational status of six sigma actions and key factors enhancing or impeding execution of six sigma projects through face-to-face interviews and online surveys by e-mail. Results: This study figured out the operational status of six sigma actions and key factors enhancing or impeding execution of six sigma projects. We used SPSS 16.0 for the reliability and the validity of survey data. Conclusion: There can be a lot of different factors that affect six sigma project improvements besides the key factors from this study. More study need to think of the organization characteristics and the basic conditions and to remedy the unreasonable points and defects rather than following foreign companies and enterprises.