References
- Baker, B. N., Murphy, D. C., and Fisher, D. (2008), Factors affecting project success, Project Management Handbook, Second Edition, 902-919.
- Bevilacqua, M., Ciarapica, F. E., Germani, M., Mazzuto, G., and Paciarotti, C. (2014), Relation of project managers' personality and project performance: An approach based on value stream mapping, Journal of Industrial Engineering and Management, 7(4), 857.
- Burbidge, J. L. (1984a), A Production System Variable Connectance Model, Cranfield Institute of Technology, England.
- Chen, W. H. (1999), The manufacturing strategy and competitive priority of SMEs in Taiwan: A case survey, Asia Pacific Journal of Management, 16(3), 331-349. https://doi.org/10.1023/A:1015408114144
- Cil, I. and Evren, R. (1998), Linking of manufacturing strategy, market requirements and manufacturing attributes in technology choice: An expert system approach, The Engineering Economist, 43(3), 183-202. https://doi.org/10.1080/00137919808903196
- Cleland, D. L. and Ireland, L. R. (2006), Project management. McGraw-Hill Professional.
- Da Conceiao Junior, J. (2009), Achieving Breakthrough on Manufacturing Floor through Project-Based Organization, SAE Technical Paper.
- Diaz-Garrido, E., Martin-Pena, M. L., and Garcia-Muina, F. E. (2007), Structural and customization practices as elements of content operations strategy, International Journal of Production Research, 45(9), 2119-2140. https://doi.org/10.1080/00207540600735480
- Dvir, D., Lipovetsky, S., Shenhar, A., and Tishler, A. (1998), In search of project classification: A nonuniversal approach to project success factors, Research policy, 27(9), 915-935. https://doi.org/10.1016/S0048-7333(98)00085-7
- El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006), Comparing procurement methods for designbuild projects, Journal of construction engineering and management, 132(3), 230-238. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
- Erdani, Y. (2005), Acquisition of Human Expert Knowledge for Rule-based Knowledge-based Systems using Ternary Grid (Doctoral dissertation, Universitat Duisburg-Essen, Fakultat fur Ingenieurwissenschaften Elektrotechnik und Informationstechnik).
- Eriksson, P. E. and Westerberg, M. (2011), Effects of cooperative procurement procedures on construction project performance: A conceptual framework, International Journal of Project Management, 29(2), 197-208. https://doi.org/10.1016/j.ijproman.2010.01.003
- Gagnon, S. (1999), Resource based competition and the new operation strategy, International Journal of Operations & Production Management, 19(2), 125-38. https://doi.org/10.1108/01443579910247392
- Galbraith, J. R. (1971), Matrix organization designs How to combine functional and project forms, Business Horizons, 14(1), 29-40. https://doi.org/10.1016/0007-6813(71)90037-1
- Gareis, R. and Huemann, M. (2000), Project management competences in the project-oriented organization, Gower handbook of project management, 3.
- GroBler, A. (2007), A dynamic view on strategic resources and capabilities applied to an example from the manufacturing strategy literature, Journal of Manufacturing Technology Management, 18(3), 250-266. https://doi.org/10.1108/17410380710730594
- GroBler, A. and Grubner, A. (2006), An empirical model of the relationships between manufacturing capabilities, International Journal of Operations & Production Management, 26(5), 458-485. https://doi.org/10.1108/01443570610659865
- Hayes, R. H. and Wheelwright, S. C. (1984), Restoring our Competitive Edje, Competing Through Manufacturing, John Wiley and son, New York, NY. 3-24.
- Hung, S.-W., Hung, S.-C., and Lin, M.-J. J. (2011), How different strategic alliances affect manufacturing competitive priority and firm performance: An empirical study of SMEs. ICSB World Conference Proceedings: Washington: International Council for Small Business.
- Jayaram, J. and Narasimhan, R. (2007), The influence of new product development competitive capabilities on project performance, Engineering Management, IEEE Transactions on, 54(2), 241-256. https://doi.org/10.1109/TEM.2007.893992
- Karacapilidis, N., Adamides, E., and Evangelou, C. (2006), A computerized knowledge management system for the manufacturing strategy process, Computers in Industry, 57(2), 178-188. https://doi.org/10.1016/j.compind.2005.07.001
- Kruger, L. (2012), Developing operations strategies-reassessing the strength and importance of competitive operations priorities for South African businesses, South African Journal of Business Management, 43(3), 13-28.
- Lamvik, T., Moseng, B., and Gjerstad, T. (2003), Manufacturing Strategy Best Practices and Cases.
- Lee, W. S., Huang, A. Y., Chang, Y. Y., and Cheng, C. M. (2011), Analysis of Decision Making Factors for Equity Investment by DEMATEL and Analytic Network Process, Expert Systems with Applications, 38(7), 8375-8383. https://doi.org/10.1016/j.eswa.2011.01.027
- Lee Gan Kai, W. (2007), A decision model for manufacturing best practice adoption: Linking practices to competitive strategies, Doctoral dissertation, Cranfield University.
- Leong, G. K., Snyder, D. L., and Ward, P. T. (1990), Research in the process and content of manufacturing strategy, Omega, 18(2), 109-122. https://doi.org/10.1016/0305-0483(90)90058-H
- Levitt, R. E. (2012), The virtual design team: Designing project organizations as engineers design bridges. Journal of Organization Design, 1(2), 14-41. https://doi.org/10.7146/jod.6345
- Love, P. E. (2002), Influence of project type and procurement method on rework costs in building construction projects, Journal of Construction Engineering and Management, 128(1), 18-29. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18)
- Maylor, H., Turner, N., and Murray-Webster, R. (2015), "It worked for manufacturing...!" Operations strategy in project-based operations, International Journal of Project Management, 33(1), 103-115. https://doi.org/10.1016/j.ijproman.2014.03.009
- Miltenburg, J. (2005), Manufacturing Strategy: How to Formulate and Implement a Winning Plan. CRC Press.
- Muller, R. and Turner, J. R. (2007), Matching the project manager's leadership style to project type, International Journal of Project Management, 25(1), 21-32. https://doi.org/10.1016/j.ijproman.2006.04.003
- Muller, R. and Turner, R. (2010), Leadership competency profiles of successful project managers, International Journal of Project Management, 28(5), 437-448. https://doi.org/10.1016/j.ijproman.2009.09.003
- Mun, J., Shin, M., Wi, H., Lee, K., and Jung, M. (2008), A VO formation process of a project-based organization with trust evaluation using goal achievement probability, Paper presented at the Management of Engineering & Technology, 2008, PICMET 2008. Portland International Conference on.
- Oltra, M., Maroto, C., and Segura, B. (2005), Operations strategy configurations in project process firms, International Journal of Operations & Production Management, 25(5), 429-448. https://doi.org/10.1108/01443570510593139
- PMBOK, A. (2000), Guide to the Project Management Body of Knowledge, Project Management Institute, Pennsylvania USA.
- Sackett, P. J., Maxwell, D. J., and Lowenthal, P. A. (1997), Customizing manufacturing strategy, Integrated Manufacturing Systems, 8(6), 359-364. https://doi.org/10.1108/09576069710188779
- Soderlund, J. (2004), Building theories of project management: past research, questions for the future, International Journal of Project Management, 22(3), 183-191. https://doi.org/10.1016/S0263-7863(03)00070-X
- Spring, M. and Dalrymple, J. F. (2000), Product customisation and manufacturing strategy, International Journal of Operations & Production Management, 20(4), 441-467 . https://doi.org/10.1108/01443570010314782
- Tamura, H. (2013), Expert system for new product strategy development, Advances in Production Management Systems: Perspectives and future challenges, 303.
- Tan, K. and Platts, K. (2004), The connectance model revisited: a tool for manufacturing objective deployment, Journal of Manufacturing Technology Management, 15(2), 131-143. https://doi.org/10.1108/09576060410513724
- Theodorou, P. and Florou, G. (2008), Manufacturing strategies and financial performance-The effect of advanced information technology: CAD/CAM systems. Omega, 36(1), 107-121. https://doi.org/10.1016/j.omega.2005.10.005
- Turner, J. R. (2014), The Handbook of Project-Based Management (Vol. 92), McGraw-hill.
- Turner, J. R. and Keegan, A. (1999), The versatile projectbased organization: Governance and operational control, European Management Journal, 17(3), 296-309. https://doi.org/10.1016/S0263-2373(99)00009-2
- Turner, J. R. and Keegan, A. (2001), Mechanisms of governance in the project-based organization: Roles of the broker and steward, European Management Journal, 19(3), 254-267. https://doi.org/10.1016/S0263-2373(01)00022-6
- Turner, J. R. and Muller, R. (2005), The Project Manager's Leadership Style as a Success Factor on Projects: A Literature Review, Project Management Institute.
- Wysocki, R. K. (2002), Building Effective Project Teams, Wiley.
- Wysocki, R. K. (2003), Effective Project Management: Traditional, Adaptive, Extreme, John Wiley & Sons.
- Zar, J. H. (1999), Bio Statistical Analysis, 4th Ed. Upper saddle river, New Jersey: Prentice Hall.
- Zhou, Q., Huang, W., and Ying, Z. (2011), Identifying critical success factors in emergency management using a fuzzy dematel method, Safety Science, 49(2), 243-252. https://doi.org/10.1016/j.ssci.2010.08.005