DOI QR코드

DOI QR Code

A Study on a Smart Factory Layout Design Based on TOC-DBR

TOC-DBR 기반의 스마트공장 레이아웃 설계에 관한 연구

  • Kim, Byung-Joo (Department of Industrial and Systems Engineering, Gyeongsang National University and Korea Aerospace Industry) ;
  • Kim, Deok Hyun (Korea Aerospace Industry) ;
  • Lee, In Su (Korea Aerospace Industry) ;
  • Jun, Cha-Soo (Department of Industrial and Systems Engineering & Engineering Research Institute, Gyeongsang National University)
  • 김병주 (경상대학교 대학원 산업시스템공학과, 한국항공우주산업) ;
  • 김덕현 (한국항공우주산업) ;
  • 이인수 (한국항공우주산업) ;
  • 전차수 (경상대학교 산업시스템공학부.공학연구원)
  • Received : 2016.06.20
  • Accepted : 2017.01.29
  • Published : 2017.02.15

Abstract

This study presents a plant concept design for a smart factory which is mainly targeted to machine airplane parts. The plant layout is based on the TOC-DBR approach together with autonomous distributed factory control considered, while discrete event simulation is also performed in order to validate its layout. The resulting layout and its procedure turn out to be quite a useful guideline in realizing those smart factories especially for machining-oriented manufacturing industries.

Keywords

References

  1. Altiok, T. (1983), The Allocation of Interstage Buffer Capacities in Production Lines, IIE Transactions, 15(4), 292-299. https://doi.org/10.1080/05695558308974650
  2. Bae, S. Y. (2006), The Information of Dispatching Rules for Improving Job Shop Performance, Journal of the Society of Korea Industrial and Systems Engineering, 29(4), 107-112.
  3. Baker, K. R. (1974), Introduction to Sequencing and Scheduling, John Wiley & Sons Inc., New York, 2-8.
  4. Choi, K. S. (2001), Password TOC for Corporate, HanEon Community.
  5. Chung, N. K. (2002), TOC Constraint management, HanEon Community.
  6. KEPD (2014), KEIT PD The present condition and the outlook of Smart Factory, PD ISSUE REPORT OCTOBER 2014, 14(10), 53-72.
  7. Koh, H. G. (2001), On the Size of the Constraint Buffer in the TOC (Theroy of Constraints).
  8. Koh, H. G. and Yoon, H. Y. (2002), On the Size of the Constraint Buffer in The TOC(Theory of Constraints), IE interfaces, 14(4), 248-265.
  9. Lee, K. S. (2002), The Study for Protective Capacity and Time Buffer of DBR, 2002 Fall Conference Proceeding of the JKIIE, 248-265.
  10. Nam, S. H., Lee, J. Y., Yun, J. S., Kim, B. H., and Kim, C. H. (2014), Korea Evaluation Institute of Industrial Technology, The domestic and overseas status and prospect of the smart factory, 14(10), 54-72.
  11. NIA (2014), Industry 4.0 & Creative Economy Strategies of Manufacture Industry, IT & Future Strategy Report.
  12. Park, Y. H. (2002), Multi-Factor Analysis of Firm-Level Performance Through Feed-Forward, Feed-Back Relationships, The Korea Society For Simulation, 11(1), 59-70.
  13. Park, J. W. (2016), Policy and business case of government about Smart factory, Industrial Engineering Magazine, 23(1), 13-17.
  14. Yim. J. I. and Kim, Y. W. (2015), Functional Model for Smart Factory, 2015 Summer Conference Proceeding of the KICS, 208-209.

Cited by

  1. Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point vol.41, pp.4, 2018, https://doi.org/10.11627/jkise.2018.41.4.022
  2. Determination of the Pallet Quantity Using Simulation in the FMS for Aircraft Parts vol.41, pp.4, 2018, https://doi.org/10.11627/jkise.2018.41.4.059