참고문헌
- Ballestin, F. and Leus, R. (2009), Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations, Production and Operations Management, 18(4), 459-474. https://doi.org/10.1111/j.1937-5956.2009.01023.x
- Braysy, O. and Gendreau, M. (2005), Vehicle Routing Problem with Time Windows, Part I : Route Construction and Local Search Algorithms, Transportation Science, 39(1), 104-118. https://doi.org/10.1287/trsc.1030.0056
- Bruni, M. E., Beraldi, P., Guerriero, F., and Pinto, E. (2011), A Heuristic Approach for Resource Constrained Project Scheduling with Uncertain Activity Durations, Computers and Operations Research, 38(9), 1305-1318. https://doi.org/10.1016/j.cor.2010.12.004
- Fernandez, A. A., Armacost, R. L., and Pet-Edwards, J. J. (1998), Understanding Simulation Solutions to Resource Constrrained Project Scheduling Problems with Stochastic Task Duration, Engineering Management Journal, 10(4), 5-13.
- Fleszar, K. and Hindi, K. S. (2004), Solving the Resource-Constrained Project Scheduling Problem by a Variable Neighborhood Search, European Journal of Operations Research, 155(2), 402-413. https://doi.org/10.1016/S0377-2217(02)00884-6
- Graham, R. L. (1966), Bounds for Certain Multiprocessing Anomalies, Bell System Technical Journal, 45(9), 1563-1581. https://doi.org/10.1002/j.1538-7305.1966.tb01709.x
- Hansen, P., Mladenovic, N., and Perez, J. A. M. (2010), Variable Neighborhood Search : Methods and Applications, Annals of Operations Research, 175(1), 367-407. https://doi.org/10.1007/s10479-009-0657-6
- Kolisch, R. and Hartman, S. (2006), Experimental Investigation of Heuristics for Resource-Constrained Project Scheduling : An Update, European Journal of Operational Research, 174(1), 23-37. https://doi.org/10.1016/j.ejor.2005.01.065
- Kolisch, R. and Sprecher, A. (1996), PSPLIB-A project scheduling library, European Journal of Operational Research, 96(1), 205-216. https://doi.org/10.1016/S0377-2217(96)00170-1
- Li, H. and Womer, N. K. (2015), Solving Stochastic Resource-Constrained Project Scheduling Problems by Closed-Loop Approximate Dynamic Programming, European Journal of Operational Research, 246(1), 20-33. https://doi.org/10.1016/j.ejor.2015.04.015
- Li, K. Y. and Willis, R. J. (1992), An Iterative Scheduling Technique for Resource-Constrained Project Scheduling, European Journal of Operational Research, 56(3), 370-379. https://doi.org/10.1016/0377-2217(92)90320-9
- Li, S., Jia, Y., and Wang, J. (2012), A Discrete-Event Simulation Approach with Multiple-Comparison Procedure for Stochastic Resource-Constrained Project Scheduling, International Journal of Advanced Manufacturing Technology, 63(1), 65-76. https://doi.org/10.1007/s00170-011-3885-2
- Stork, F. (2001), Stochastic Resource-Constrained Project Scheduling, Ph. D. thesis, Technische Universitat Berlin.
- Tsai, Y.-W. and Gemmil, D. D. (1998), Using Tabu Search to Schedule Activities of Stochastic Resource-Constrained Projects, European Journal of Operational Research, 111(1), 129-141. https://doi.org/10.1016/S0377-2217(97)00311-1
- Tseng, L.-Y. and Chen, S.-C. (2006), A Hybrid Metaheuristic for the Resource-Constrained Project Scheduling Problem, European Journal of Operational Research, 175(2), 707-721. https://doi.org/10.1016/j.ejor.2005.06.014
- Valls, V., Ballestin, F., and Quintanilla, S. (2004), A Population-Based Approach to the Resource-Constrained Project Scheduling Problem, Annals of Operations Research, 131(1), 305-324. https://doi.org/10.1023/B:ANOR.0000039524.09792.c9
- Valls, V., Ballestin, F., and Quintanilla, S. (2008), A Hybrid Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, European Journal of Operational Research, 185(2), 495-508. https://doi.org/10.1016/j.ejor.2006.12.033
- Yim, D. S. (2011), Performance Analysis of Local Optimization Algorithms in Resource-Constrained Project Scheduling Problem, Journal of the Korean Institute of Industrial Engineers, 37(4), 408-414. https://doi.org/10.7232/JKIIE.2011.37.4.408