References
- Abeles, P.W. (1966), Introduction to Pre-stressed Concrete Vol. II, Concrete Publications Ltd., London, England.
- Akshatha, S., Katta, V. and Babu Narayan, K.S. (2015), "Studies on load deflection behaviour of corroded RC beams", Indian Concrete Inst. J., July-September, 9-17.
- Alizadeh, E. and Dehestani, M. (2015), "Analysis of composite girders with hybrid GFRP hat shape section and concrete slab", Struct. Eng. Mech., 54(6), 1135-1152 https://doi.org/10.12989/sem.2015.54.6.1135
- Barrios, F. and Ziehl, P.H. (2012), "Cyclic load testing for integrity evaluation of pre-stressed concrete girders", Struct. J., 109(9), 615-624.
- Cai, C.S. and Shahawy, M. (2004), "Predicted and measured performance of pre-stressed concrete bridges", J. Bridge Eng., 9(1), 4-13. https://doi.org/10.1061/(ASCE)1084-0702(2004)9:1(4)
- Dang, C.N., Murray, C.D., Floyd, R.W., Hale, W.M. and Marti-Vargas, J.R. (2014), "A correlation of strand surface quality to transfer length", Struct. J., 111(5), 1245-1252.
- Elabadry, M., Ghali, A. and Gayed, R. (2014), "Deflection control of pre-stressed box girder bridges", J. Bridge Eng., 19(5), 04013027. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000564
- IRC-SP 37 (2010), Guidelines for evaluation of load carrying capacity of bridges, Indian Roads Congress-Special Publication, New Delhi, India.
- IRC-SP 51 (1999), Guidelines for load testing of bridges, Indian Roads Congress-Special Publication, New Delhi, India.
- Kottari, A.K. and Benson Shing, P. (2014), "Estimation of long term pre-stress losses in post tensioned girders", Struct. J., 111(5), 1091-1100.
- Kumar, S., Dubey, D. and Kute, S. (2014), "An experimental investigation on the ultimate strength of epoxy repaired braced partial in filled RC frames", Int. J. Adv. Struct. Eng., 6, 49. https://doi.org/10.1007/s40091-014-0049-2
- Naser, A.F. and Wang, Z.L. (2012), "Experimental monitoring of the strengthening construction of a segmental box girder bridge and field testing of external pre-stressing tendons anchorage", Front. Struct. Civil Eng., 6(3), 308-320.
- Pape, T.M. and Melchers, R.E. (2011), "The effects of corrosion on 45 year old pre-stressed concrete bridge beams", Struct. Infrastr. Eng., 7(1-2), 101-108. https://doi.org/10.1080/15732471003588411
- Samaaneh, M.A., Sharif, A.M., Baluch, M.H. and Azad, A.K. (2016), "Numerical investigation of continuous composite girders strengthened with CFRP", Steel Compos. Struct., 21(6), 1307-1325. https://doi.org/10.12989/scs.2016.21.6.1307
- Xiao, Y., Li, L. and Yang, R. (2014), "Long term loading behaviour of a full scale glubam bridge model", J. Bridge Eng., 19(9), 04014027. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000600