References
- Sarin, S.C., Varadarajan, A. and Wang, L., 2011, A Survey of Dispatching Rules for Operational Control in Wafer Fabrication, Production Planning & Control, 22(1), pp.4-24. https://doi.org/10.1080/09537287.2010.490014
- Chern, C.C. and Liu, Y.L., 2003, Family-based Scheduling Rules of a Sequence-dependent Wafer Fabrication System, IEEE Transaction on Semiconductor Manufacturing, 16(1), pp.15-25. https://doi.org/10.1109/TSM.2002.807742
- Shen, Y. and Leachman, R.C., 2003, Stochastic Wafer Fabrication Scheduling, IEEE Transaction on Semiconductor Manufacturing, 16(1), pp.2-14. https://doi.org/10.1109/TSM.2002.807743
- Zhou, M. and Jeng, M.D., 1998, Modeling, Analysis, Simulation, Scheduling, and Control of Semiconductor Manufacturing Systems: A Petri Net Approach, IEEE Transaction on Semiconductor Manufacturing, 11(3), pp.333-357. https://doi.org/10.1109/66.705370
- Miwa, T., Nishihara, N. and Yamamoto, K., 2005, Automated Stepper Load Balance Allocation System, IEEE Transaction on Semiconductor Manufacturing, 18(4), pp.510-516. https://doi.org/10.1109/TSM.2005.858472
- Arisha, A. and Young, P., 2004, Intelligent Simulation-based Lot Scheduling of Photolithography Toolsets in a Wafer Fabrication Facility, Proceedings of the 2004 Winter Simulation Conference.
- Monch, L., Prause, M. and Schmalfuss, V., 2001, Simulation-based Solution of Load Balancing Problems in the Photolithography Area of a Semiconductor Wafer Fabrication Facility, Proceedings of the 2004 Winter Simulation Conference.
- Elif, A. and Nemoto, K., 2001, Cycle-time Improvements for Photolithography Process in Semiconductor Manufacturing, IEEE Transaction on Semiconductor Manufacturing, 14(1), pp.48-56. https://doi.org/10.1109/66.909654
- Wu, M.C., Chiou, S.J. and Chen, C.F., 2008, Dispatching for Make-to-order Wafer Fabs with Machine-dedication and Mask Set-up Characteristics, International Journal of Production Research, 46(14), pp.3993-4009. https://doi.org/10.1080/00207540601085919
- Wu, M.C., Huang, Y.L., Chang, Y.C. and Yang, K.F., 2006, Dispatching in Semiconductor Fabs with Machine-dedication Features, International Journal of Advanced Manufacturing Technology, 28, pp.978-984. https://doi.org/10.1007/s00170-004-2431-x
- Morton, T.E. and Pentico, D.W., 1993, Heuristic Scheduling Systems, Wiley, New York, 720p.
- Glassey, C.R. and Resende, M.G.C., 1988, A Scheduling Rule for Job Release in Semiconductor Fabrication, Operations Research Letters, 7(5), pp.213-217. https://doi.org/10.1016/0167-6377(88)90033-8
- Neuts, M.F., 1967, A General Class of Bulk Service Queue with Poisson Input, The Annals of Mathematical Statistics, 38(3), pp.759-770. https://doi.org/10.1214/aoms/1177698869
- Shr, A.M.D., Liu, A. and Chen, P.P., 2008, Load Balancing among Photholithography Machines in the Semiconductor Manufacturing System, Journal of Information Science and Engineering, 24, pp.379-391.