DOI QR코드

DOI QR Code

풍력자원평가를 위한 단순지형에서의 육상 기상탑 바람 데이터의 상호 적용

Mutual Application of Met-Masts Wind Data on Simple Terrain for Wind Resource Assessment

  • 손진혁 (제주대학교 대학원 풍력특성화협동과정) ;
  • 고경남 (제주대학교 대학원 풍력공학부) ;
  • 허종철 (제주대학교 기계공학과) ;
  • 김인행 (제주에너지공사 에너지연구 기술센터)
  • Son, Jin-Hyuk (Multidisciplinary Graduate School Program for Wind Energy, Graduate School, Jeju National University) ;
  • Ko, Kyung-Nam (Faculty of Wind Energy Engineering, Graduate School, Jeju National University) ;
  • Huh, Jong-Chul (Department of Mechanical Engineering, Jeju National University) ;
  • Kim, In-Haeng (Department of Energy Research Technology Center, Jeju Energy Corporation)
  • 투고 : 2017.08.22
  • 심사 : 2017.09.21
  • 발행 : 2017.12.31

초록

In order to examine if met-masts wind data can exchange each other for wind resource assessment, an investigation was carried out in Kimnyeong and Haengwon regions of Jeju Island. The two regions are both simple terrain and 4.31 km away from each other. The one-year wind speed data measured by 70 m-high anemometers of each met-mast of the two regions were analysed in detail. Measure-Correlate-Predict (MCP) method was applied to the two regions using the 10-year Automatic Weather System (AWS) wind data of Gujwa region for creating 10-year Wind Statistics by running WindPRO software. The two 10-year Wind Statistics were applied to the self-met mast point for self prediction of Annual Energy Production (AEP) and Capacity Factor (CF) and the each other's met mast point for mutual prediction of them. As a result, when self-prediction values were reference, relative errors of mutual prediction values were less than 1% for AEP and CF so that met masts wind data under the same condition of this study could exchange each other for estimating accurate wind resource.

키워드

참고문헌

  1. D. G. Won, 2016, "KEMRI Electric Power Economy Review Special Report", Kepco Economy & Management Research Institute, pp. 1-6.
  2. C. V. Hernandez, T. Telsnig and A. V. Pradas, 2017, "JRC Science for Policy Report, 2016 Edition, Market Technology and Regulatory Aspects of Wind Energy", European Commission Publication, pp. 3-4.
  3. P. Jain, 2011, "Wind Energy Engineering", The MCGraw-Hill Companies, INC. pp. 122-123.
  4. K. N. Koh, J. C. Huh, 2006, "The Introduction to Wind Engineering", MunUnDang, p. 34.
  5. N. H. Kim, K. N. Koh and S. B. Yang, 2015, "Offshore Wind Farm", CIR, pp. 32-33.
  6. M. C. Brower et al, 2012, "Wind Resource Assessment, A Practical Guide to Developing a Wind Project", A JOHN WILEY & SONS, INC. Publication, pp. 16-22.
  7. M. H. Zhang, "Wind Resource Assessment And Micro-Siting", WILEY, p. 6.
  8. A. J. Bowen and N. G. Mortensen, 2004, "WAsP Prediction Errors due to Site Orography, Technical Report Ris-R-995(EN)", Riso National Laboratory, pp. 33-35.
  9. DTU, "WAsP 11 Help Facility and On-line Documentation", Department of Wind Energy, Technical University of Denmark(DTU).
  10. J. Y. Hyeon et al., 2014, "Measurement and Verification of Wind Shear in Kimnyeong of Jeju using Lidar", Journal of The Korean Society for Power System Engineering, Autumn Conference, pp.112-114.
  11. J. K. Byun and J. H. Son, 2016, "Reliability Assessment of ERA-Interim/MERRA Reanalysis Data for The Offshore Wind Resource Assessment", Journal of The Korean Society for Power System Engineering Vol. 20, No. 4, pp. 44-51. https://doi.org/10.9726/kspse.2016.20.4.044
  12. P. Jain, 2011, "Wind Energy Engineering", The MCGraw-Hill Companies, INC. pp. 127-135.
  13. 2005, "IEC 61400-1, Wind Turbines - Part 1: Design Requirements, 3rd Edition".
  14. S. G. Hyun, M. S Jang and S. H. Ko, 2013, "Variability Characteristics Analysis of the Long-Term Wind and Wind Energy Using MCP Method", Journal of The Korean Solar Energy Society, Vol. 33, No. 5, pp. 1-8. https://doi.org/10.7836/kses.2013.33.5.001
  15. P. Nielsen et al., 2013, "Wind Pro 2.9 User Guide, 1. Edition", EMD International A/S, p. 529.