- International Atomic Energy Agency, "Wien Automatic System Planning(WASP) Package User's Manual," 2006.
- Rho, D. and Lee K., A Study on Capacity Adequacy in Cost Based Pool Market," 2009.
- The ministry of knowledge economy, "The 6th Basic Plan for Long-term Electricity Supply and Demand (2013-2027)," 2013.
- The ministry of knowledge economy, "The 7th Basic Plan for Long-term Electricity Supply and Demand (2015-2029)," 2015.
- Baleriaux, H., E. Jamoulle, and Fr Linard de Guertechin., "Simulation of operating a fleet of thermal machines producing electricity couple has pumping stations," Revue E, Vol. 5, No. 7, pp. 225-245, 1967.
- Hoffer, J., "Modelling the partial planned outages in production costing simulation," International Journal of Electrical Power & Energy Systems, Vol. 17, No. 6, pp. 377-380, 1995. https://doi.org/10.1016/0142-0615(95)00052-6
- The ministry of knowledge economy, "A Study on Improvement on the Process of The Basic Plan of Long-Term Electricity Supply and Demand,", July 2010.
- Bloom, Jeremy A., "Long-range generation planning using decomposition and probabilistic simulation," IEEE Transactions on Power Apparatus and Systems, PAS- 101, No. 4, pp. 797-802, 1982. https://doi.org/10.1109/TPAS.1982.317144
- Booth, Robert R., "Power system simulation model based on probability analysis," IEEE Transactions on Power Apparatus and Systems, PAS-91, No. 1, pp. 62-69, 1972. https://doi.org/10.1109/TPAS.1972.293291
- Kim, J. and Park, J., "Probabilistic Generation Modeling in Electricity Markets Considering Generator Maintenance Outage," The Transactions of the Korea Institute of Electrical Engineering, Vol. 54A, No. 8, pp. 418-425, August 2005.
- Kim, Y., Kim, K., Park, J. and Oh, S., "A Study On the Determination of Reliability Criteria in Generation Expansion Planning Through LOLP Sensitivity Analysis," Journal of Energy Engineering, Vol. 4, No. 2, pp. 197- 202, October 1995.
- Park, Y., Ahn, B., Jeong, L., Rye, S. and Kim, H., "LOLP sensitivity analysis with WASP-IV model," Proceeding of the KIEE fall conference, November 2009.
- Bakirtzis, Grigorios A., Pandelis N. Biskas, and Vasilis Chatziathanasiou., "Generation expansion planning by MILP considering mid-term scheduling decisions," Electric Power Systems Research 86, pp. 98-112, 2012. https://doi.org/10.1016/j.epsr.2011.12.008
- Min, Xie, Chen Jinfu, and Duan Xian Zhong., "Generator maintenance scheduling in the generation expansion planning of interconnected power system," Transmission and Distribution Conference and Exhibition 2002, Asia Pacific. IEEE/PES, 3, 2002.
- Sardou, Iman Goroohi, and Mohammad Taghi Ameli., "Generation Maintenance Scheduling for Generation Expansion Planning Using a Multi-Objective Binary Gravitational Search Algorithm," International Transaction of Electrical and Computer Engineers System, Vol. 2, No. 2, pp. 44-55, 2014.
- Han, Sangheon, et al., "Optimization of Generator Maintenance Scheduling with Consideration on the Equivalent Operation Hours," Journal of Electrical Engineering & Technology, Vol. 11, No. 2, pp. 338-346, 2016. https://doi.org/10.5370/JEET.2016.11.2.338
- Shin, H., Kim, H., Lee, S. and Kim, W., " Optimization of Long-term Generator Maintenance Scheduling considering Network Congestion and Equivalent Operating Hours," The Transactions of the Korea Institute of Electrical Engineering, Vol. 66, No. 2, pp. 305-314, February 2017.
- Korea Power Exchange, "Outage Statistics of Power Plant(2012)," 2013.
- Korea Power Exchange, "Outage Statistics of Power Plant(2013)," 2014.
- Korea Power Exchange, "Outage Statistics of Power Plant(2014)," 2015.
- Korea Power Exchange, "Outage Statistics of Power Plant(2015)," 2016.
- Korea Power Exchange, "Power Plant Status (2015)," 2016.
- Korea Power Exchange, "Power Plant Status (2016)," 2017.
- Korea Power Exchange, "A study on pump storage power plant operation considering system reliability," March 2013.