References
- Adiri, I. and Pohoryles, D. (1982), Flow shop/no-idle or no-wait scheduling to minimize the sum of completion times, Naval Research Logistics, 29, 495-504. https://doi.org/10.1002/nav.3800290311
- Aldowaisan, T. and Allahverdi, A. (2003), New heuristics for no-wait flow shops to minimize makespan, Computers and Operations Research, 30, 1219-1231. https://doi.org/10.1016/S0305-0548(02)00068-0
- Allahverdi, A. (In Press), A Survey of scheduling problems with no-wait in process, European Journal of Operational Research, doi: 10.1016/j.ejor.2016.05.036.
- Aydilek, H. and Allahverdi, A. (2012), Heuristics for no-wait flowshops with makespan subject to mean completion time, Applied Mathematics and Computation, 219, 351-359. https://doi.org/10.1016/j.amc.2012.06.024
- Baker, K. R. (1974), Introduction to sequencing and scheduling, Wiley.
- Bertolissi, E. (2000), Heuristic algorithm for scheduling in the no-wait flow-shop, Journal of Materials Processing Technology, 107, 459-465. https://doi.org/10.1016/S0924-0136(00)00720-2
- Bonney, M. C. and Gundry, S. W. (1976), Solutions to the constrained flowshop sequencing problem, Operations Research Quarterly, 24, 869-883.
- Chaudhry, I. A. and Khan, A. M. (2012), Minimizing makespan for a no-wait flowshop using genetic algorithm, Sadhana, 37(6), 695-707. https://doi.org/10.1007/s12046-012-0105-1
- Ding, J.-Y., Song, S., Gupta J. N. D., Zhang, R., Chiong, R., and Wu, C. (2015), An improved iterated greedy algorithm with a tabu-based reconstruction strategy for the no-wait flowshop scheduling problem, 30, 604-613. https://doi.org/10.1016/j.asoc.2015.02.006
- Fink, A. and Vobb, S. (2003), Solving the continuous flow-shop scheduling problem by metaheuristics, European Journal of Operational Research, 151, 400-414. https://doi.org/10.1016/S0377-2217(02)00834-2
- Framinan, J. M. and Nagano, M. S. (2008), Evaluating the performance for makespan minimisation in nowait flowshop sequencing, Journal of Materials Processing Technology, 97, 1-9.
- Franca, P. M., Tin, A. G., and Buriol, L. S. (2006), Genetic algorithms for the no-wait flowshop sequencing problem with time restrictions, International Journal of Producrion Research, 44(5), 939-957. https://doi.org/10.1080/00207540500282914
- Gangadharan, R. and Rajendran, C. (1993), Heuristic algorithms for scheduling in the no-wait flowshop, International Journal of Production Economics, 32, 285-290. https://doi.org/10.1016/0925-5273(93)90042-J
- Grabowski, J. and Pempera, J. L. (2005), Some local search algorithms for no-wait flow-shop problem with makespan criterion, Computers and Operations Research, 32, 2197-2212. https://doi.org/10.1016/j.cor.2004.02.009
- Hall, N. G. and Sriskandarajah C. (1996), A survey of machine scheduling problems with blocking and no-wait in process, Operations Research, 44, 510-525. https://doi.org/10.1287/opre.44.3.510
- Johnson, S. M. (1954), Optimal two-and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, 1, 61-68. https://doi.org/10.1002/nav.3800010110
- King, J. R. and Spachis, A. S. (1980), Heuristics for flowshop scheduling, International Journal of Production Research, 18, 343-357.
- Laha, D. and Chakraborty, U. K. (2009), A constructive heuristic for minimizing makespan in no-wait flow shop scheduling, International Journal of Advanced Manufacturing Technology, 41, 97-109. https://doi.org/10.1007/s00170-008-1454-0
- Laha, D., Gupta, J., and Sapkal, S. (2013), A penaltyshift-insertion-based algorithm to minimize total flow time in no-wait flow shops, Journal of the Operational Research Society, 1-13.
- Laha, D. and Sapkal, S. (2014), An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop, Computers and Industrial Engineering, 67, 36-43. https://doi.org/10.1016/j.cie.2013.08.026
- Li, X., Wang Q., and Wu, C. (2008), Heuristic for nowait flow shops with makespan minimization, International Journal of Production Research, 46, 2519-2530. https://doi.org/10.1080/00207540701737997
- Li, X. and Wu, C. (2008), Heuristic for no-wait flow shops with makespan minimization based on total idle-time increments, Science in China Series FInformation Science, 51(7), 896-909. https://doi.org/10.1007/s11432-008-0080-7
- Liu, B., Wang, L., and Jin, Y. H. (2007), An effective hybrid particle swarm optimization for no-wait flow shop scheduling, International Journal of Advanced Manufacturing Technology, 31(9/10), 1001-1011. https://doi.org/10.1007/s00170-005-0277-5
- Nagano, M. S. and Miyata, H. H. (In press), Review and classification of constructive heuristics for no-wait flow shop problem, International Journal of Advanced Manufacturing Technology, DOI: 10.1007/s00170-015-8209-5.
- Nagano, M. S., Silva, A. A., and Lorena, L. A. N. (2012), A new evolutionary clustering search for a no-wait flow shop problem with set-up times, Engineering Applications of Artificial Intelligence, 25, 1114-1120. https://doi.org/10.1016/j.engappai.2012.05.017
- Nagano, M. S., Silva, A. A., and Lorena, L. A. N. (2014), An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times, Expert Systems with Applications, 41, 3628-3633. https://doi.org/10.1016/j.eswa.2013.12.013
- Nagano, M. S., Miyata, H. H., and Araújo, D. C. (2015), A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times, Journal of Manufacturing Systems, 36, 224-230. https://doi.org/10.1016/j.jmsy.2014.06.007
- Nawaz, M., Enscore, E. Jr., and Ham, I. (1983), A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, 1, 91-95.
- Pan, Q.-K., Tasgetiren, M. F., and Liang, Y.-C. (2008), A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem, Computers and Operations Research, 35, 2807-2839. https://doi.org/10.1016/j.cor.2006.12.030
- Pan, Q.-K., Wang, L., and Zhao, B.-H. (2012), An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion, International Journal of Advanced Manufacturing Technology, 38,778-786.
- Papadimitriou, C. and Kanellakis, P. C. (1980), Flowshop scheduling with limited temporary storage, Journal of the Association for Computing Machinery, 27, 533-549. https://doi.org/10.1145/322203.322213
- Rajendran, C. (1994), A no-wait flowshop scheduling heuristic to minimize makespan, Journal of the Operational Research Society, 45, 472-478. https://doi.org/10.1057/jors.1994.65
- Reddi, S. S. and Ramamoorthy, C. V. (1972), On the flowshop sequencing problems with no wait in process, Operational Research Quarterly, 23, 323-331. https://doi.org/10.1057/jors.1972.52
- Rock, H. (1984), Some new results in flow shop scheduling, Zeitschriflfiir Operations Research, 28, 1-16.
- Samarghandy, H. and Elmekkawty, T. Y. (2012), A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion, International of Advanced Manufacturing Technology, 61, 1101-114. https://doi.org/10.1007/s00170-011-3766-8
- Samarghandy, H. and Elmekkawty, T. Y. (2014), Solving the no-wait flow-shop problem with sequencedependent set-up times, International Journal of Computer Integrated Manufacturing, 27(3), 213-228. https://doi.org/10.1080/0951192X.2013.812802
- Samarghandy, H. (2015), Studying the effect of server side-constraints on the makespan of the no-wait flow shop problem with sequence-dependent set-up times, International Journal of Production Research, 53 (9), 2652-2673. https://doi.org/10.1080/00207543.2014.974846
- Vallada, E., Ruiz, R., and Framinanan, J. V. (2015), New Hard Benchmark for Flowshop Scheduling Problems Minimising makespan, European Journal of Operational Research, 240(3), 666-677. https://doi.org/10.1016/j.ejor.2014.07.033
- Van Der Veen, J. A. A. and Van Dal, R. (1991), Solvable cases of the no-wait flowshop scheduling problem, Journal of the Operational Research Society, 42, 971-980. https://doi.org/10.1057/jors.1991.187
- Wismer, D. A. (1972), Solution of the flowshop sequencing problem with no intermediate queues, Operations Research, 20, 689-697. https://doi.org/10.1287/opre.20.3.689
- Ying, K.-C., Lee, Z.-J., Lu, C.-C., and Lin, S.-W. (2012), Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups, The International Journal of Advanced Manufacturing Technology, 58(5-8), 671-682. https://doi.org/10.1007/s00170-011-3419-y
Cited by
- -machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study pp.1029-0273, 2018, https://doi.org/10.1080/0305215X.2018.1485903
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time vol.53, pp.8, 2021, https://doi.org/10.1080/0305215x.2020.1797000