References
- Lee, S.G., Seo, H.W. and Lee, W.J., 2007, Software Technologies for Shipbuilding Innovation, Journal of KIISE, JOK, 25(2), pp.26-34.
- Hu Xia and Zhou Min, 2009, A Review of the Development and Application of Advanced Planning System, Proceedings of the 3rd International Conference on Risk Management & Global e-business, pp.794-796.
- Goo, C.G., 2006, A study for Supply Chain Management Model on Small and Medium-sized Shipbuilding Yard, Ph.D. Thesis, Chosun University.
- Park, H.T., 2010, A study of the Performance Measurement of Supply Chain and its Application in Shipbuilding Industry, Master's degree thesis, The University of Seoul.
- Jeung, S.B., 2013, Developing a Supply Chain Assessment Framework for Shipbuilding Industry : A Case study of A Company, The Journal of digital policy &management, 11(3), pp.243-253.
- Jeoung, S.W., Kim, D.Y. and Park, S.W., 2009, Project Type Industry Analysis in SCM Perspective, Journal of Information and operations management, 19(1-2), pp.59-83.
- Seo, W.C., Jang, S.J., Kim, J.K., Lee, K.J., Lee, J.D. and Kim, J.G., 1995, The Development of Production Planning System for Shipbuilding, IE Interfaces, 8(2), pp.105-125.
- Lee, J.M., 2007, An Integrated Process and Measurement Framework for Planning Production of Large Shipyards, Ph.D. Thesis, Seoul National University.
- Meyr, H. and Stadtler, H., 2005, Types of Supply Chains. In Supply Chain Management and Advanced Planning, Springer Berlin Heidelberg, pp.65-80.
- Mello, M.H. and Strandhagen, J.O., 2011, Supply Chain Management in the Shipbuilding Industry: Challenges and Perspectives. Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment, 225(3), pp.261-270. https://doi.org/10.1177/1475090211406836
- Vlachakis, N., Mihiotis, A., Pappis, C.P. and Lagoudis, I.N., 2016, A Methodology for Analyzing Shipyard Supply Chains and Supplier Selection, Benchmarking: An International Journal, 23(2), pp.443-455. https://doi.org/10.1108/BIJ-08-2013-0082
- Hvolby, H.-H. and Steger-Jensen, K., 2010, Technical and Industrial Issues of Advanced Planning and Scheduling (APS) Systems, Computers in Industry, 61, pp.845-851. https://doi.org/10.1016/j.compind.2010.07.009
- Stadtler, H. and Kilger, C., 2008, Supply Chain Management and Advanced Planning, Springer Berlin Heidelberg, pp.81-106.
- Lee, D.H., 2009, A Study on the Integrated Outdoor Planning System of Shipbuilding by Consistency of the Production Planning Information, Ph.D. Thesis, Hongik University
- Cheon, B.S., 2004, NET Enterprise System Object-Oriented CBD Development Methodology, Young-Jin.com, Seoul, Korea.
- Song, J.G., Back, M.G. and Shin, J.G., 2012, Design and Development of Execution Plan Management System for Shipyard Panel Line Using CBD Method, Proceedings of 2012 Spring Conference of the Journal of the Society of Naval Architects of Korea, pp.462-467.
Cited by
- Research Trends of Scheduling Techniques for Domestic Major Industries vol.41, pp.1, 2018, https://doi.org/10.11627/jkise.2018.41.1.059