Acknowledgement
Supported by : 국토교통과학기술진흥원
References
- Chun J. (2005). The Process Model for Project Management of Design-Build System and Construction of Database, Korea Journal of Construction Engineering and Management, 6(1), KICEM, 109-116
- Han, K. (2005). A Study on Enhanced Work Process of Construction Management in Design-Build Projects, Master Thesis, Chung-ang University
- Jeon, H. (2002). Application of The regulations Maintenance of Construction Management and Study on the Public Project, Journal of The Board of Audit and Inspection of Korea, 7, Audit and Inspection Research Institute, 113-116
- Jeong, J., & Kim, Y. (2001). Analytical Study on the Barriers to the Turnkey Project Management in the Pre-construction Phase - From the View Point of the Large Construction Companies, Journal of the Architectural Institute of Korea Structure & Construction, 17(9), AIK, 207-214
- Jung, Y., Kang, S., Chin, S., Kim, Y., Chung, M., & Park, S. (2004). Standardized Progress Measurement Package, 2004 5th Annual Conference of KICEM, KICEM
- Kang, S. (2014). An Improved Progress Management of Design Development Phase of Turn-key Projects For Construction Manager, Master Thesis, Chung-ang University
- Kim, J., Koo, K., & Hyun, C. (2003). A Study on the Selective Design-Build Delivery Method Using An Analysis of the General System Theory, Journal of the Architectural Institute of Korea Structure & Construction, 19(10), AIK, 151-160
- Kim, T., Seo, Y., & Hyun, C. (2001). A Study on the Development of Process Model for Public Sector Design-Build Contracts, Journal of the Architectural Institute of Korea Structure & Construction, 17(7), AIK, 85-92
- Lee, B. (2012). Design-Build(Turnkey) and regulations, Korea Journal of Construction Engineering and Management, 15(1), KICEM, 352-357
- Lee, H. (2011). Development of the Architectural Business Process Model in the Turnkey Projects, Doctorate Thesis, Tong-Myoung University
- Lee, H., Jin, Z., Kim, J., & Hyun, C. (2015). Case Analysis For Determining the Characteristics of Value Engineering In The Pre-Design Phase, Joint HKIVM-SAVE International Conference, 66-72, SAVE International
- Lee, J. (2012). A Study on the Priority Analysis of Purchase Factors of Apartment Using AHP and ANP Approaches, Master Thesis, Sejong University
- Ministry Of Construction & Transportation (2003). Business Manual of Turnkey & Alternative Tender : Bidding.Contract Process and Deliberate, 2-5
- Public Procurement Service (2007). Construction Procurement Handbook, 97-111
- Rizzo, J. (1998). Design/build Alternative: A Contraction Method, Journal of Management in Engineering, Volume 14, Issue 6, 44-47 https://doi.org/10.1061/(ASCE)0742-597X(1998)14:6(44)
- Saaty, T. (2008). Relative Measurement and Its Generalization in Decision Making Why Pairwise Comparisons are Central in Mathematics
- Song, Y., Son, B., Chin, J., & Choi, Y. (2009). Business Process Model for Progress Phase of Design-Build Project, Korea Journal of Construction Engineering and Management, 10(4), KICEM, 38-49
- Washington State Department of Transportation (2004). Guidebook for design-build highway project development, Washington State Department of Transportation
- Yang, S. (2010). The Study of Analysis for Cost-Increasing Factor on Construction of High-rise Building Using AHP method, Master Thesis, Hanyang University