References
- Chen, P., and Weng, H. (2008). "A two-phase GA model for resource-constrained project scheduling." Automation im construction, 18(4), pp. 485-498.
- Choi, M., Park, M., Lee, H., and Lee, K. (2011). "Resource Optimization for Preventing Timeoverrun in a High-rise Building Project Using Layer Construction Method." Proceeding of Autumn Annual Conference of the Architectural Institute of Korea Structure & Construction, 31(2), pp. 383-384.
- Choi, M. K. (2003). "A Study on the methods to reduce construction time by analysing cost components of the concrete works in the apartments." MS thesis, Honam Univ., Gwang ju, Korea.
- Feng, C., Liu, L., and Burns C. (1997). "Using Genetic Algorithms To Solve Construction Time-Cost Trade-Off Problems.", Journal of Construction Engineering and Management, ASCE, 11(3), pp. 184-189.
- Faregh, N., Ketabi, S., and Ghandehari, M.. (2014). "Project scheduling by FGP to Time-Cost-Quality trade off: construction case study", Korean Journal of Construction Engineering and Management, KICEM, 4(3), pp. 53-59.
- Hanna, C., Awad, S., and Kenneth, T. (2005). "Impact of Extended Overtime on Construction Labor Productivity" Journal of Civil Engineering and Management, ASCE, 131(6), pp. 734-739.
- Hegazy, T. (1999). "Optimization of construction timecost trade-off analysis using genetic algorithms.", Canadian Journal of Civil Engineering, 26, pp. 685-697. https://doi.org/10.1139/l99-031
- Hinze, J. (2004). Construction planning and scheduling 2nd ed, Prentice Hall, Pearson, pp. 169-191
- Kang, B., Park, S., Han, S., and Kim, H. (2007). "Probabilistic Time-Cost Optimization for Controlling Construction Projects." Proceeding of Annual Conference of the Korean Society of Civil Engineers, pp. 3179-3183.
- Kang, N. U. (2014). "Development of optimal construction planning method considering the sequence between alternatives of activities.", MS thesis, Hongik Univ., Sejong, Korea.
- Kim, K. H. (1996). "Gentic Algorithm.", Journal of Computational Structural Engineering Institute of Korea, 32(2), pp. 28-35.
- Kim, M., Park, Y., Lee, H., Lee, J., and Lee, K. (2015). "Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm", Korean Journal of Construction Engineering and Management, KICEM, 16(5), pp. 54-64.
- Lee, H., Chung, K., and Choi, K. (2010). "Test Input Sequence Generation Strategy for Timing Diagram using Linear Programming", Journal of Korea Information Processing Society, 17-D(5), pp. 337-346.
- Lee, H. B. (2008). "Excel Management science", Muyokpublisher, Seoul, Korea.
- Lee, J. H. (2000). "A Study on Optimal photolithography processes in the fabrication scheduling using Linear Programming." MS thesis, Yonsei Univ., Seoul, Korea.
- Leu, S., and Yang, C. (1999). "GA-based fuzzy optimal model for construction scheduling." Journal of Construction Engineering and Management, 125(5), pp. 420-427. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(420)
- Maeng, J. C. (2011). "Development of progress management decision making model considering time-cost trade off.", MS thesis, Korea Univ., Seoul, Korea.
- Park, S, H. (2013). "A Study on Optimal Design of Multi-Objective Rainwater Detention System Linear Programming." MS thesis, University of Seoul, Seoul, Korea.
- Park, U., Cho, S., and Kang, K. (2003). "A Study on Rebar Detailing Optimization Using Genetic Algorithm." Journal of Architectural Institute of Korea, 19(10), pp. 125-132.
- Roh, S., Lee, H., Park, M., and Ryu, H. (2006). "Scheduling Method by Using Genetic Algorithms to Solve Time-Cost Trade-Off Problems (Focused on High-rise Building Finishing Work).", Journal of Architectural Institute of Korea, 22(6), pp. 157-164.
- Shin, Y., Kim, J., Seo, D., and Kang, Kyung. (2004). "A Study on the Model for Time-Cost Trade-off by Using Genetic Algorithms." Journal of Architectural Institute of Korea, 20(8), pp. 91-98.
- Son, J., Hong T., and Lee, S. (2013). "A mixed (continuous+discrete) time-cost trade-off model considering four different relationships with lag time." Journal of Civil Engineering, KSCE, 17(2), pp. 281-291.
- Suh, S., Park, T., Lee, C., and Kim, M. (1992). "A Study on the Estimation of Optimum duration in view of Cost in Building Construction", Journal of Architectural Institute of Korea, 8(1), pp. 209-214.