참고문헌
- Baccarini, D., The Maturing Concept of Estimating Project Cost Contingency-A review, Curtin University Library, 2006.
- Barraza, G.A. and Bueno, R.A., Cost Contingency Management, Journal of Management in Engineering, 2007, Vol. 23, No. 3, pp. 140-146. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:3(140)
- Book, S.A., Allocating Risk Dollars Back to Individual Cost elements, 2007.
- Carr, R.I., Cost-estimating principles, Journal of Construction Engineering Management, 1989, Vol. 115, No. 4, pp. 545-551. https://doi.org/10.1061/(ASCE)0733-9364(1989)115:4(545)
- Carr, V. and Tah, J.H.M., A fuzzy approach to construction project risk assessment and analysis, Advances in Engineering Software, 2001, Vol. 32, No. 10-11, pp. 847-857. https://doi.org/10.1016/S0965-9978(01)00036-9
- Chapman, C., Project Risk Management the required transformations to become project uncertainty management, PMI Research Conference, 2-4th June, Paris, PMI, 2000.
- Chenyun and Zichun, Y., The BP Artificial Neural Network Model on Expressway Construction Phase Risk, Systems Engineering Procedia, 2012, Vol. 4, pp. 409-415. https://doi.org/10.1016/j.sepro.2012.01.004
- Clark, D.E., Monte Carlo Analysis : Ten years of Experience, Cost Engineering, 2001, Vol. 43, No. 6, pp. 40-45.
- Dikmen, I., Birgonul, M.T., and Han, S., Using fuzzy risk assessment to rate cost overrun risk in international construction projects, International Journal of Project Management, 2007, Vol. 25, No. 5, pp. 494-505. https://doi.org/10.1016/j.ijproman.2006.12.002
- Eldosouky, A.A., Ibrahim, A.H., and Mohammed, H.E. Management of Construction Cost Contingency covering upside and downside risks, Alexandria Engineering Journal, 2014, Vol. 53, No. 4, pp. 863-881. https://doi.org/10.1016/j.aej.2014.09.008
- Flyvbjerg, B.H., Skamris, M., and Buhl, S., Understanding Costs in Public Works projects : Error or Lie?, Journal of the American Planning Association, 2002, Vol. 68, No. 3, pp. 279-295. https://doi.org/10.1080/01944360208976273
- Garvey, P.R., A Scenario-Based Method for Cost Risk Analysis, Journal of Cost Analysis and Parametrics, 2008, Vol. 1, No. 1, pp. 65-76. https://doi.org/10.1080/1941658X.2008.10462211
- Hillson, D., Developing effective risk responses, PMI annual Seminar and Symposium, 10-16th October, Philadelphia, PMI, 1999.
- Idrus, A., Nuruddin, M.F., and Rohman, M.A., Development of project cost contingency estimation model using risk analysis and fuzzy expert system, Expert Systems with Applications, 2011, Vol. 38, No. 3, pp. 1501-1508. https://doi.org/10.1016/j.eswa.2010.07.061
- Kim, G.H., Kang, K.I., and An, S.H., Comparison of Construction Cost Estimating Models based on Regression Analysis, Neural Networks, and Case-based reasoning, Building and Environment, 2004, Vol. 34, No. 2, pp. 34-47.
- Kim, J., Kang, C., and Hwang, I., Considering Claim Costs in Project Time-Cost Mixed Integer programming Model, Journal of the Society of Korea Industrial and Syatems Engineering, 2011, Vol. 34, No. 3, pp. 97-105.
- Lee, M.K., Jung, H.S., and Lee, D.W., A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management, International Journal of Quality Innovation, 2005, Vol. 33, No. 3, pp. 135-148.
- Moshelhi, O., Risk Assessment and Contingency Estimating, AACE Transactions Dallas, 1997, D&RM/A.06, pp. 90-95.
- NASA, 2008-NASA-Cost-Handbook-FINAL_v6[1].pdf, 2008.
- Oberlender, G.D. and Trost, S.M., Predicting accuracy of early cost estimates based on estimate quality, Journal of Construction Engineering Management, 2001, Vol. 127, No. 3, pp. 173-182. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(173)
- PMI(Project Management Institute), PMBOK Guide 5th, 2013.
- Sato, T. and Hirao, M., Optimum budget allocation method for projects with critical risks, International Journal of Project Management, 2013, Vol. 31, No. 1, pp. 126-135. https://doi.org/10.1016/j.ijproman.2012.04.002
- Smith Peter, Project Cost Management-Global Issues and Challenges, Social and Behavior Sciences, 2002, Vol. 119, pp. 485-494.
- Thomson, P.A. and Perry, J.G., Engineering Construction Risks, London : Thomas Telford, 1992.
- Uzzafer, M., A contingency estimation model for software projects, International Journal of Project Management, 2013, Vol. 31, No. 7, pp. 981-993. https://doi.org/10.1016/j.ijproman.2012.12.002
- Xenidis, Y. and Stavrakas, E., Risk Based Budgeting of Infrastructure Projects, Social and Behavior Sciences, 2013, Vol. 74, pp. 478-487.
- Zhu, B., Zhang, H., and Wang, X., Analysis and Evaluation of Project Cost Risk Based on BP Algorithm, Systems Engineering Procedia, 2011, Vol. 1, pp. 264-270. https://doi.org/10.1016/j.sepro.2011.08.041