DOI QR코드

DOI QR Code

Strengthened and flexible pile-to-pilecap connections for integral abutment bridges

  • Lee, Jaeha (Department of Civil Engineering, Korea Maritime and Ocean University) ;
  • Kim, WooSeok (Department of Civil Engineering, Korea Maritime and Ocean University) ;
  • Kim, Kyeongjin (Department of Civil Engineering, Korea Maritime and Ocean University) ;
  • Park, Soobong (Department of Civil Engineering, Chungnam National University) ;
  • Jeong, Yoseok (Department of Civil Engineering, Chungnam National University)
  • Received : 2014.09.02
  • Accepted : 2015.05.13
  • Published : 2016.03.20

Abstract

Pile-to-pilecap connection performance is important as Integral abutment bridges (IABs) have no expansion joints and their flexible weak-axis oriented supporting piles take the role of the expansion joint. This connection may govern the bridge strength and the performance against various lateral loads. The intention of this study is to identify crack propagation patterns when the pile-to-pilecap connection is subjected to lateral loadings and to propose novel connections for improved performance under lateral loadings. In this study, eight different types of connections were developed and modeled, using Abaqus 6.12 to evaluate performances. Three types were developed by strengthening the connections using rebar or steel tube: (i) PennDOT specification; (ii) Spiral rebar; and (iii) HSS tube. Other types were developed by softening the connections using shape modifications: (i) cylindrical hole; (ii) reduced flange; (iii) removed flange; (iv) extended hole; and (v) slot hole connection types. The connections using the PennDOT specification, HSS tube, and cylindrical hole were shown to be ineffective in the prevention of cracks, resulting in lower structural capacities under the lateral load compared to other types. The other developed connections successfully delayed or arrested the concrete crack initiations and propagations. Among the successful connection types, the spiral rebar connection allowed a relatively larger reaction force, which can damage the superstructure of the IABs. Other softened connections performed better in terms of minimized reaction forces and crack prevention.

Keywords

Acknowledgement

Supported by : National Research Foundation of Korea (NRF)

References

  1. Abendroth, R.E., Greimann, L.F. and Ebner, P.B. (1989), "Abutment pile design for jointless bridges", J. Struct. Eng., 115(11), 2914-2929. https://doi.org/10.1061/(ASCE)0733-9445(1989)115:11(2914)
  2. Abendroth, R.E., Greimann, L.F. and LaViolette, M.D. (2007), "An integral abutment bridge with precast concrete piles", Final Report; IHRB Project TR-438.
  3. Ahn, J., Yoon, J., Kim, J. and Kim, S. (2011), "Evaluation on the behavior of abutment-pile connection in tegral abutment bridge", J. Construct. Steel Res., 67(7), 1134-1148. https://doi.org/10.1016/j.jcsr.2011.02.007
  4. American Association of State Highway and Transportation Officials (AASHTO LRFD) (2013), AASHTO LRFD bridge design specifications, Washington, D.C., USA.
  5. Arsoy, S., Duncan, J.M. and Barker, R.M. (2002), "Performance of piles supporting integral bridges", J. Transport. Res. Board, 1808, 162-167. https://doi.org/10.3141/1808-19
  6. Baptiste, K., Kim, W. and Laman, J.A. (2011), "Parametric Study and Length Limitations for prestressed Concrete Girder Integral Abutment Bridges", J. Int. Assoc. Bridge Struct. Eng. (IABSE): Struct. Eng. Int., 21(2), 151-156.
  7. CEB-FIP (2010), CEB-FIP model code 2010, Bull. Inf. Com. Euro-Int.
  8. Chacon, R., Mirambell, E. and Real, E. (2013), "Strength and ductility of concrete-filled tubular piers of integral bridges", Engineering Structures, 46, 234-246. https://doi.org/10.1016/j.engstruct.2012.07.026
  9. Chore, H.S., Ingle, R.K. and Sawant, V.A. (2014), "Non linear soil structure interaction of space frame-pile foundation-soil system", Struct. Eng. Mech., Int. J., 49(1), 95-110. https://doi.org/10.12989/sem.2014.49.1.095
  10. Civjan, S.A., Kalayci, E., Quinn, B.H., Brena, S.F. and Allen, C.A. (2013), "Observed integral abutment bridge substructure response", Eng. Struct., 56, 1177-1191. https://doi.org/10.1016/j.engstruct.2013.06.029
  11. Conte, E., Troncone, A. and Vena, M. (2013), "Nonlinear three-dimensional analysis of reinforced concrete piles subjected to horizontal loading", Comput. Geotech., 49, 123-133. https://doi.org/10.1016/j.compgeo.2012.10.013
  12. Gama, D. and Almeida, J.F. (2014), "Concrete integral abutment bridges with reinforced conrete piles", Struct. Concrete, 15(3), 292-304. DOI:10.1002/suco.201300081
  13. Girton, D.D., Hawkinson, T.R. and Greimann, L.F. (1991), "Validation of design recommendations for intergral-abutment piles", J. Struct. Eng., 117(7), 2117-2134. https://doi.org/10.1061/(ASCE)0733-9445(1991)117:7(2117)
  14. Greimann, L. and Wolde-Tinsea, A.M. (1988), "Design model for piles in jointless bridges", J. Struct. Eng., 114(6), 1354-1371. https://doi.org/10.1061/(ASCE)0733-9445(1988)114:6(1354)
  15. Frosch, R.J., Kreger, M.E. and Talbott, A.M. (2009), Earthquake Resistance of Integral Abutment Bridges, FHWA/IN/JTRP-2008/11, Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, IN, USA.
  16. Harries, K.A. and Petrou, M.F. (2001), "Behavior of precast, prestressed concrete pile to cast-in-place cap connections", PCI Journal, 46(4), 82-92.
  17. Kalayci, E., Civjan, S.A. and Brena, S.F. (2012), "Parametric study on the thermal response of curved integral abutment bridges", Eng. Struct., 43, 129-138. https://doi.org/10.1016/j.engstruct.2012.05.007
  18. Kim, W. and Laman, J.A. (2010a), "Integral abutment bridge response under thermal loading", Eng. Struct., 32(6), 1495-1508. https://doi.org/10.1016/j.engstruct.2010.01.004
  19. Kim, W. and Laman, J.A. (2010b), "Numerical analysis method for long-term behavior of integral abutment bridges", Eng. Struct., 32(8), 2247-2257. https://doi.org/10.1016/j.engstruct.2010.03.027
  20. Kim, W. and Laman, J.A. (2012), "Seven-year field monitoring of four integral abutment bridges", J. Perform. Construct. Facil., 26(1), 54-64. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000250
  21. Kim, W. and Laman, J.A. (2013), "Integral abutment bridge behavior under uncertain thermal and timedependent load", Struct. Eng. Mech., Int. J., 46(1), 53-73. https://doi.org/10.12989/sem.2013.46.1.053
  22. Kim, S., Yoon, J., Kim, J., Choi, W. and Ahn, J. (2012), "Structural details of steel girder-abutment joints in integral bridges: An experimental study", J. Construct. Steel Res., 70, 190-212. https://doi.org/10.1016/j.jcsr.2011.07.009
  23. Kim, W., Lee, J. and Jeoung, C. (2013), "Concrete crack control of pile-to-pilecap connection in integral abutment bridges under cyclic bridge movement", Proceedings of the 3rd International Conference on Advanced Engineering Materials and Technology, Zhangjiajie, China, May.
  24. Kim, W., Laman, J.A. and Park, J.Y. (2014), "Reliability-based design of prestressed concrete girders in integral abutment bridges for thermal effects", Struct. Eng. Mech., Int. J., 50(3), 305-322. https://doi.org/10.12989/sem.2014.50.3.305
  25. Kunin, J. and Alampalli, S. (2000), "Integral abutment bridges: Current practice in United States and Canada", J. Perform. Construct. Facil., 14(3), 104-111. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:3(104)
  26. Lee, J. and Fenves, L.G. (1998), "Plastic-damage concrete model for earthquake analysis of dams", Earthq. Eng. Struct. Dyn., 27(9), 937-956. https://doi.org/10.1002/(SICI)1096-9845(199809)27:9<937::AID-EQE764>3.0.CO;2-5
  27. Pam, H.J. and Park, R. (1990), "Simulated seismic load tests on prestressed concrete piles and pile-pile cap connections", PCI Journal, 35(6), 42-61.
  28. Pennsylvania Department of Transportation (PennDOT) (2007), Design Manual Part 4, Structures: Procedures-Design-Plans Presentation, PennDOT Design 252 Manual Part 4, Commonwealth of Pennsylvania, Department of Transportation, Harrisburg, PA, USA.
  29. Precast/Prestressed Concrete Institute (2011), PCI Bridge Design Manual, The PCI Bridge Design Manual Steering Committee, part of the Transportation Activities Council. ISBN: 978-0-9846705-4-3
  30. Silva, P.F. (1998), "Experimental and analytical models to predict the response of pile to pile cap connections using simulated seismic loads", Ph.D. Thesis; University of California at San Diego, La Jolla, CA, USA.
  31. Sinha, B.P., Gerstle, K.H. and Tulin, L.G. (1964), "Stress-strain relations for concrete under cyclic loading", J. Am. Concrete Inst., 61(2), 195-212.
  32. Xiao, Y. and Chen, L. (2013), "Behavior of model steel H-pile-to-pile-cap connections", J. Construct. Steel Res., 80, 153-162. https://doi.org/10.1016/j.jcsr.2012.09.008
  33. Xiao, Y., Wu, H. and Yaprak, T.T. (2006), "Experimental studies on seismic behavior of steel pile-to-pilecap connections", J. Bridge Eng., 11(2), 151-159. https://doi.org/10.1061/(ASCE)1084-0702(2006)11:2(151)

Cited by

  1. Different approaches for numerical modeling of seismic soil-structure interaction: impacts on the seismic response of a simplified reinforced concrete integral bridge vol.17, pp.4, 2019, https://doi.org/10.12989/eas.2019.17.4.373
  2. Study on large tonnage pile foundation load test system and field test of long rock-socketed pile vol.21, pp.6, 2020, https://doi.org/10.12989/gae.2020.21.6.565
  3. An investigation on the bearing capacity of steel girder-concrete abutment joints vol.38, pp.3, 2021, https://doi.org/10.12989/scs.2021.38.3.319
  4. Influence of Construction Joint and Bridge Geometry on Integral Abutment Bridges vol.11, pp.11, 2016, https://doi.org/10.3390/app11115031