A Non-working Period Estimation Model Reflecting the Characteristics of the Construction Trades

건설공사 공종별 특성을 반영한 비작업기간 산정모델

  • Received : 2015.08.06
  • Accepted : 2016.02.12
  • Published : 2016.02.29

Abstract

The importance of construction project management has become more relevant along with the increase of the construction industry in size, height and complexity. The estimation of proper construction period as a project management task is an important factor in the evaluation and determination of successful completion of the construction project. Mainly, the estimation of proper construction period in the initial stage of counteraction is very important from the perspective of its use as the standard measure for the successful performance of the business contract and the construction. Construction period, which is estimated by rational and systematic methodology, can ensure persuasion of the relevant stakeholders including the owner and the contractors. However, if proper period to carry out the construction is not provided to the stakeholders, a variety of problems such as the quality degradation of the construction due to rushed work and the possibility of complaint due to the increase in the budget can occur. Construction period generally consists of net construction period and idle time due to other environmental factors. Net construction period can be objectively estimated by referring to the actual performance data survey of the similar construction project in the past and the estimation regulations of major ordering agencies or institutions. On the contrary, although idle time takes a great portion of the total construction period, its existing estimation method lacks objectivity and rationality. Consequently, it affects the total quality of the construction because of rushed work occurring due to the difference between plan and actual work progressed. Therefore, this study aims at developing a construction idle time estimation model by analyzing existing idle time estimation standards and methodologies that provide the user with more flexibility.

Keywords

References

  1. Baek, D., Han, M., & Han, C. (2007). Non working day estimation in the construction project in Cheongju and Cheongju region considering weather condition, Proceedings of Korea Institute of Construction Engineering and Management Annual Conference, 558-561.
  2. Choi, I., & Kim, O. (1998). A study on construction duration considering qualitative element, Proceedings of annual conference of the Architectural Institute of Korea, Construction Section, 18(2), 695-700.
  3. Jeong, K., Lee, J., & Park, Y. (2012). Study on introduction of 'pre-agreement system for additional incidental cost' related to construction time extension, Korean Journal of Construction Engineering and Management, 13(6), 33-44.
  4. Jeong, S., & Lee, H. (2003). A study on the method of decision making for the optimal starting time considering the elements of the climate, Journal of the Architectural Institute of Korea, Construction Section, 19(5), 113-120
  5. Kim, D., Kim, J., & Ahn, S. (2010). Estimate of non-working day and schedule of apartment construction by weather factors in Daegu, Proceedings of Annual Conference of the Regional Association of Architectural Institute of Korea, 422-425.
  6. Koo, H., & Choi, B. (1999). A study on the estimation of construction period considering weather factor in building construction, Journal of the Architectural Institute of Korea, Construction Section, 15(11), 87-96.
  7. Korea Land & Housing Corporation(2009). Construction Estimating Guideline.
  8. Korea Land & Housing Corporation(2012). LH Guide Specifications.
  9. Korea National Housing Corporation(1998). A Study on the Estimating Optimal Construction Duration.
  10. Lee, K., Kim K., & Shin, D. (2006). Improvement of non-working day estimation affected by weather conditions in the construction projects in Korea, Korean Journal of Construction Engineering and Management, 7(4), 100-108.
  11. Ministry of Land, Infrastructure, and Transport(2009). Concrete Standard Specification.
  12. Ministry of Land, Infrastructure, and Transport(2013). Building Construction Standard Specification.
  13. Ministry of National Defense(2013). The Estimation Standard of Optimal Construction Duration for Military Facilities.
  14. Park, C., & Yun, S. (2009). A Case Study on Reason Analysis for Schedule Delay of Apartment House, Journal of the Korea Institute of Building Construction, 9(1), 89-94. https://doi.org/10.5345/JKIC.2009.9.1.089
  15. Seoul, (2013). Design Service Management Handbook.
  16. Shin, J., Lee, J., & Lee, C. (2005). The estimation of non-working days for the construction project in Incheon region, Korean Journal of Construction Engineering and Management, 6(1), 58-64. (Received Aug. 6 2015 Revised Sep. 9 2015 Accepted Feb. 12 2016)