References
- Alva-hurtado, J. and E. Selig (1979). "Static and Dynamic Properties of Railroad Ballast."
- Alva-Hurtado, J. and E. Selig (1981). Permanent strain behavior of railroad ballast. Proceedings of The International Conference on Soil Mechanics and Foundation Engineering, 10th.
- Aursudkij, B. (2007). A laboratory study of railway ballast behaviour under traffic loading and tamping maintenance, University of Nottingham.
- Bach, H. and P. Veit (2013). Evaluation of attrition tests for railway ballast.
- Bathurst, R. J. and G. P. Raymond (1987). Geogrid reinforcement of ballasted track.
- Brattli, B. (1992). "The influence of geological factors on the mechanical properties of basic igneous rocks used as road surface aggregates." Engineering Geology 33(1): 31-44. https://doi.org/10.1016/0013-7952(92)90033-U
- Chanda, M. and R. Krishna (2003). "Selection and testing of ballast stones for underground railway tracks." African Journal of science and technology 4(2): 42-50.
- Chrismer, S. (1986). "Considerations of factors affecting ballast performance." American Railway Engineering Association 87.
- Dalton, C. (1973). "Field Durability Tests on Ballast Samples as a Guide to the Significance of the Specification Requirements." Canadian National Railways Technical Research Centre, St. Laurent, Quebec, Canada: 40.
- Debra, L. B. and T. S. Ernest (1990). "Abrasion tests for railroad ballast."
- DIPILATO, M., E. Steinberg and R. SIMON (1983). Ballast And Subgrade Requirements Study: Railroad Track Substructure--Design and Performance Practices, Federal Railroad Administration.
- Esveld, C. (2001). "Modern railway track."
- Hay, W. W. (1982). Railroad engineering, John Wiley & Sons.
- Indraratna, B. and D. Ionescu (1999). Deformation of ballast under static and dynamic loading. Pre-failure Deformation Characteristics of Geomaterials: Proceedings of the Second International Symposium on Pre-Failure Deformation Characteristics of Geomaterials: Torino 99: Torino, Italy 28-30 September, 1999, CRC Press.
- Indraratna, B., D. Ionescu, D. Christie and R. Chowdhury (1997). "Compression and degradation of railway ballast under one-dimensional loading." Faculty of Engineering-Papers: 403.
- Indraratna, B., H. Khabbaz and J. Lackenby (2003). Behaviour of railway ballast under dynamic loads based on large-scale triaxial testing. AusRAIL PLUS 2003, 17-19 November 2003, Sydney, NSW, Australia.
- Indraratna, B., H. Khabbaz and W. Salim (2004). "Ballast-formation-track interaction mechanism based on large scale laboratory testing." CORE 2004: New Horizons for Rail: 30.
- Indraratna, B., H. Khabbaz, W. Salim and D. Christie (2006). "Geotechnical properties of ballast and the role of geosynthetics."
- Indraratna, B., J. Lackenby and D. Christie (2005). "Effect of confining pressure on the degradation of ballast under cyclic loading."
- Indraratna, B., S. Nimbalkar and D. Christie (2009). "The performance of rail track incorporating the effects of ballast breakage, confining pressure and geosynthetic reinforcement."
- Ionescu, D. (2005). "Ballast degradation and measurement of ballast fouling." Railway technical review(2).
- Ionescu, D., B. Indraratna and H. D. Christie (1998). Deformation of railway ballast under dynamic loads. Conference on Railway Engineering Proceedings: Engineering Innovation for a Competitive Edge, Central Queensland University.
- Johansson, E., S. Lukschova and K. Miskovsky (2011). "Petrographic characteristics of granitoid and gabbroid intrusive rocks as a tool for evaluation of mechanical properties." E. Johansen (2011): Technological properties of rock aggregates. PhD Thesis, Lulea University of Technology, Lulea, Sweden.
- Johnson, D. (1985). Investigation of practical ballast specification requirements, Association of American Railroads.
- Kerr, A. D. (2003). Fundamentals of railway track engineering.
- Key, A. J. (1998). Behaviour of two layer railway track ballast under cyclic and monotonic loading, University of Sheffield.
- Knutson, M. (1977). Materials Foundation Study-Ballast and Foundation Materials Research Program, Tech. Rep FRA-OR&D-77-02, Federal Railroad Administration, Washington, DC, USA.
- Li, D. and E. T. Selig (1995). "Wheel/track dynamic interaction: track substructure perspective." Vehicle System Dynamics 24(sup1): 183-196. https://doi.org/10.1080/00423119508969624
- Meeker, L. E. (1990). Engineering and economic factors affecting the cost of railroad ballast.
- Nalsund, R. (2014). "Railway ballast characteristics, selection criterion and performance."
- Ozcelik, Y. (2011). "Predicting Los Angeles abrasion of rocks from some physical and mechanical properties." Scientific Research and Essays 6(7): 1612-1619.
- Parkin, A. and G. Adikari (1981). Rockfill deformation from large scale tests. Proceedings of the 10th International Conference Soil Mechanical and Foundations Engineering Stockholm.
- Raymond, G., P. Gaskin, J. Davies, K. Van Dalen and O. Svec (1975). Laboratory Performance of Railroad Ballast. Second Australia-New Zealand Conference on Geomechanics, Institution of Engineers, Australia.
- Raymond, G. P. (1978). "Design for railroad ballast and subgrade support." Journal of the Geotechnical Engineering Division 104(1): 45-60.
- Raymond, G. P. (1979). "Railroad ballast prescription: state-of-the-art." Journal of Geotechnical and Geoenvironmental Engineering 105(2).
- Raymond, G. P. and J. R. Davies (1978). "Triaxial tests on dolomite railroad ballast." Journal of Geotechnical and Geoenvironmental Engineering 104(ASCE 13835).
- Raymond, G. P., P. N. Gaskin and O. Svec (1975). Selection and performance of railroad ballast.
- Raymond, G. P. and D. R. Williams (1978). "Repeated load triaxial tests on a dolomite ballast." Journal of Geotechnical and Geoenvironmental Engineering 104(7).
- Robnett, Q., M. Thompson, W. Hay, S. Tayabji and R. Knutson (1975). Technical data bases report. Ballast and Foundation Materials Research Program.
- Selig, E., T. Yoo and C. Panuccio (1982). MECHANICS OF BALLAST COMPACTION. VOLUME I: TECHNICAL REVIEW OF BALLAST COMPACTION AND RELATED TOPICS.
- Selig, E. T. and J. M. Waters (1994). Track geotechnology and substructure management, Thomas Telford.
- Sharpe, P. (2000). Trackbed investigation. Journal and report of proceedings-Permanent Way Institution, Permanent Way Institution.
- Siller, T. (1980). "Properties of railroad ballast and subballast for track performance prediction." Master's project report. Con-crete Tie Correlation Study, Department of Civil Engineering, University of Massachusetts, Amherst.
- Simon, R., L. Edgers and J. Errico (1983). Ballast and Subgrade Requirements Study: Railroad Track Substructure-Materials Evaluation and Stabilization Practices.
- Thompson, M. (1977). "FAST Ballast and Subgrade Materials Evaluation." Ballast and Foundation Materials Research Program, University of Illinois at Urbana-Champaign. for US Federal Railroad Administration, Report No. FRA/ORD-77/32.
- Watters, B., M. Klassen and A. Clifton (1987). Evaluation of ballast materials using petrographic criteria.