References
- Online Archive of Korea Statistical Yearbook [Internet]. Daejeon(Korea): Statistics Korea. 2005 [cited 2016 May 1]. Available from: http://www.kostat.go.kr/.
- Online Archive of Insurance Statistical Monthbook [Internet]. Seoul(Korea): Korea Insurance Development Institute; 2006-[cited 2016 May 1]. Available form: http://www.insis.or.kr/.
- Ministry of Employment and Labor. Analysis of state industrial accidents. Sejong(Korea): Munjung; 2015 Nov. Chapter 2, Total of state industrial accidents; p. 9-32.
- Kim CH, Kang LS, Park HT. Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System. Journal of korean society of civil engineers. 2010 Jul;30(4):423-32.
- Vaughan EJ, Vaughan TM. Essential of Insurance : A Risk Management Perspective. NewYork: John Wiley & Sons, inc.; 1995, p. 43-78.
- Smith NJ, Merna T, Jobling P. Managing risk in construction projects. 2nd ed. Oxford: Blackwell publishing; 2006. 233 p.
- Lee HS, Kim HS, Park MS, Lee KP, Lee SB. Construction Risk Assessment Methodology Using Site Risk Influence Factors. Korean journal of construction engineering and management. 2009 Nov;10(6):117-26.
- Choi HH, Mahadevan S. Construction Project Risk Assessment Using Existing Database and Project-Specific Information. Journal of Construction Engineering and Management. 2008 Nov;134(11):8984-903.
- Yin YJ, Li Y. Probabilistic loss assessment of light-frame wood construction subjected to combined seismic and snow loads. Engineering Structures. 2011 Feb;33(2):380-90. https://doi.org/10.1016/j.engstruct.2010.10.018
- Munich Re. NATHAN world map of natural hazards. Munchen (Germany): Munchener Ruckversicherungs -Gesellschaft; 2011, p. 1-7.
- Kangari R, Riggs LS. Construction risk assessment by linguistics. Ieee transactions on enginnering management. 1989 May;36(2):126-31. https://doi.org/10.1109/17.18829
- Chan DWM, Chan APC, Lam PTI, Yeung JFY, Chan JHL. Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry. International Journal of Project Management. 2011 Aug;29(6):751-63. https://doi.org/10.1016/j.ijproman.2010.08.003
- Sameh ME. Risk assessment and allocation in the UAE construction industry. International Journal of Project Management 2008 May;26(4):431-8. https://doi.org/10.1016/j.ijproman.2007.07.004
- Bing L, Akintoye A. Edwards PJ, Hardcastle C. The allocation of risk in PPP/PFI construction projects in the UK. International journal of project management. 2005 Jan;23(1):25-35. https://doi.org/10.1016/j.ijproman.2004.04.006
- Hsueh SL, Perng YH, Yan MR, Lee JR. On-line multi-criterion risk assessment model for construction joint ventures in China. Auto in construction. 2007 Aug;16(5):607-19. https://doi.org/10.1016/j.autcon.2007.01.001
- Akintoye AS, MacLeod MJ. Risk analysis and management in construction. International Journal of Project Management. 1997;15(1):31-8. https://doi.org/10.1016/S0263-7863(96)00035-X
- Online Archive of Onnara information Service [Internet]. Jinju(Korea): Korea Land and Housing Corporation. 2015 [cited 2016 May 1]. Available from: http://www.onnara.go.kr/.