References
- Cleland, B. R. (2003). TMDL Development from the "Bottom up" - Part III: Duration Curve and Wet Weather Assessment, National TMDL Science and Policy 2003-WEF Specialty Conference, USA, Chicago.
- Gyeongsannam-do. (2015). The Third Stage Basic Plan of Gyeongsannam-do TMDL in Nakdong River, Gyeongsannam-do, pp. 7-8. [Korean Literature]
- Hwang, H. S., Park, B. K., Kim, Y. S., Park, K. J., Cheon, S. U., and Lee, S. J. (2011). Research on the Applicability of the Load Duration Curve to Evaluate the Achievement of Target Water Quality in the Unit Watershed for a TMDL, Journal of Korean Society on Water Environment, 27(6), pp. 885-895. [Korean Literature]
- Hwang, H. S., Yoon, C. G., and Kim, J. T. (2010). Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea, Journal of Korean Society on Water Environment, 26(6), pp. 903-909. [Korean Literature]
- Kim, E. J., Park, B. K., Kim, Y. S., Rhew, D. H., and Jung, K. W. (2015). A Study on Development of Management Targets and Evaluation of Target Achievement for Non-point Source Pollution Management in Saemangeum Watershed, Journal of Korean Society of Environmental Engineers, 37(8), pp. 480-491. [Korean Literature] https://doi.org/10.4491/KSEE.2015.37.8.480
- Ministry of Environment (MOE). (2012). Water Environment Information System (WEIS), http://water.nier.go.kr/waterMeasurement/selectWater.do (accessed Jun. 2012).
- National Institute Environmental Research (NIER). (2015). Demonstration Project of TMDLs for Tributary Watershed Management, National Institute Environmental Research, 11-1480523-002716-01. [Korean Literature]
- Nevada. (2003). Load Duration Curve Methodology for Assessment and TMDL, Development Nevada Division of Environmental Protection.
- Park, J. D. and Oh, S. Y. (2012). Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads, Journal of Korean Society on Water Environment, 28(5), pp. 693-703. [Korean Literature]
- Park, J. H., Kim, K. S., Jung, J. W., Hwang, K. S., Moon, M. J., Ham, S. I., and Lim, B. J. (2013). Water Quality Characteristics Evaluation by Flow Conditions Using Load Duration Curve - in Youngbon A Watershed -, Journal of Environmental Impact Assessment, 22(4), pp. 319-327. [Korean Literature] https://doi.org/10.14249/eia.2013.22.4.319
- Shon, T. S., Park, J. B., and Shin, H. S. (2009). A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River, Journal of Korean Society on Water Environment, 25(5), pp. 792-802. [Korean Literature]
- United States Environmental Protection Agency Office of Wetlands, Oceans, & Watersheds (U. S. EPA.). (2006) An Approach for Using Load Duration Curves in the Development of TMDLs, U. S. EPA Office of Wetlands, Oceans, & Watersheds.