참고문헌
- Abdin, M.F. (1986) "Solution of scheduling problems of job-shop type FMS with alternative machine tools", Computers & Industrial Engineering, 11(1-4), 241-245. https://doi.org/10.1016/0360-8352(86)90086-0
- Chaudhry, I.A. (2012) "Job shop scheduling problem with alternative machines using genetic algorithms", Journal of Central South University, 19(5), 1322-1333. https://doi.org/10.1007/s11771-012-1145-8
- Doh, H.H., J.M. Yu, Y.J. Kwon, J.H. Shin, H.W. Kim, S.H. Nam, and D.H. Lee (2014) "Decision tree based scheduling for flexible job shops with multiple process plans", International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 8(3), 621-627.
- Iwata, K.M., O.K. Teranmoto and S, Osaki (1997) "Virtual manufacturing systems as advanced information infrastructure for integrating manufacturing resource and activities", Annals of the CIRP, 46(1), 335-338. https://doi.org/10.1016/S0007-8506(07)60837-3
- Kim, H.J., J.H. Kim, S.H. Na, M.J. Song, D.S. Kim, H.J. Choi, and D.H. Moon (2014) "A simulation study for analyzing the capabilities of a factory producing parts of aircraft engine", Proceedings of 2014 Autumn Conference of the Korea Society for Simulation, Ajou University, Korea, 77-80. (김혜정, 김재훈, 나상현, 송민준, 김동수, 최해진, 문덕희 (2014) "항공기 부품 제조업체의 생산능력 분석을 위한 시뮬레이션 연구", 한국시뮬레이션학회 2014 추계학술대회 논문집, 아주대학교, 대한민국, 77-80.)
- Lee, H.S., Y.S. Han, and C.G. Lee (2006) "Direct carrier system based 300 mm FAB line simulation", Journal of the Korea Society for Simulation, 15(2), 51-57. (이홍순, 한영신, 이칠기 (2006) "Direct 반송방식에 기반을 둔 300㎜ FAB Line 시뮬레이션", 한국시뮬레이션학회논문지, 제15권, 제2호, 51-57.)
- Lee, G.C., J.M. Hong, J.W. Kim and S.H. Choi (2016) "A simulation study on capacity planning in reentrant hybrid flow shops", Journal of the Korea Society for Simulation, Vol. 25(1), 45-52. (이근철, 홍정만, 김정욱, 최성훈 (2016) "재투입이 존재하는 혼합흐름공정의 용량계획에 관한 시뮬레이션 연구", 한국시뮬레이션학회논문지, 제25권, 제1호, 45-52.) https://doi.org/10.9709/JKSS.2016.25.1.045
- Moon, D.H., H.I. Cho and S.G. Baek (2006) "A case study of the design of welding station in an excavator factory using 3D simulation", Journal of the Korea Society for Simulation, 15(1), 51-58. (문덕희, 조현일, 백승근 (2006) "굴삭기공장의 로봇 용접 작업장 설계에 대한 3D 시뮬레이션 사례연구", 한국시뮬레이션학회논문지, 제15권, 제1호, 51-58.)
- Moon, J.H., Y.H. Lee and D.W. Cho (2012) "Object-oriented simulation modeling for service supply chain", Journal of the Korea Society for Simulation, 21(1), 55-68. (문종혁, 이영해, 조동원 (2012) "서비스 공급사슬을 위한 객체지향 시뮬레이션 모델링", 한국시뮬레이션 학회논문지, 제21권, 제1호, 55-68.) https://doi.org/10.9709/JKSS.2012.21.1.055
- Na, S.H. (2015) Simulation Modeling Method Considering Characteristics of Production Line for Aircraft Engine Parts, M.S. Thesis, Changwon National University, Korea. (나상현 (2015) 항공기 엔진부품 생산라인의 특성 을 고려한 시뮬레이션 모델링 방법론, 공학석사학위논문, 창원대학교, 대한민국.)
- Nasr, N. and E. A. Elsayed (1990) "Job shop scheduling with alternative machines", International Journal of Production Research, 28(9), 1595-1609. https://doi.org/10.1080/00207549008942818
- Ra, H.W. and S.H. Choi (2014), "A study on the automated generation of Arena simulation models using conceptual models", Journal of the Korea Society for Simulation, 23(4), 21-29. (라현우, 최성훈 (2014) "개념 모델을 이용한 Arena 시뮬레이션 모델 자동 생성에 관한 연구", 한국시뮬레이션학회논문지, 제23권, 제4호, 21-29.) https://doi.org/10.9709/JKSS.2014.23.4.021
- Rajabinasab, A. and S. Mansour (2011) "Dynamic flexible job shop scheduling with alternative process plans: An agent-based approach", The International Journal of Advanced Manufacturing Technology, 54(9), 1091-1107. https://doi.org/10.1007/s00170-010-2986-7
- Tompkins, J.A., J.A. White, Y.A. Bozer and J.M.A. Tanchoco (2010) Facilities Planning, 4th Ed., John Wiley & Sons, U.S.A..
- Yang, G.R., Y.H. Chung, D.W. Kim and S.C. Park, "Bottleneck Detection Framework Using Simulation in a Wafer FAB", Transactions of the Society of CAD/CAM Engineers, Vol. 19, No. 3, pp. 214-223, 2014. (양가람, 정영호, 김대환, 박상철 (2014) "개념 모델 을 이용한 Arena 시뮬레이션 모델 자동 생성에 관한 연구", 한국CAD/CAM학회논문집, 제19권, 제3호, 214-223.) https://doi.org/10.7315/CADCAM.2014.214