Acknowledgement
Supported by : 국토교통부, 한국연구재단
References
- Berlo, L., Dijkmans, T., Hendriks, H., Spekkink, D., & Pel, W. (2012). BIM QuickScan: benchmark of BIM performance in the Netherlands, Proceedings 29th International Conference on Applications of IT in the AEC Industry, Beirut, 1-10.
- bimSCORE (2012). "bimSCORE". www.bimscore.com.
- Caleb & Company. (2000). Performance drivers, Seoul, Hanun 36-129.
- Cho, Y. (2006). The development of Balanced Scorecards model based on the strategic plan the Rod Library, UNI. Journal of Korea Information Management Institute, 23(1), 159-179. https://doi.org/10.3743/KOSIM.2006.23.1.159
- Choi, D., Jung, H. & Park, J. (2004). (Easy to Know) BSC, KOMIT Publishing, 52-96.
- Fanta, B., & Darada, D. (2015). The roles and challenges of Balanced Scorecard(BSC) as strategic performance management tool. EXCEL International Journal of Multidisciplinary Management Studies, 5(2), 17-33.
- Grembergen, W., & Saull, R. (2001). Information technology governance through the Balanced Scorecards, IDEA Group Publishing, Hershey PA, 199-211.
- Grembergen, W. (2005). Measuring and Improving IT Governance Through the Balanced Scorecard, Information Systems Control Journal, Vol.2
- Im, J. (2006). Study on using BSC framework to develop CSF & KPI for IT performance measure on IT organization and examining the relation of cause and effect in indicators, Master dissertatio., Thesis, Yonsei Univ.
- Jung, T. (2004). A Study on the Types of Organization Structure in Architectural Design Firm-based on project delivery system, Journal of the Architectural Institute of Korea, Planning and Design Section, 20(10), 121-128.
- Kang, T., Won, J., & Lee, K. (2013). A study on the development direction of a BIM performance assessment tool, Korean Journal of Space Information, 21, 53-62.
- Kaplan, R., & Norton, D. (1996). Linking the balanced scorecard to strategy, California Management Review, 39, 53-79. https://doi.org/10.2307/41165876
- Kim, E., Aum, P., & Kim, I. (2014). A study on building the work environment to utilize BIM for domestic architectural firms, Journal of the Architectural Institute of Korea, Planning and Design, 30(3), 121-128. https://doi.org/10.5659/JAIK_PD.2014.30.3.121
- Kim, H. (2008). A case study on the establishing public IT organization's performance measurement model through the IT BSC. Thesis, Soongsil University, 49-59.
- Kim, J., Lee, Y., & Kim, S. (2004). Perceived IT performance and contextual factor of small firms in Korea: an explorative study, The Journal for Information Professionals, 23-41.
- Kim, W., Lee, B., & Kang, H. (2012). Survey and implications of utilizing BIM in construction company. Construction & Economy Research Institute of Korea, 1-8.
- Korean Institute of Registered Architects (2014). BIM capability and readiness actual condition survey.
- Lee, J., & Yi J. (2011). A study on BIM capability evaluation for design organizations, Journal of the Architectural Institute of Korea, Planning and Design Section, 27(6), 257-266.
- Lee, Y. (2014). IT performance of small and medium firms: a comparison between manufacturers and non- manufacturers. Thesis, Hankuk University of Foreign Studies, 8.
- McGraw Hill Construction (2012). Smartmarket report - The business value of BIM for construction in major global markets in Korea.
- Min, J., Lee, Y., & Jung, S. (2002). Performance Evaluation of Knowledge Workers in Knowledge-based Organization, Korean Journal of Management Science, 25, 137-154.
- MLTM (2014). Press release-Construction industry maintains the world's seventh largest competitiveness last year.
- NIBS (2012). National BIM Standard-United States Version 2, 5 Practice documents, Chapter 5.2.
- Public Procurement Service (2013). Guideline for BIMapplied facilities projects, 5.
- Radhkrishnan, A., Zu, X., & Grover, V. (2008). A process-oriented perspective on differential business value creation by information technology: a empirical investment. International Journal of Management(Omega), 36, 1105-1125.
- Rice, S., & Becerik-Gerber, B. (2010). The perceived value of building information modeling in the U.S. building industry, Journal of Information Technology in Construction, 15, 185-201.
- Seo, H., Oh, J., & Kim, J. (2012). The Development of an Evaluation Model for the Work Environment of the BIM based Architectural Design Firms, Journal of the Architectural Institute of Korea, Planning and Design Section, 28(5), 95-105.
- Seo, J., & Choo, S. (2010) A study on cost-benefit analysis of BIM-based integrated design process in Korean architectural offices. Transactions of the Society of CAD/CAM Engineers, 15(4), 261-270.
- Shim, H., Yoon, S., Chin, S., Kim, K., Jung, Y., & Kim, Y. (2007). An Analysis on correlationship between information and business performance of architecture and engineering firm, Korean Journal of Construction Engineering and Management, 8(1), 159-168.
- Song, M., Yoon, S., & Chin, S. (2011). BSC based measurement of satisfaction degree for based BIM construction project, Korean Journal of Construction Engineering and Management, 12, 117-129.
- Song, S. (2008). The Effect of Data Quality Management on the Management Performance, Thesis, KyungHee Univ., 10-14.
- Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application, Automation in Construction, 35, 174-189. https://doi.org/10.1016/j.autcon.2013.05.016
- Sullivan, K., & Barlish, K. (2012). How to measure the benefit of BIM-A case study approach, Automation in construction, 24, 149-159. https://doi.org/10.1016/j.autcon.2012.02.008
- Won, T., & Jung, S.(2010). Statistical research SPSS PASW STATISTICS 18.0. Seoul, Hanara Academy, 343-357.36.
- Yu, I., Kim, K., Jung, Y., & Chin, S.(2006). Analysis of quantified characteristics of the performance indicators for construction companies, Korean Journal of Construction Engineering and Management, 7(4), 154-163.