References
- Park, H., Tae, Y,. and Woo, S. (2007). "A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation," Korean Journal of Construction Engineering and Management, KICEM, 8(3), pp. 97-105.
- Kang, S., Baek, K,. Baek, H,. and Seo, J. (2010). "A GIS-Based Planning Methodology to Determine the Haul Route Layout in Complex Construction Project," Journal of the Korean Society of Civil Engineers, 30(6D), pp. 631-639.
- Baek, K,. Kang, S,. and Seo, J. (2009). "Temporary Haul Road and Bridge Planning Based on Economic Efficiency and Productivity," Journal of the Korean Society of Civil Engineers, pp. 3590-3593.
- Lee, C,. Kim, S,. and Sung, Y. (2003). "A Study on 2D-Based Earthwork Planning Methods," Journal of the Korean Society of Civil Enginerrs, 23(3D), pp. 349-357.
- Choi, Y,. Sunwoo, C,. and Park, H. (2007). "Analysis of Optimal Haulage Routes for Dump Trucks in Large Open Pit Mines," Journal of the Korean Society for Geosystem Engineering, 44(6), pp. 477-491.
- Kang, T,. and Cho, Y. (2011). "The Study on the Optimized Earthwork Transfer Path Algorithm Considering the Precluded Area Massive Cutting and Banking," International Journal of Highway Engineering, 13(4), pp. 1-8.
- Son, J., Mattila, K., and Myers, D. (2005). "Determination of haul distance and direction in mass excavation." J. Constr. Eng. Manage, 131(3), pp. 302-309. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(302)
- Baek, K,. Kang, S,. Baek, H,. Park, H,. and Seo, J. (2009). "A Study on the Factors of Haul Routes Planning for Earthmoving," Proceedings of KICEM Annual Conference, KICEM, 9, pp. 899-902.
- Karimi, S., Mousavi, J., Kaveh, A., and Afshar, A. (2007). "Fuzzy optimization model for earthwork allocations with imprecise parameters." J. Constr. Eng. Manage., 133(2), pp. 181-190. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(181)
- Ji, Y., Borrmann, A., Rank, E., Seipp, F., and Ruzika, S. (2010). "Mathematical modeling of earthwork optimization problems." Proc. Int. Conf. on Computing in Civil and Building Engineering.
- Lee, J,. Pyeon, M,. Koo, J,. and Park, J. (2010). "Earthwork Plan Using the Precise 3D Topographic Data," Journal of the Korean Society for GeoSpatial Information System, 18(1), pp. 63-72.
- Atkinson, D.M., Deadman, P., Dudycha,D., and Traynor, S (2005). "Multi-criteria evaluation and least cost path analysis for an article all-weather road," Applied Geography, 24(4), pp. 287-307.
- Mayer, R. H., and Stark, R. M. (1981). "Earthmoving logistics." J. Constr. Div., 107(CO2), pp. 297-312.
- Easa, S. M. (1987). "Earthwork allocations with nonconstant unit costs." J. Constr. Eng. Manage, 113(1), pp. 34-50. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:1(34)
- Easa, S. M. (1988). "Earthwork allocations with linear unit costs." J. Constr. Eng. Manage, 114(4), pp. 641-655. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:4(641)
- Khaled Nassar, Ossama Hosny (2012). "Solving the Least-Cost Route Cut and Fill Sequencing Problem Using Particle Swarm" JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 138(8), pp. 931-942. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000512