Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage

활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안

  • Lee, JeongHoon (Department of Architecture & Architectural Engineering, Seoul National University) ;
  • Park, Moonseo (Department of Architecture & Architectural Engineering, Seoul National University) ;
  • Lee, Hyun-Soo (Department of Architecture & Architectural Engineering, Seoul National University) ;
  • Lee, Kwang-Pyo (Department of Architecture & Architectural Engineering, Seoul National University) ;
  • Hyun, Hosang (Department of Architecture, Seoul National University)
  • Received : 2015.06.02
  • Accepted : 2015.06.30
  • Published : 2015.07.31

Abstract

Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

최근 건설 기업들은 노동력 부족, 원자재값 상승, 건설경기 위축 등으로 인해 새로운 건설시장 개척 및 자동화 기술도입을 적극적으로 추진하고 있다. 이러한 노력의 일환으로 최근 제조업의 생산프로세스와 건설생산프로세스가 결합된 모듈러 건축공법이 부각되고 있으며 이와 관련된 연구가 활발히 진행되고 있다. 모듈러 건축프로세스에서 공장제작의 가장 큰 장점 중 하나는 기존 건축프로세스에서 사용하기 어려웠던 제조업의 생산설비시스템을 활용한 생산원가(공사원감)절감이 가능하다는 것 있다. 이를 뒷받침하기 위해서는 대다수의 건축공종이 집중되어있는 공장제작단계에서의 원가산정이 정확해야 하며 특히 직접적인 계산이 어려운 간접비에 대한 구체적인 산정방인 필요하다. 그러나 국내 모듈러 건축산업이 시장도입단계로 이와 관련된 연구가 한정적으로 이루어지고 있어 모듈러 건축물의 원가왜곡현상이 나타날 수 있는 문제가 있다. 따라서 본 연구는 모듈러 건축물의 공장제작단계에서 국내계약법상에서 명시된 제조업과 건설업에서의 간접비 정의를 고찰하고 활동기준원가계산법을 통해 모듈러 건축물을 구성하는 모듈러 유닛별 간접비 산정방식을 제시하였다. 본 연구는 공장제작단계에서의 전 과정 뿐만 아니라 모듈러 건축물의 설계, 제작, 운송, 시공의 간접비 배분에 대한 기초자료로서 활용될 수 있으며 향후 모듈러 건축물의 공장제작단계에서의 원가산정 정확도 향상 및 모듈러 건축물의 전 생애주기에 따른 원가산정방안 마련에 기여할 것으로 기대된다.

Keywords

References

  1. Ahn Taesik (1998). "Cost Drivers of Manufacturing Overhead:A Cross-sectional Analysis of Automobile Component Manufacturing Plants". Seoul Journal of Business, 4(2).
  2. Jeong, Ki-Chang, Lee,Jae-Seob, and Park, Yang-Ho (2012). "Study on introduction of 'Pre-Agreement system for additional Incidental Cost' related to construction time extension". Korean journal of Construction Engineering and Management, KICEM, 13(6), pp 33-44. https://doi.org/10.6106/KJCEM.2012.13.6.033
  3. Jung, Young-soo and Joo, Mi-hee (2011). "Patterns and Trends in Cost Control Practice of Korean General Constracts". Korean journal of Construction Engineering and Management, KICEM, 12, pp. 79-87.
  4. Kim, Yong-Woo, Ballard Glenn (2001). "Activity-Based Costing and Its application to lean construction", 9th annual conference of the international Group for Lean Construction.
  5. Kim, Yong-Woo, Han Seungheon, Shin Sungwon, and Choi-Kunhee (2011). "A case Study of activitybased costing in allocating rebar fabrication costs to projects". Construction Management and Econmoics, 29, pp. 449-461. https://doi.org/10.1080/01446193.2011.570354
  6. Kim Young-Woo and Ballard,Glenn (2002). "Case Stduy-Overhead Costs Analysis" Proceedings IGLC-10, Aug. 2002.
  7. Lim, Ji Youn, Yi,June-Seong, Shin,Seung-Woo, and Son,Jeong-Wook (2012). "Implementing Activitybased LCA Model for Carbon Dioxide Emission Analysis and Allocation of Envionment Cost". Korean journal of Construction Engineering and Management, KICEM, 13(4), pp. 78-88. https://doi.org/10.6106/KJCEM.2012.13.4.078
  8. Lee,Jung-Min, "Cost management of real estate developer and construction(2006)", Korean Studies Information, pp. 128-148.
  9. Ozbayrak.M, Akgun,M, and Turker.A.K (2004). "Activity-based cost estimation in a push/pull advanced manufacturing system" International Journal of Production Economics, 87, pp. 49-65. https://doi.org/10.1016/S0925-5273(03)00067-7
  10. Rhee,Ju Seong and Kim,Young Tai (1998). "A study on manufacturing overhead application under the change of manufacturing envrionment" Korean Association of Tax and Accounting, 5, pp. 241-267.
  11. Song,sang-Hoon, Lee, Hyun-Soo, and Park, Moon-Seo (2006). "Activity-oriented Quality Costs Measurement and Analysis for Construction Project." Journal of Architectural Institute of Korea, 23(3).
  12. Spedding T.A and Sun G.Q (1998). "Application of discrete event simulation to the activity based costing of manufacturing systems". International Journal of Production Economics, 58, pp. 289-301.

Cited by

  1. Steel Member Standardization for Enhancement of Modular Unit Manufacturing Productivity - Focusing on Steel Structure Frame Production in Ham-Yang and Yeo-su Military Facilities BTL Projects - vol.32, pp.1, 2016, https://doi.org/10.5659/JAIK_PD.2016.32.1.69