Analysis and monitoring on jacking construction of continuous box girder bridge

  • Li, Fangyuan (Department of Bridge Engineering, College of Civil Engineering, Tongji University) ;
  • Wu, Peifeng (Department of Bridge Engineering, College of Civil Engineering, Tongji University) ;
  • Yan, Xinfei (Shanghai Urban Construction Design & Research Institute)
  • Received : 2014.01.13
  • Accepted : 2015.07.07
  • Published : 2015.07.25

Abstract

It is hard to guarantee the strict synchronization of all the jacking-up points in the integral jacking of a large-span continuous box girder bridge. This paper took the Hengliaojing Bridge as background, which need jacking up as an object with 295m length and more than 10,000tons weight, adopted 3D software to calculate the unsynchronized jacking-up working conditions, and studied the relationships between the unsynchronized vertical difference and the girder's deformation behaviour. The aim is to verify the maximum value of the unsynchronized vertical difference, and guide the construction and ensure safety. The monitoring system with its contents is introduced corresponding to the analysis. The results of the deck relative elevations prove that it is difficult to avoid the deck torsional deformation for jacking different; especially the side span shows more deformations for its smaller stiffness. The maximum difference is smaller than the limited value with acceptable stresses in the sections. The jacking heights of the pier in each construction step are controlled regularly according to the design. The shifting of the whole bridge in longitudinal direction is smaller than in transverse direction. The several beginning steps are the key to adjust their support reactions. This study is one parts of the fundamental research for the code "Technical specification for bridge jacking-up and reposition of China". The whole synchronous jacking project of the main bridge set a world record by the World Record Association for the whole bridge jacking project with the longest span of the world.

Keywords

Acknowledgement

Supported by : Science and Technology Commission of Shanghai Municipality

References

  1. Bienen, B. and Cassidy, M.J. (2006), "Three-dimensional dynamic analysis of jack-up structures", Adv. Struct. Eng., 9(1), 19-37. https://doi.org/10.1260/136943306776232873
  2. CCCC Highway Consultants Co. Ltd. (2004), Desing Code JTG D62-2004, Code for design of highway reinforced concrete and prestressed concrete bridge and culverts, Beijing, China.
  3. Cheng, H.G., Yuan, F. and Zhou, C.J. (2010), "Applying the Whole Technique of Synchronous Jack-up to Solving the Deficency of the Clearance under the Passenger Foot-Bridge in a Railway Station", Key Technologies of Railway Engineering - High Speed Railway, Heavy Haul Railway and Urban Rail Transit, 214-219.
  4. Dang, X.H., Sliuzas, R., Song, Y., Du, Y.F., Li, H. and Luo, W.G. (2010), "Application research on jack-up technology of multistory masonry structure rectification", Proceedings of the 12th International Conference on Inspection Appraisal Repairs and Maintenance of Structures, Yantai, Arpil.
  5. Fan, X., Yang, X., Yang, J. and Bai, L. (2012), "Construction monitoring of jacking construction of steel-concrete composite beam in self-anchored suspension bridge", Proceedings of the International Conference on Civil Engineering And Urban Planning, Yantai, China.
  6. Gaddy, D.E. (2001), "Trend analysis, hydraulic systems expand jack up capabilities", Oil. Gas. J., 99(9), 76-85.
  7. Zhao, H.S. (2010), "Monitoring and analysis of the Nanpu Bridge approach lift-up project", Master dissertation, Shandong University, Jinan, China.
  8. Shanghai Urban Construction Design and Research Institute (2010), The Hengliaojing Bridge Jacking Construction Desing Drwaings.
  9. Li, S.M. (2012), "Development & design of large-tonnage and great-height hydraulic continuous and synchronous jack-up system", Appl. Mech. Mater., 157-158, 577-580. https://doi.org/10.4028/www.scientific.net/AMM.157-158.577
  10. Nai, D.G., Van Lam, N. and Duc, D.V. (2003), "Research and application of bridge beam raising technology by force resistance steel pipes to replace bearing in normal traffic conditions", Proceedings of the Eastern Asia Society for Transportation Studies, 4(10), 1779-1786.
  11. Park, S.K., Kim, H.Y. and Kim, J.H. (2001), "Bearing replacement for prestressed concrete I-girder bridges", J. Brid. Eng., 6(4), 271-275. https://doi.org/10.1061/(ASCE)1084-0702(2001)6:4(271)
  12. Seo, J., Yoo, W.S., Lee, U.K., Kim, C., Kang, K.I. and Cho, H. (2010), "Case study of a synchronous hydraulic jack-up system for constructing high-rise residential buildings", Can. J. Civil. Eng., 37(6), 922-926. https://doi.org/10.1139/L10-026
  13. Tan, X.M., Li, J. and Lu, C. (2003), "Structural behaviour prediction for jack-up units during jacking operations", Comput. Struct., 81(24-25), 2409-2416. https://doi.org/10.1016/S0045-7949(03)00299-2
  14. Yan, X.F., Wang, L.Y., Nian, F.L. and Li, F.Y. (2011), "Analysis on mechanical characters of long span continuous bridge pier in cut jacking construction", Proceedings of the International Conference on Remote Sensing, Environment and Transportation Engineering Proceedings, Nanjing, China.
  15. Yang, Y.H., Jin, S.C. and Zhang, Y.T. (2012), "Discussion on application of the multifunctional jack-up platform", Adv. Mater. Res., 479-481, 1059-1065. https://doi.org/10.4028/www.scientific.net/AMR.479-481.1059
  16. Zhao, J.Q., Zhang, Q. and Zhao, S.H. (2012), "Design & research of a continuous jack-up system for large structure object", Appl. Mech. Mater., 157-158, 250-253. https://doi.org/10.4028/www.scientific.net/AMM.157-158.250

Cited by

  1. Design and Safety Analysis of Block Protection System for Bridge Lifting Construction vol.05, pp.03, 2016, https://doi.org/10.12677/HJCE.2016.53011
  2. Influence Factors Analysis for a Long-Span PC Continuous Girder Bridge Broadened with Seamless Method vol.05, pp.02, 2016, https://doi.org/10.12677/HJCE.2016.52004
  3. Analysis and Test Study on the Dynamic Characteristics of a Continuous Concrete Girder Bridge Broadened without Joint vol.07, pp.01, 2018, https://doi.org/10.12677/HJCE.2018.71012
  4. Experimental Study on Axial Compression Behavior and Bearing Capacity Analysis of High Titanium Slag CFST Columns vol.9, pp.10, 2015, https://doi.org/10.3390/app9102021