1. Introduction
Nowadays, installed capacity of photovoltaic cells (PVs) and wind turbines (WTs) into island power systems has been increasing [1-3]. Because of island system generation’s high expense, installation of PVs and WTs has a chance to reduce generation costs. PV cost is reducing rapidly. As of 2013, the cost per MWh of rooftop solar was below retail electricity prices in several countries, including Australia, Brazil, Denmark, Germany, and Italy [4].
However, even short-term power fluctuations of PVs and WTs cause frequency fluctuations in the island grid compared to larger grids because of the small inertia constant and of the weak smoothing effect. Though some of the existing island engine generators have quick response characteristics, their output ranges are limited. Minimum output of existing generators is normally 40 or 50% of the rated power [3]. As it takes several or several tens of minutes for them to start up and connect synchronously to grids, they can’t suppress the short-term power fluctuations from large amount of PVs and WTs enough.
In order to suppress such short-term power fluctuations, energy storage systems (ESSs) such as batteries and flywheels are installed into remote island grids [2]. Many researches show that if there is enough capacity of ESSs, they can suppress the power fluctuations of PVs and WTs [5]. However, ESSs are still quite expensive and maintenance of ESSs in remote islands requires more effort.
To compensate the fluctuations with less ESS, power consumption control of the existing load is focused. Many researches propose electric vehicles [6], heat pump equipment [7] and desalination systems to be used as controllable loads. Some of them focus on islands [8-10].
In order to compensate power fluctuations, we have proposed power consumption control of pumps those supply water to tanks for drinking or farming. In such systems, water tanks are intrinsically large in order to prevent the water shortage. Hence control of pumps’ power consumption (pump power) doesn’t affect water users’ convenience as long as tanks hold water. Many researches focus on solar powered pumping systems experimentally [11] and analytically [12]. Over 7000 solar powered water pumping systems are already installed in India [13].
Many of the previous researches focus on stand-alone systems, but there are some researches take notice of grid-connected pumps. High potential of the grid-connected pump control is shown in [14-16]. The authors have focused on the grid-connected system, in which suppression of the power fluctuations of PVs or WTs can be shared with pumps and grids, even if PVs or WTs are remote from the pump system. First, theoretical model of the pump system is proposed [17] and experiments are conducted to obtain basic characteristics [18, 19]. The authors analyzed pressure waves of the system and proposed deadbeat control method [20] which enables faster response.
As primary function of the pump system is to supply water, this paper focuses on the water demand constraint. This paper proposes two methods -PI control method and water flow calculation method- to determine the reference of pump power to compensate short-term PV power fluctuations while satisfying water demand. Simulations with a PV and a pump system are carried out to find optimum parameters and to compare the two methods.
2. Simulation Model and Proposed Method
2.1 Target system
Simulation model is constructed based on an actual pump system. Fig. 1 shows the site location, Miyako Island, and appearance of the site. Fig. 2 shows the schematic diagram of the pump system. A power conditioning system (PCS) drives an induction motor (IM) and a centrifugal pump power can be controlled by changing the frequency of the PCS output voltage. The water level difference between the pump and the tank is 42 m. The volume of the tank is 100 m3 and the distance between the tank and the pump site is about 2km. A PV panel (6.8 kW) located near the pump system and is connected to the grid.
Fig. 1.Site location (left) and appearance (right)
Fig. 2.Schematic diagram of the system
The aim of the pump power control is to suppress short-term power fluctuations of the PV output whereas long-term fluctuations can be suppressed by power conditioning and unit commitment of diesel generators in grids. While suppressing short-term power fluctuations, water level of the tank should be kept within an allowable range. In this study, it is assumed that the pump supplies water only in the daytime and midnight, so the water level at 17:30 should be from 86% to 92% in order not to lack at midnight or overflow. This constraint is called water demand constraint.
2.2 Simulation model of pump system
Characteristics of the pump system are modelled by use of test results [18]. Fig. 3 shows frequency-power characteristics and frequency-water flow rate characteristics, where dots are measured values and the line is calculated by (1). In (1), P [kW] is the pump power and f [Hz] is the PCS output frequency. To prevent operation under low efficiency, P is controlled between 1.33 kW and 5.75 kW
Fig. 3.Pump power and water flow characteristics
Model of frequency-water flow characteristics is the linear interpolation of the measured values expressed by (2) and water flow-pump power characteristic is modelled by (3). Q [m3/hour] is water flow rate of the pump.
Fig. 4 shows water per kWh, which indicates efficiency. From 45 Hz to 59 Hz, the efficiency is higher than that of 60Hz. Hence the power control of the pump rarely increase total power consumption of the pump for water conveyance unless the frequency goes mainly under 45 Hz.
Fig. 4.Efficiency Characteristic
Fig. 5 shows the transient characteristic of the pump power [19] and it is modelled as 2.2 seconds first-order lag. Fig. 5 shows that the model step response is slower than the measured step response, so it is a conservative model.
Fig. 5.Pump power step response and its model
2.3 Power control without water demand constraint
Fig. 6 shows the block diagram of the simulation without the water demand constraint. Input values are PV output and water demand. The controller calculates the target pump power by use of PV output and its moving average (100 minutes). The constant is equal to 3.25kW, decided by a simulation to minimize the short-term RMS value (defined at section 3.1) without the water demand constraint. The target frequency is calculated by (1). In the pump system model part, pump power and water flow are calculated by (1) and (2), respectively. The water level M(t) is calculated by integrating water flow and demand, where t [sec] is time of the day.
Fig. 6.Block diagram without water demand constraint
2.4 PI control method
Fig. 7 shows the block diagram of the pump power control method with a PI controller for the water demand constraint. Input values of the simulations are PV output, water level target at 17:30 Mtarget [%] (89%) and water demand. The input of the PI controller is the difference between the real-time target water level Mtar(t) [%] and actual water level M(t). Mtar (t) is calculated by (4). In (4), Mstart [%] is the initial water level. tstart [sec] and ttarget [sec] is the start and target time of the day, respectively.
Fig. 7.Block diagram of PI control method
2.5 Water flow calculation method
Water flow calculation method computes the pump power target by calculating reference water flow rate value [m3/hour]. In this method, is calculated by (5) for each time step. The first term of the right side of (5) represents water flow rate for water level increase. Estimated water demand is set to 4.5 m3 / hour, which is the average of the water demand. Fig. 8 shows the concept of the net water flow calculation.
Fig. 8.Conceptual diagram with net water flow calculation
Fig. 9 shows the block diagram of pump power control with the water flow calculation method. Input values are the same as Fig. 7. In Fig. 9, [kW] is used instead of the constant used in the controller of other methods in order to send water almost . calculated by (6).
Fig. 9.Block diagram with water flow calculation method
3. Simulation Result and Discussion
3.1 Simulation procedure
Each simulation begins at 5:00 with water level of the tank at 68 % and ends at 17:30. Fig. 10 shows the input data of PV output and water demand. The measured PV generation data is used in the simulation as "PV output". PV generation fluctuates heavily in the cloudy day. The one-month average of the measured water demand is used as “Water Demand”. Simulation sampling time is 1 second.
Fig. 10.PV output and water demand
In the case of PI control method, simulations are conducted with various combination of gain KP [kW/100%] (0 to 25 at 2.5 intervals) and KI [kW/(100% sec)] (0 to 1.5x10−3 at 2.5x10−4 intervals). For example, if KP = 10 kW/100% and the difference between Mtar (t) and M(t) is 10 %, 1.0 kW will be compensated. In the cases of water flow calculation method, various control periods (1, 3, 10, 20, 30, 50, 75, 100, 150 and 200 minutes) are used in the simulation. In each method, the objective function is the average of root-mean-square (RMS) values of short-term fluctuations which is defined as current power minus its 20 minutes moving average. The best parameters are defined as those that minimize average of the objective function with three PV data with satisfaction of the water demand constraint in the three PV data.
3.2 Result without water demand constraint
Fig. 11 shows the time-series data without the water demand constraint by use of cloudy PV output. The orange line shows the pump power and the purple line shows the short-term tie-line power flow (RMS value: 0.30kW). Pump power sometimes reach its upper or lower limit as the range of PV output is wider than that of pump power.
Fig. 11.PV output, pump power and short-term tie-line power without water demand constraint (cloudy)
3.3 Result with PI control method
Fig. 12 shows simulation results with PI control with various parameters. In Fig. 12, the upper graph shows the RMS average of three cases with sunny, cloudy and rainy day PV data, respectively. The lower graph shows the water level at 17:30 of the rainy day. Rainy day water level is shown because it is most difficult to satisfy the constaint at 17:30 in the rainy day. In each graph, legends show the gain KI. It is shown that the minimum average RMS value, that satisfies the water demand constraint, is 0.23 kW at KP = 12.5 kW/100% and KI = 7.5x10−4 kW/(100% sec).
Fig. 12.RMS values and water level with PI method
Figs. 13-14 show time-series data with PI control method by use of cloudy and sunny and rainy PV output and the best parameters, respectively. Compared with Fig. 11, pump power in Fig. 13 is lower but still reaches its upper limit. This suggests that the control method uses the controllable range effectively. Fig. 14 shows that short-term fluctuations of the tie-line of the sunny and rainy day PV data are small compared to the cloudy data.
Fig. 13.PV output, pump power and short-term tie-line power with PI method (cloudy)
Fig. 14.PV output, pump power and short-term tie-line power with PI method (sunny and rainy)
3.4 Result with water flow calculation method
Fig. 15 shows simulation results by use of water flow calculation method with various control periods. In Fig. 15, the upper graph shows RMS values by sunny, cloudy, rainy day PV data and their average. The lower graph shows the water levels at 17:30. Horizontal axes are the control periods. The minimum average RMS value that satisfies the water demand constraint is 0.22 kW when the control period is 75 minutes. Compared with Fig. 12 in section 3.3, changes of average RMS values are small according to the parameter. Average RMS values in Fig. 15 are within 0.21 kW to 0.23 kW except when the time constant is 1 minutes.
Fig. 15.RMS values and water level with water flow calculation method
Figs. 16-17 show time-series data with the water flow calculation method when the time constant is 75 minutes. In Figs. 16-17, waveforms are similar to those of Figs. 13-14, respectively.
Fig. 16.PV output, pump power and short-term tie-line power with water calculation method (cloudy)
Fig. 17.PV output, pump power and short-term tie-line power with water calculation method (sunny and rainy)
3.5 Discussion
Fig. 18 shows comparison of the time-series water level in the case of cloudy day. Without controls for the constraint, water level exceeds the rated tank capacity (100%). However, by applying PI control method or water flow calculation method, the increase of the water level slows down and the water demand constraint is satisfied.
Fig. 18.Comparison of water level (cloudy)
Fig. 19 shows the comparison of the RMS values with the best parameters. In cloudy case, RMS values become a little worse by applying PI control method or water flow calculation method than that without the water demand constraint. However, in sunny and rainy cases, the RMS values are almost the same because the pump power rarely reaches the lower limit. Compared to the RMS values of PV output, both controls suppress power fluctuations. In this simulation, RMS values of PI control method and those of the water flow calculation method turned out to be almost same by use of best parameters for each case.
Fig. 19.Comparison of best RMS values
From Figs. 18-19, both the PI control method and the water flow calculation method can suppress the power fluctuations with satisfaction of the water demand. These methods are simple and easy to install to the PCS.
4. Conclusion
This paper shows that power consumption control of the existing pump system can suppress power fluctuations of the PV output to some extent with satisfaction of water for demand. Simulations are made with experimental data of a waterworks pump system driven by a power conditioning system. Both PI control method and water flow calculation method are proposed and are both shown to be useful for satisfying the water demand constraint. The water demand constraint has a little impact to suppression of the shortterm power fluctuation in this condition.
Future work includes the simulation by use of more various PV output and water demand data. Another future work is the application of water demand forecast to the water flow calculation method. Estimation of the effect of the power control to system lifetime (e.g., the metal fatigue of water pipes) is important for safety waterworks.
References
- Alvalo Glacia and Peter Meisen, “Renewable Energy Potential of Small Island States,” Global Energy Network Institute, 2008
- “Electric Storage and Renewables for island power system- A Guide for Decision Makers-,” IRENA, 2012
- Thomas Ackermann, “Wind Power in Power Systems, Second Edition,” 2012
- Renewable Energy Policy Network for the 21st Century, "Renewable 2014 Global Status Report", 2014
- Woo-Hyun Hwang, Sang-Kyu Kim, Jung-Ho Lee, Woo-Kyu Chae, Je-Ho Lee, Hyun-Jun Lee and Jae-Eon Kim, “Autonomous Micro-grid Design for Supplying Electricity in Carbon-Free Island”, JEET, Vol. 9, No. 3, pp. 1112-1118, May, 2014
- Taisuke Masuta, Akinobu Murata and Eiichi Endo, “Evaluation of Relationship between Demand Side Management and Future Generation Mix by Energy System Analysis,” JICEE, Vol. 4, No. 1, pp. 42-48, Jan. 2014
- Shunsuke Kawachi, Jumpei Baba, Kei Furukawa and Eisuke Shimoda, “Experimental Verification of Tie Line Power Flow Control of Microgrid by Use of Heat Pump Air Conditioning System and Energy Storage System,” JICEE, Vol. 3, No. 1, pp. 25-31, Jan. 2013
- Masaki Imanaka, Yusuke Onda, Toru Yoshihara, Jumpei Baba and Akihiko Yokoyama, “Feasibility Study on Compensation of Power Fluctuation Caused by Renewable Energy Source Using Desalination System in Island Power System,” JICEE, Vol.1, No.3, pp. 345-351, July 2011
- Motoki Tokudome, Tomonobu Senjyu, Atsushi Yona and Toshihisa Funabashi, “Frequency and Voltage Control of Isolated Island Power Systems by Decentralized Controllable Loads,” Transmission and Distribution Conference and Exposition: Asia and Pacific, 2009, Seoul, Korea, Oct. 2009
- Man-Guen Park, Seong-Bin Cho, Koo-Hyung Chung, Kyeong-Seob Moon and Jae-Hyung Roh, “Electricity Market Design for the Incorporation of Various Demand-Side Resources in the Jeju Smart Grid Test-bed”, JEET, Vol.9, No. 6, pp. 1851-1863, Nov. 2014
- Ramzy E. Katan, Vassilios G. Agelidis and Chem V. Nayar, “Performance analysis of a solar water pumping system,” Power Electronics, Drives and Energy Systems for Industrial Growth International Conference, New Dehli, India, pp. c, Jan. 1996
- Amevi Acakpovi, Fifatin François Xavier and Robert Awuah-Baffour, “Analytical Method of Sizing Photovoltaic Water Pumping System,” IEEE ICAST international conference, Kumasi, Ghana, pp. 65-69, Oct. 2012
- Dipesh Patel and Ziyad Salameh, “PV powered water well in Rajasthan- India,” IEEE ICIT International Conference, pp.688-692, Athens, Greece, March 2012
- Gary Marks, Edmund Wilcox, Daniel Olsen and Sasank Goli, “Opportunities for Demand Response in California Agricultural Irrigation: A Scoping Study”, Lawrence Berkeley National Laboratory, LBNL-6108E, Jan. 2013
- Sierra A. Orvis, Charles M. Burt and Luis Perez Urrestarazu, “Characteristics of Irrigation Pump Performance in Major Irrigated Areas of California”, Irrigation Traning and Research Center Report, No. P 11-010, 2011
- Charles Burt, “Irrigation System Components and Potential for Energy Conservation”, Irrigation Training and Research Center Report, No. R 11-003, 2011
- Hideki Sasamoto, Masaki Imanaka, Jumpei Baba, Naoto Higa, Masanori Shimabuku and Ryota Kamizato, “Fundamental study on Stabilization of an Isolated Island Power System by use of Irrigation system - Modeling of power consumption characteristics-,” IEEJ Annual Conference, Tokyo, Japan, Vol. 6, No. 195, March 2012 (in Japanese)
- Masaki Imanaka, Hideki Sasamoto, Jumpei Baba, Naoto Higa, Masanori Shimabuku and Ryota Kamizato, “Experimental Results of Characteristics at Quasi-Steady State of Water Conveyance System Power Consumption Control for Isolated Island Power System,” IEEJ Annual Conference, Tokyo, Japan, Vol. 6, No. 268, March 2013 (in Japanese)
- Hideki Sasamoto, Masaki Imanaka, Jumpei Baba, Naoto Higa, Masanori Shimabuku and Ryota Kamizato, “Fundamental study on Stabilization of an Isolated Island Power System by use of Irrigation system - Result of Transient characteristic test-,” IEEJ Annual Conference, Tokyo, Japan, Vol. 6, No. 267, March 2013 (in Japanese)
- Hideki Sasamoto, Masaki Imanaka, Jumpei Baba, Naoto Higa, Masanori Shimabuku and Ryota Kamizato, “Fundamental Study on Stabilization of Isolated Island power System by Use of Pump System,” IEEE PES Innovative Smart Grid Technologies Conference Europe, Copenhagen, Denmark, Oct. 2013