Abstract
10 years ago, in Sijeon-ri, Dogo-myeon, Asan-si, the existing stream was repaired to develope Mt. Dogo trail and irrigation systems through road expansion pavement construction and small stream repair construction. The trees such as persimmon and willow are eliminated that rowed on both sides of the stream and dredging work to dig the rock and sand have been performed. As a result, wide asphalt road was built, also flood damage worries were reduced. 10 years passed and now, how did local residents think about the stream repaired before and after? Village residents, public officials, and the stream construction engineer were interviewed. Villagers indicated a problems that brook became a place where water peppers were taking over and water was stagnating due to the slow velocity so nothing could live and natural landscape like a wash place and the cascade disappeared, because rock and sand were taken out brought soil into the brook. Public officials and engineers were aware of the problems at the time of the stream. Now that construction is completed after 10 years, Both realistically and budgetary to restoration would be difficult. However, it is necessary to seek for waterfront space which can be restored or replaced by a part of the stream like similarly before. In addition, it is necessary to restore to the progression of a natural stream which connect with stairs(or slope) - small waterfalls - pools - wash place. In this paper, we hope to take a lesson from the Sijeon-ri model and make rural stream construction be prepared with consideration about not only distinct characteristics of specific area but also the opinion of local resident.