DOI QR코드

DOI QR Code

Effect on measurements of anemometers due to a passing high-speed train

  • Zhang, Jie (Key Laboratory of Traffic Safety on Track of Ministry of Education, School of Traffic & Transportation Engineering, Central South University) ;
  • Gao, Guangjun (Key Laboratory of Traffic Safety on Track of Ministry of Education, School of Traffic & Transportation Engineering, Central South University) ;
  • Huang, Sha (Key Laboratory of Traffic Safety on Track of Ministry of Education, School of Traffic & Transportation Engineering, Central South University) ;
  • Liu, Tanghong (Key Laboratory of Traffic Safety on Track of Ministry of Education, School of Traffic & Transportation Engineering, Central South University)
  • 투고 : 2014.07.03
  • 심사 : 2015.02.10
  • 발행 : 2015.04.25

초록

The three-dimensional unsteady incompressible Reynolds-averaged Navier-Stokes equations and k-${\varepsilon}$ double equations turbulent model were used to investigate the effect on the measurements of anemometers due to a passing high-speed train. Sliding mesh technology in Fluent was utilized to treat the moving boundary problem. The high-speed train considered in this paper was with bogies and inter-carriage gaps. Combined with the results of the wind tunnel test in a published paper, the accuracy of the present numerical method was validated to be used for further study. In addition, the difference of slipstream between three-car and eight-car grouping models was analyzed, and a series of numerical simulations were carried out to study the influences of the anemometer heights, the train speeds, the crosswind speeds and the directions of the induced slipstream on the measurements of the anemometers. The results show that the influence factors of the train-induced slipstream are the passing head car and tail car. Using the three-car grouping model to analyze the train-induced flow is reasonable. The maxima of horizontal slipstream velocity tend to reduce as the height of the anemometer increases. With the train speed increasing, the relationship between $V_{train}$ and $V_{induced\;slipstream}$ can be expressed with linear increment. In the absence of natural wind conditions, from the head car arriving to the tail car leaving, the induced wind direction changes about $330^{\circ}$, while under the crosswind condition the wind direction fluctuates around $-90^{\circ}$. With the crosswind speed increasing, the peaks of $V_X,{\mid}V_{XY}-V_{wind}{\mid}$ of the head car and that of $V_X$ of the tail car tend to enlarge. Thus, when anemometers are installed along high-speed railways, it is important to study the effect on the measurements of anemometers due to the train-induced slipstream.

키워드

과제정보

연구 과제 주관 기관 : National Science Foundation of China

참고문헌

  1. Baker, C.J., Sterling, M., Figur-Hardy, G., Johnson, T., Free, P., Munley, G., Bowman, I., Pope, C. and Gawthorpe, R. (2006), "The effect of train slipstreams on passengers and trackside workers", Proceedings of the 7th world congress on railway research (WCCR), Montreal, Canada, June.
  2. Cali, P.M. and Covert, E.E. (2000), "Experimental measurements of loads on an overhead highway sign structure by vehicle-induced gusts", J. Wind Eng. Ind. Aerod., 84(1), 87-100. https://doi.org/10.1016/S0167-6105(99)00045-8
  3. Cheli, F., Ripamonti, F., Rocchi, D. and Tomasini, G. (2010), "Aerodynamic behaviour investigation of the new EMUV250 train to cross wind", J. Wind Eng. Ind. Aerod., 98(2), 189-201. https://doi.org/10.1016/j.jweia.2009.10.015
  4. Chu, C.R., Chien, S.Y., Wang, C.Y. and Wu, T.R. (2014), "Numerical simulation of two trains intersecting in a tunnel", Tunn. Undergr. Sp. Tech., 42, 161-174. https://doi.org/10.1016/j.tust.2014.02.013
  5. Diedrichs, B., Sima, M., Orellano, A. and Tengstrand, H. (2007), "Crosswind stability of a high-speed train on a high embankment", Proc. I. Mech. Eng., Part F: J. Rail. Rap. Tran., 221(2), 205-225. https://doi.org/10.1243/0954409JRRT126
  6. Fluent Inc. (2006), FLUENT User's Guide.
  7. Fujii, T., Maeda, T., Ishida, H., Imai, T. Tanemoto, K. and Suzuki, M. (1999), "Wind-Induced Accidents of Train/Vehicles and Their Measures in Japan", QR of RTRI, 40(1), 50-55. https://doi.org/10.2219/rtriqr.40.50
  8. Gong, J. and Wang, P. (2012), "Research on gale monitoring & early warning system of high-speed railway", High Speed Rail. Tech., 3(1), 5-8, 14. (in Chinese)
  9. Hemida, H., Gil, N. and Baker, C. (2010), "LES of the slipstream of a rotating train", J. Fluids Eng., 132(5), 31-39.
  10. Hemida, H. and Krajnovic, S. (2010), "LES study of the influence of the nose shape and yaw angles on flow structures around trains", J. Wind Eng. Ind. Aerod., 98(1), 34-46. https://doi.org/10.1016/j.jweia.2009.08.012
  11. Hemida, H., Baker, C. and Gao G.J. (2014), "The calculation of train slipstreams using large-eddy simulation", Proc. I. Mech. Eng., Part F: J. Rail. Rap. Tran., 228(1), 25-36. https://doi.org/10.1177/0954409712460982
  12. Huang, S., Hemida, H. and Yang, M.Z. (2014), "Numerical calculation of the slipstream generated by a CRH2 high-speed train", Proc. I. Mech. Eng., Part F: J. Rail. Rap. Tran., 228, published online 8 April 2014.
  13. Hur, N., Kim, S.R., Won, C.S. and Choi, C.K. (2008), "Wind load simulation for high-speed train stations", J. Wind Eng. Ind. Aerod., 96(11), 2042-2053. https://doi.org/10.1016/j.jweia.2008.02.046
  14. Johnson, T. and Holding, J. (2003), "Better understanding of high speed train slipstream velocities", Proceedings of the 6th world congress on railway research (WCCR), Edinburgh, UK, September.
  15. Juraeva, M., Lee J.H. and Song, D.J. (2011), "A computational analysis of the train-wind to identify the best position for the air-curtain installation", J. Wind Eng. Ind. Aerod., 99(5), 554-559. https://doi.org/10.1016/j.jweia.2011.02.004
  16. Li, Y.F. and Liang, X.F.(2009), "Aerodynamic function and stability influence of high-speed moving EMUs on insulated boards", J. Cent. South Univ. (Sci. Tech.), 40(6), 1587-1592. (in Chinese)
  17. Liu, T.H. and Zhang, J. (2013), "Effect of landform on aerodynamic performance of high-speed trains in cutting under cross wind", J. Cent. South Univ., 20(3), 830-836. https://doi.org/10.1007/s11771-013-1554-3
  18. Matsumoto, M. and Maeda, T. (1996), "Train/vehicles wind-induced hazard and its mitigation", Proceedings of the Conference on Natural Disaster Reduction, ASCE, Washington, D.C., USA, December.
  19. Quinn, A.D., Baker, C.J. and Wright, N.G. (2001), "Wind and vehicle induced forces on flat plates-Part 1: wind induced force", J. Wind Eng. Ind. Aerod., 89(9), 817-829. https://doi.org/10.1016/S0167-6105(01)00070-8
  20. Quinn, A.D., Baker, C.J. and Wright, N.G. (2001), "Wind and vehicle induced forces on flat plates-Part 2: vehicle induced force", J. Wind Eng. Ind. Aerod., 89(9), 831-847. https://doi.org/10.1016/S0167-6105(01)00071-X
  21. Rezvani, M.A. and Mohebbi M. (2014), "Numerical calculations of aerodynamic performance for ATM train at crosswind conditions", Wind and Struct., 18(5), 529-548. https://doi.org/10.12989/was.2014.18.5.529
  22. Sanz-Andres, A. and Santiago-Prowald, J. (2002), "Train-induced pressure on pedestrians", J. Wind Eng. Ind. Aerod., 90(8), 1007-1015. https://doi.org/10.1016/S0167-6105(02)00216-7
  23. Sanz-Andres, A., Laveron, A., Cuerva, A. and Baker, C. (2004), "Vehicle-induced force on pedestrians", J. Wind Eng. Ind. Aerod., 92(2), 185-198. https://doi.org/10.1016/j.jweia.2003.11.002
  24. Sanz-Andres, A., Laveron, A., Baker, C. and Quinn, A. (2004), "Vehicle induced loads on pedestrian barriers", J. Wind Eng. Ind. Aerod., 92(5), 413-426. https://doi.org/10.1016/j.jweia.2003.12.004
  25. Sanz-Andres, A., Santiago-Prowald, J., Baker, C. and Quinn, A. (2003), "Vehicle-induced loads on traffic sign panels", J. Wind Eng. Ind. Aerod., 91(7), 925-942. https://doi.org/10.1016/S0167-6105(03)00035-7
  26. Shin, C.H. and Park, W.G. (2003), "Numerical study of flow characteristics of the high speed train entering into a tunnel", Mech. Res. Commun., 30, 287-296. https://doi.org/10.1016/S0093-6413(03)00025-9
  27. Sterling, M., Baker, C.J., Jordan, S.C. and Johnson, T. (2008), "A study of the slipstreams of high-speed passenger trains and freight trains", Proc. I. Mech. Eng., Part F: J. Rail. Rap. Tran., 222, 177-193. https://doi.org/10.1243/09544097JRRT133
  28. Tian, H.Q. (2007), Train Aerodynamics, China Railway Press, Beijing, China.
  29. Wang, B., Xu, Y.L., Zhu, L.D. and Li, Y.L. (2014), "Crosswind effects on high-sided road vehicles with and without movement", Wind and Struct., 18(2), 155-180. https://doi.org/10.12989/was.2014.18.2.155
  30. Zhang, J., Gao, G.J. and Li, L.J. (2013), "Height optimization of windbreak wall with holes on high-speed railway bridge", J. Traffic Transport. Eng., 13(6), 28-35. (in Chinese)

피인용 문헌

  1. Numerical analysis of the slipstream development around a high-speed train in a double-track tunnel vol.12, pp.3, 2017, https://doi.org/10.1371/journal.pone.0175044
  2. Crosswind stability of high-speed trains in special cuts vol.22, pp.7, 2015, https://doi.org/10.1007/s11771-015-2817-y