과제정보
연구 과제 주관 기관 : 산업통상자원부
참고문헌
- ISO 3082 Iron Ores - Sampling and Sample Preparation Procedures, p 20, p 37, p 43, 2000
- Kevin Thorne et al., The Benefits of Automating Sampling and Analysis of Iron Ore, Iron Ore Conference, 2007
- Hyeong-Tae Park, Jong-Geun Kwak, Gi-Nam Wang, Sang C. Park, Plant model generation for PLC simulation, International Journal of Production Research, 48(5), 1517-1529, 2009 https://doi.org/10.1080/00207540802577961
- Min-Suk Ko, Sang-Chul Park, Gi-Nam Wang, PLC validation issue in the Automation Manufacturing Line, Journal of the Korean Institute of Industrial Engineers, 19, 383-387, 2007
- INCOSE Handbook Working Group ,Systems Engineering Handbook v.3.2.2, 2011
- ISO/IEC 15288:2008, Systems and software engineering - System life cycle processes, 2008
- Dennis M. Buede, The Engineering Design of Systems: Models and Methods, John Wiley & Sons, Inc, 2009
- Suk-Hwan Suh, Introduction to Plant Systems Engineering, POSTECH GEM, 2014
- Mission Need Statement Guide, U.S DOE, DOE G 413.3-17, 2008
- Bill et al., Error Cost Escalation Through the Project Life Cycle, INCOSE symposium, 2004
- Charles S. Wasson, System Analysis, Design, and Development: Concepts, principles, ad practices, A John Wiley & Sons, Inc, 2006
- Wan wook Ki, Jun Pil Kim, Dae Geun Hong, Suk-Hwan Suh, A Study on Application of Systems Engineering Technical Process to FEED in Plant construction Industry - focused on a case of Environmental Plant, Journal of the Korea Society of Systems Engineering, 9(2), 37-53, 2013 https://doi.org/10.14248/JKOSSE.2013.9.2.037