참고문헌
- Beck, J.L. and Au, S.K. (2002), "Bayesian updating of structural models and reliability using Markov chain Monte Carlo simulation", J. Eng. Mech. -ASCE, 128(4), 380-391. https://doi.org/10.1061/(ASCE)0733-9399(2002)128:4(380)
- Bishop, C.M. (2006), Pattern Recognition And Machine Learning, New York: springer, NY, USA.
- Ding, C. and He, X. (2004), "K-means clustering via principal component analysis", Proceedings of the 21th International Conference on Machine Learning, ACM.
- Friswell, M. and Mottershead, J.E. (1995), Finite Element Model Updating In Structural Dynamics, Kluwer Academic Publishers, Dordrecht, The Netherlands.
- Govers, Y. and Link, M. (2010), "Stochastic model updating-Covariance matrix adjustment from uncertain experimental modal data", Mech. Syst. Signal Pr., 24(3), 696-706. https://doi.org/10.1016/j.ymssp.2009.10.006
- Goulet, J.A., Kripakaran, P. and Smith, I.F. (2010), "Multimodel structural performance monitoring", J. Struct. Eng. - ASCE, 136(10), 1309-1318. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000232
- Jung, S., Ok, S.Y. and Song, J. (2010), "Robust structural damage identification based on multi-objective optimization", Int. J. Numer. Meth.Eng,, 81(6), 786-804.
- Katafygiotis, L.S., Papadimitriou, C. and Lam, H.F. (1998), "A probabilistic approach to structural model updating", Soil Dyn. Earthq. Eng., 17(7), 495-507. https://doi.org/10.1016/S0267-7261(98)00008-6
- KCI (2010), Guide Specification for Assessment of Concrete bridges, Korea Concrete Institute, Seoul, Korea.
- Kim, H.J., Kim, H.K. and Park, J.Y. (2013), "Reliability-based evaluation of load carrying capacity for a composite box girder bridge", J. Civil Eng. - KSCE, 17(3), 575-583.
- Kim, H.J., Park, W., Koh, H.M. and Choo, J.F. (2013), "Identification of structural performance of a steel-box girder bridge using machine learning technique", Proceedings of the IABSE Symposium Report, 99(12), 1313-1320, International Association for Bridge and Structural Engineering.
- Kim, H.J., Park, W. and Koh, H.M. (2014), "Probabilistic performance assessment of highway bridges using operational monitoring data", Proceedings of IABSE Symposium Report, 102(9), 2650-2657, International Association for Bridge and Structural Engineering.
- Mares, C., Mottershead, J.E. and Friswell, M.I. (2006), "Stochastic model updating: part 1-theory and simulated example", Mech. Syst. Signal Pr., 20(7), 1674-1695. https://doi.org/10.1016/j.ymssp.2005.06.006
- MLTM (2012), Highway Bridge Design Code, Korea Ministry of Land, Transportation and Maritime Affairs, Seoul, Korea.
- Mottershead, J.E., Mares, C., James, S. and Friswell, M.I. (2006), "Stochastic model updating: part 2-application to a set of physical structures", Mech. Syst. Signal Pr., 20(8), 2171-2185. https://doi.org/10.1016/j.ymssp.2005.06.007
- Mottershead, J.E., Link, M. and Friswell, M.I. (2011), "The sensitivity method in finite element model updating: a tutorial", Mech. Syst. Signal Pr., 25(7), 2275-2296. https://doi.org/10.1016/j.ymssp.2010.10.012
- Mukhopadhyay, S., Lus, H. and Betti, R. (2014), "Modal parameter based structural identification using input-output data: Minimal instrumentation and global identifiability issues", Mech. Syst. Signal Pr., 45(2), 283-301. https://doi.org/10.1016/j.ymssp.2013.11.005
- Mukhopadhyay, S., Lus, H., Hong, A.L. and Betti, R. (2012), "Propagation of mode shape errors instructural identification", J. Sound Vib., 331(17), 3961-3975. https://doi.org/10.1016/j.jsv.2012.04.012
- Park, I., Amarchinta, H.K. and Grandhi, R.V. (2010), "A Bayesian approach for quantification of modeluncertainty", Reliab. Eng. Syst. Safe., 95(7), 777-785. https://doi.org/10.1016/j.ress.2010.02.015
- Park, W., Kim, H. K. and Jongchil, P. (2012), "Finite element model updating for a cable-stayed bridgeusing manual tuning and sensitivity-based optimization", Struct. Eng. Int., 22(1), 14-19. https://doi.org/10.2749/101686612X13216060212870
- Robert-Nicoud, Y., Raphael, B. and Smith, I.F.C. (2000), "Decision support through multiple models andprobabilistic search", Proceedings of the Construction Information Technology, Icelandic BuildingResearch Institute, Reykjavik.
- Saitta, S., Raphael, B. and Smith, I.F. (2007), "A bounded index for cluster validity", Proceedings of the 5thInternational Conference MLDM 2007, Leipzig, Germany, July.
- Schueller, G.I. and Jensen, H.A. (2008), "Computational methods in optimization consideringuncertainties-an overview", Comput. Method. Appl. M., 198(1), 2-13. https://doi.org/10.1016/j.cma.2008.05.004
- Soize, C., Capiez-Lernout, E., Durand, J.F., Fernandez, C. and Gagliardini, L. (2008), "Probabilistic modelidentification of uncertainties in computational models for dynamical systems and experimentalvalidation", Comput. Method. Appl. M., 198(1), 150-163. https://doi.org/10.1016/j.cma.2008.04.007
- Steenackers, G. and Guillaume, P. (2006), "Finite element model updating taking into account theuncertainty on the modal parameters estimates", J. Sound Vib., 296(4), 919-934. https://doi.org/10.1016/j.jsv.2006.03.023