DOI QR코드

DOI QR Code

Shear resistance characteristic and ductility of Y-type perfobond rib shear connector

  • Kim, Sang-Hyo (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Park, Se-Jun (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Heo, Won-Ho (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Jung, Chi-Young (Department of Civil and Environmental Engineering, Yonsei University)
  • 투고 : 2014.03.20
  • 심사 : 2014.10.02
  • 발행 : 2015.02.25

초록

This study evaluates behavior of the Y-type perfobond rib shear connector proposed by Kim et al. (2013). In addition, an empirical shear resistance formula is developed based on push-out tests. Various types of the proposed Y-type perfobond rib shear connectors are examined to evaluate the effects of design variables such as concrete strength, number of transverse rebars, and thickness of rib. It is verified that higher concrete strength increases shear resistance but decreases ductility. Placing transverse rebars significantly increases both the shear resistance and ductility. As the thickness of the ribs increases, the shear resistance increases but the ductility decreases. The experimental results indicate that a Y-type perfobond rib shear connector has higher shear resistance and ductility than the conventional stud shear connector. The effects of the end bearing resistance, resistance by transverse rebars, concrete dowel resistance by holes, and concrete dowel resistance by Y-shape ribs on the shear resistance are estimated empirically based on the push-out test results and the additional push-out test results by Kim et al. (2013). An empirical shear resistance formula is suggested to estimate the shear resistance of a Y-type perfobond shear connector for design purposes. The newly developed shear resistance formula is in reasonable agreement with the experimental results because the average ratio of measured shear resistance to estimated shear resistance is 1.024.

키워드

과제정보

연구 과제 주관 기관 : Korea Institute of Energy Technology Evaluation and Planning (KETEP)

참고문헌

  1. Ahn, J.H., Lee, C.G., Won, J.H., and Kim, S.H. (2010), "Shear resistance of the perfobond-rib shear connector depending on concrete strength and rib arrangement", J. Construct. Steel Res., 66(10), 1295-1307. https://doi.org/10.1016/j.jcsr.2010.04.008
  2. Baran, E. and Topkaya, C. (2012), "An experimental study on channel type shear connectors", J Construct. Steel Res., 74, 108-117. https://doi.org/10.1016/j.jcsr.2012.02.015
  3. Candido-Martins, J.P.S., Costa-Neves, L.F. and Vellasco, P.C.G.S. (2010), "Experimental evaluation of the structural response of perfobond shear connectors", Eng. Struct., 32(8), 1976-1985. https://doi.org/10.1016/j.engstruct.2010.02.031
  4. Erdelyi, S. and Dunai, L. (2009), "Light-gauge composite floor beam with self-drilling screw shear connector: experimental study", Steel Compos. Struct., Int. J., 9(3), 255-274. https://doi.org/10.12989/scs.2009.9.3.255
  5. European Committee for Standardization (2007), "prEN 1994-1-1 Design of Composite Steel and Concrete Structures Part 1-1: General rules and rules for buildings", CEN, Brussels, Belgium.
  6. Kim, H.Y. and Jeong, Y.J. (2010), "Ultimate strength of a steel-concrete composite bridge deck slab with profiled sheeting", Eng. Struct., 32(2), 534-546. https://doi.org/10.1016/j.engstruct.2009.10.014
  7. Kim, S.H., Ahn, J.H., Choi, K.T. and Jung, C.Y. (2011), "Experimental evaluation of the shear resistance of corrugated perfobond rib shear connections", Adv. Struct. Eng., 14(2), 249-263. https://doi.org/10.1260/1369-4332.14.2.249
  8. Kim, S.H., Choi, K.T., Park, S.J., Park, S.M. and Jung, C.Y. (2013), "Experimental shear resistance evaluation of Y-type perfobond rib shear connector", J. Construct. Steel Res., 82, 1-18. https://doi.org/10.1016/j.jcsr.2012.12.001
  9. Korea Highway Bridge Specifications (2010), Korean Ministry of Construction and Transportation.
  10. Medberry, S.B. and Shahrooz, B.M. (2002), "Perfobond shear connector for composite construction", Eng. J., 2-12.
  11. Oguejiofor, E.C. and Hosain, M.U. (1997), "Numerical analysis of push-out specimens with perfobond rib connectors", Comput. Struct., 62(4), 617-624. https://doi.org/10.1016/S0045-7949(96)00270-2
  12. Papastergiou, D. and Lebet, J.P. (2014), "Design and experimental verification of an innovative steel-concrete composite beam", J. Construct. Steel Res., 93, 9-19. https://doi.org/10.1016/j.jcsr.2013.10.017
  13. Vianna, J.C., Costa-Neves, L.F., Vellasco, P.C.G. da S. and Andrade S.A.L. (2009), "Experimental assessment of Perfobond rib and T-Perfobond shear connectors' structural response", J. Construct. Steel Res., 65(2), 408-421. https://doi.org/10.1016/j.jcsr.2008.02.011
  14. Vianna, J.C., Andrade, S.A.L., Vellasco, P.C.G.S. and Costa-Neves, L.F. (2013), "Experimental study of perfobond shear connectors in composite construction", J. Construct. Steel Res., 81, 62-75. https://doi.org/10.1016/j.jcsr.2012.11.002

피인용 문헌

  1. Behavior of steel and concrete composite beams with a newly puzzle shape of crestbond rib shear connector: an experimental study vol.60, pp.6, 2016, https://doi.org/10.12989/sem.2016.60.6.1001
  2. Y-type perfobond rib shear connectors subjected to fatigue loading on highway bridges vol.122, 2016, https://doi.org/10.1016/j.jcsr.2016.04.015
  3. Comparison of hysteretic performance of stubby Y-type perfobond rib and stud shear connectors vol.147, 2017, https://doi.org/10.1016/j.engstruct.2017.05.056
  4. Analysis of the Shear Behavior of Stubby Y-Type Perfobond Rib Shear Connectors for a Composite Frame Structure vol.10, pp.12, 2017, https://doi.org/10.3390/ma10111340
  5. Shear behavior of multi-hole perfobond connectors in steel-concrete structure vol.56, pp.6, 2015, https://doi.org/10.12989/sem.2015.56.6.983
  6. Generalized formulation for shear resistance on Y-type perfobond rib shear connectors vol.128, 2017, https://doi.org/10.1016/j.jcsr.2016.08.016
  7. Limitations on the use of partial shear connection in composite beams with steel T-sections and uniformly spaced rib shear connectors vol.142, 2018, https://doi.org/10.1016/j.jcsr.2017.11.023
  8. Shear resistance behaviors of a newly puzzle shape of crestbond rib shear connector: An experimental study vol.21, pp.5, 2016, https://doi.org/10.12989/scs.2016.21.5.1157
  9. Numerical simulation of Y-type perfobond rib shear connectors using finite element analysis vol.31, pp.1, 2019, https://doi.org/10.12989/scs.2019.31.1.053
  10. Use of UHPC slab for continuous composite steel-concrete girders vol.34, pp.3, 2015, https://doi.org/10.12989/scs.2020.34.3.321
  11. Application of a newly puzzle shaped crestbond rib shear connector in composite beam using inverted T steel girder: An experimental study vol.79, pp.1, 2021, https://doi.org/10.12989/sem.2021.79.1.117
  12. Shear Resistance Assessment of the Y-Type Perfobond Rib Shear Connector under Repeated Loadings vol.11, pp.16, 2015, https://doi.org/10.3390/app11167667