References
- AbouRizk, Halpin (1992). "Statistical properties of construction duration data", Journal of Construction Engineering and Management, ASCE, 118(3), pp. 525-544. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(525)
- Ahuja, Nandakumar (1985). "Simulation model to forecast project completion time", Journal of Construction Engineering and Management, ASCE, 111(4), pp. 325-342. https://doi.org/10.1061/(ASCE)0733-9364(1985)111:4(325)
- Akinsola A.O, Potts K.F, Ndekugri I, and Harris FC (1997). "Identification and evaluation of factors influencing variations on building projects", International Journal of Project Management, 15(4), pp. 263-267. https://doi.org/10.1016/S0263-7863(96)00081-6
- Han, Tae-Gon and Kim, Young-su (2000). "An Estimation Method of Activity Duration Using Fuzzy Set Theory", Journal of the Regional Association of Architectural Institute of Korea, 16(3). pp. 93-102.
- Hwang, Hyo-Sang (2002). "Analysis of Actual Duration by Effecting Elements to Duration Estimate-Focused on Standard Duration of the Office Building Construction", Korean Journal of Construction Engineering and management, KICEM, 3(3), pp. 84-93.
- Jeong, Suk-Nam and Lee, Hak-ki (2000). "a preliminary study on the effective decision-making support model for duration by the hypothetical weather simulation", Journal of the Regional Association of Architectural Institute of Korea, 20(2), pp. 587-590.
- Korea Instituie of Civil Engineering and Building Technology (1992). "Study on the estimation standard of construction duration"
- Kim, Byeong-soo and Chun, Jin-Ku (2005). "A Study on Estimation Model of Construction Duration for Public Construction", Korean Journal of Construction Engineering and management, KICEM, 6(6), pp. 142-151.
- Kim, Sang-joong and Lee, Jae-Soeb (2004). "An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration", Korean Journal of Construction Engineering and management, KICEM, 5(6), pp. 72-79.
- Koo, Hae-Shik and Choi, Bong-CHUL (1999). "A Study on the Estimation of Construction Period Considering Weather Factor in Building Construction", Journal of the Regional Association of Architectural Institute of Korea, 15(11), pp. 87-96.
- Kwon, Dong-Chan and Lee, Chan-Shik (2004). "The Estimation of Construction Duration for High School Buildings Based on the Actual Data", Korean Journal of Construction Engineering and management, KICEM, 5(6), pp. 138-145.
- Lee, Chan-Shik (1996). "Estimation Method for Construction Duration in the Frame Work of Reinforced Concrete Wall-Slab Type Apartments", KSCE of Civil Engineering, 12(7), pp 349-364.
- Lee, D.E. (2005). "Probability of project completion using stochastic project scheduling simulation", Journal of Construction Engineering and Management, ASCE, 131(3), pp. 310-318. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(310)
- Lee, Hyun-soo (1996). "A Method of Estimating the Construction Duration based on Rdpetitive Work Modules for Reinforced Concrete Buildings", Journal of the Regional Association of Architectural Institute of Korea, 12(5), pp. 257-266.
- Lee, Sang-Beom (2001). "A Study on the Optimal Duration Estimating Method by Line of Balance", Journal of the Regional Association of Architectural Institute of Korea, 17(9), pp. 233-240.
- Schexnayder, C., Knutson, K. and Fente, J (2005). "Describing a beta probability distribution function for construction simulation", Journal of Construction Engineering and Management, ASCE, 131(2), pp. 221-229.
Cited by
- Estimating approximate construction duration of CFRD in the planning stage vol.20, pp.7, 2016, https://doi.org/10.1007/s12205-016-0810-0
- Factor Analysis for Development of Construction Period Calculation Model in Apartment House Remodeling vol.196, 2017, https://doi.org/10.1016/j.proeng.2017.08.055
- ESTIMATING NORMAL DURATION OF RENOVATION FOR MULTISTORY APARTMENT BUILDING CONSIDERING EXTENSION-TYPE RENOVATION PROJECTS vol.25, pp.2, 2019, https://doi.org/10.3846/jcem.2019.8024