References
- Cachon, G. P. (2003), Supply chain coordination with contracts, Handbooks in Operations Research and Management Science, 11, 229-340.
- Chen, Y. Y. (2010), An Analytical Framework for Multi-Site Supply Chain Planning Problems, World Academy of Science, Engineering and Technology, 41, 1135-1141.
- Ehrgott, M. (2005), Multicriteria optimization, Springer.
- Gelders, L. F. and Wassenhove, L. N. V. (1981), Production planning: a review, European Journal of Operational Research, 7(2), 101-110. https://doi.org/10.1016/0377-2217(81)90271-X
- Glover, F. (1990), Tabu search: A tutorial, Interfaces, 20(4), 74-94. https://doi.org/10.1287/inte.20.4.74
- Hwang, C. L. and Masud, A. S. M. (1979), Multiple objective decision making-methods and applications: a state-of-the-art survey, Springer, Berlin.
- Kibira, Deogratias, et al. (2015), Analysis of Standards Towards Simulation-Based Integrated Production Planning, Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth, Springer International Publishing, 39-48.
- Kim, T. et al. (2015), Decomposing Packaged Services Towards Configurable Smart Manufacturing Systems, Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth, Springer International Publishing, 74-81.
- Lin, J. T. and Chen, Y.Y. (2007), A multi-site supply network planning problem considering variable time buckets-A TFT-LCD industry case, The International Journal of Advanced Manufacturing Technology, 33(9), 1031-1044. https://doi.org/10.1007/s00170-006-0537-z
- Moon, C., Kim, J. and Hur, S. (2002), Integrated process planning and scheduling with minimal total tardiness in multi-plants supply chain, Computers and Industrial Engineering, 43, 331-349. https://doi.org/10.1016/S0360-8352(02)00078-5
- Roux, W., Dauzere-Peres, S., and Lasserre, J. B. (1999), Planning and scheduling in a multi-site environment, Production Planning and Control, 10, 19-28. https://doi.org/10.1080/095372899233389
- Timpe, C. H. and Kallrath, J. (2000), Optimal planning in large multi-site production networks, European Journal of Operational Research, 126, 422-435. https://doi.org/10.1016/S0377-2217(99)00301-X
- Vercellis, C. (1999), Multi-plant production planning in capacitated self-configuring two-stage serial systems, European Journal of Operational Research, 119, 451-460. https://doi.org/10.1016/S0377-2217(99)00146-0
- Wagner, S. M. and Bode, C. (2006), An empirical investigation into supply chain vulnerability, Journal of Purchasing and Supply Management, 12(6), 301-312. https://doi.org/10.1016/j.pursup.2007.01.004
Cited by
- Sequencing the Mixed Model Assembly Line with Multiple Stations to Minimize the Total Utility Work and Idle Time vol.15, pp.1, 2016, https://doi.org/10.7232/iems.2016.15.1.001