DOI QR코드

DOI QR Code

Rules of Three Untrained Workers' Assignment Optimization in Reset Limited-Cycled Model with Multiple Periods

  • Song, Peiya (Graduate School of System Design, Tokyo Metropolitan University) ;
  • Kong, Xianda (Faculty of System Design, Tokyo Metropolitan University) ;
  • Yamamoto, Hisashi (Faculty of System Design, Tokyo Metropolitan University) ;
  • Sun, Jing (Faculty of Engineering, Nagoya Institute of Technology) ;
  • Matsui, Masayuki (Faculty of Engineering, Kanagawa University)
  • Received : 2015.01.29
  • Accepted : 2015.12.18
  • Published : 2015.12.30

Abstract

In labor-intensive enterprise, such as garment factory, assembly line is widely used as a manufacturing process for reducing costs and production time. However, for the sake of the various working capacity of worker, idle or delay may happen and influence the rear processes. If these unforeseeable delay happened continuously, it may influence the whole manufacturing process and a model, which is called limited-cycle model with multiple periods (LCMwMP), is assumed to evaluate the influence risk. In order to minimize the risk, the assignment of the workers is focused on. In this paper, we deal with an assembly line as LCMwMP model when two kinds of workers exist, whose efficiency is assumed to two different groups. We consider an optimization problem for finding an assignment of workers to the line that minimizes total expected risk, which is exchanged to expected cost by reset model of LCMwMP. First, reset model as a simple model of LCMwMP is introduced. Then, some hypotheses of the rules of the optimal worker assignment are proposed and some numerical experiments are researched assuming the processing time as Erlang distribution. Finally, the other rules on other certain conditions are discussed.

Keywords

References

  1. Kong, X., Sun, J., Yamamoto, H., and Matsui, M. (2010), A Study of an optimal arrangement of a processing system with two kinds of workers in a limited-cycle problem with multiple periods, presented at the 11th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS), Melaka, Malaysia.
  2. Kong, X., Sun, J., Yamamoto, H., and Matsui, M. (2011a), Two special Workers' optimal assignment with two kinds of workers under a limited-cycle problem with multiple periods, presented at the 21st International Conference of Production Research (ICPR), Stuttgart, Germany.
  3. Kong, X., Sun J., Yamamoto H., and Matsui M. (2011b), Optimal worker assignment with two special workers in limited-cycle multiple periods, presented at the 2011 Asian Conference of Management Science and Applications (ACMSA), Sanya, China.
  4. Nils, B., Malte, F., and Armin, S. (2007), A classification of assembly line balancing problems, European Journal of Operational Research, 183, 674-693. https://doi.org/10.1016/j.ejor.2006.10.010
  5. Salveson, M. E. (1955), The assembly line balancing problem, The Journal of Industrial Engineering, 6(3), 18-25.
  6. Song, P., Kong, X., Yamamoto, H., Sun, J., Matsui, M. (2014), A Study of Optimal Worker Assignment with Three Rookies under a Limited-Cycle Model with Multiple Periods, Presented at the 12th International Conference on Industrial Management (ICIM), Chengdu, China.
  7. Yamamoto, H., Matsui, M., and Liu, J. (2006), A basic study on a limited-cycle problem with multi periods and the optimal assignment problem, Journal of Japan Industrial Management Association, 57, 23-31.
  8. Yamamoto, H., Matsui, M., and Bai, X. S. (2007), A branch and bound method for the optimal assignment during a Limit-cycle problem with multiple periods, Journal of Japan Industrial Management Association, 58, 37-43.
  9. Yamamoto, H., Sun, J., and Matsui, M. (2010), A study on limited-cycle scheduling problem with multiple periods, Computer and Industrial Engineering, 59 (4), 675-681. https://doi.org/10.1016/j.cie.2010.07.017
  10. Yamamoto, H., Sun, J., Matsui, M., and Kong, X. D. (2011), A study of the optimal arrangement in the reset limited-cycle problem with multiple periods: with fewer special workers, Journal of Japan Industrial Management Association, 62(5), 239-246.