References
- Aghezzaf, E., Production planning and warehouse management in supply networks with inter-facility mold transfers. European Journal of Operational Research, 2007, Vol. 182, No. 3, pp. 1122-1139. https://doi.org/10.1016/j.ejor.2006.09.043
- Bang, J.-Y. and Kim, Y.-D., Scheduling algorithms for a semiconductor probing facility. Computers and Operations Research, 2011, Vol. 38, pp. 666-673. https://doi.org/10.1016/j.cor.2010.08.010
- Brahimi, N., Dauzere-Peres, S., Najid, N.M., and Nordli, A., Single item lot sizing problems. European Journal of Operational Research, 2006, Vol. 168, No. 1, pp. 1-16. https://doi.org/10.1016/j.ejor.2004.01.054
- Cha, M.-S. and Jang, J.-S., Effective Operation of SPC System in Semiconductor Manufacturing. Journal of the Korean Institute of Plant Engineering, 2009, Vol. 14, No. 4, pp. 95-103.
- Chen, T.-R. and Hsia, T.C., Scheduling for IC sort and test facilities with precedence constraints via Lagrangian Relaxation. Journal of Manufacturing Systems, 1997, Vol. 16, pp. 117-128. https://doi.org/10.1016/S0278-6125(97)85675-0
- Chen, T.-R., Chang, T.-S., Chen, C., and Kao, J., Scheduling for IC sort and test with preemptiveness via Lagrangian Relaxation. IEEE Transactions on Systems, Man, and Cybernetics, 1995, Vol. 25, pp. 1249-1256. https://doi.org/10.1109/21.398686
- Ellis, K.P., Lu, Y., and Bish, E.K., Scheduling of wafer test processes in semiconductor manufacturing. International Journal of Production Research, 2004, Vol. 42, pp. 215-242. https://doi.org/10.1080/0020754031000118116
- Jang, S.-H., Optimal Production Capacity and Outsourcing Production Planning for Production Facility Producing Multi-Products. Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, No. 4, pp. 110-117. https://doi.org/10.11627/jkise.2012.35.4.110
- Lee, E.-Y., Assessment Criteria for Process FMEA in Assembly Process of Semiconductor. Journal of the Korean Institute of Plant Engineering, 2013, Vol. 18, No. 1, pp. 5-18.
- Lee, Y.H. and Pinedo, M., Scheduling jobs on parallel machines with sequence dependent setup times. European Journal of Operational Research, 1997, Vol. 100, pp. 464-474. https://doi.org/10.1016/S0377-2217(95)00376-2
- Lin, J.T. and Chen, Y.-Y., A multi-site supply network planning problem considering variable time buckets-A TFT-LCD industry case. International Journal of Advanced Manufacturing Technology, 2007, Vol. 3, pp. 1031-1044.
- Liu, C.-Y. and Chang, S.-C., Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Transactions on Robotics and Automation, 2000, Vol. 16, No. 4, pp. 408-419. https://doi.org/10.1109/70.864235
- Ovacik, I.M. and Uzsoy, R., Rolling horizon procedures for dynamic parallel machine scheduling with sequencedependent set-up times. International Journal of Production Research, 1995, Vol. 33, pp. 3173-3192. https://doi.org/10.1080/00207549508904867
- Pearn, W.L., Chung, S.H., and Yang, M.H., A case study on the wafer probing scheduling problem. Production Planning and Control, 2002a, Vol. 13, pp. 66-75. https://doi.org/10.1080/09537280110061593
- Pearn, W.L., Chung, S.H., and Yang, M.H., Minimizing the total machine workload for the wafer probing scheduling problem. IIE Transactions, 2002b, Vol. 34, pp. 211-220.
- Pearn, W.L., Chung, S.H., Yang, M.H., and Chen, A. Y., Algorithm for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions. Journal of the Operational Research Society, 2004, Vol. 55, pp. 1194-1207. https://doi.org/10.1057/palgrave.jors.2601795
- Pfund, M., Fowler, J.W., Gadkari, A., and Chen, Y., Scheduling jobs on parallel machines with setup times and ready times. Computers and Industrial Engineering, 2008, Vol. 54, pp. 764-782. https://doi.org/10.1016/j.cie.2007.08.011
- Seo, J.-C. and Bang, J.-Y., On-time Production and Delivery Improvements through the Demand-Lot Pegging Framework for a Semiconductor Business. Journal of the Society of Korea Industrial and Systems Engineering, 2014, Vol. 37, No. 4, pp. 126-133. https://doi.org/10.11627/jkise.2014.37.4.126
- Trigerio, W.W., Thomas, L.J., and McClain, J.O., Capacitated lot-sizing with setup times. Management Science, 1989, Vol. 35, pp. 353-366. https://doi.org/10.1287/mnsc.35.3.353
- Yang, M.H., Pearn, W.L., and Chung, S.H., A case study on the wafer probing scheduling problem, Production Planning and Control, 2002, Vol. 13, pp. 66-75. https://doi.org/10.1080/09537280110061593
Cited by
- 지연 스케쥴을 허용하는 납기최소화 잡샵 스케쥴링 알고리즘 vol.42, pp.1, 2015, https://doi.org/10.11627/jkise.2019.42.1.033