참고문헌
- Lee, I.S. and Yoon, S.H., A Parallel Machine Scheduling Problem with Outsourcing Options. Journal of the Society of Korea Industrial and Systems Engineering, 2008, Vol. 31, No. 3, p 101-109.
- Abdel-Malek, L., Kullpattaranirun, T., and Nanthavanij, S., A Framework for Comparing Outsourcing Strategies in Multi-layered Supply Chains. International Journal of Production Economics, 2005, Vol. 97, p 318-328. https://doi.org/10.1016/j.ijpe.2004.09.001
- Baker, K.R., Introduction to Sequencing and Scheduling, John Wiley and Sons, Inc., New York, 1974, p 118-119.
- Byung-Cheon, C. and Jibok, C., Two-machine flow shop scheduling problem with an outsourcing option. European Journal of Operational Research, 2011, Vol. 213, p 66-72. https://doi.org/10.1016/j.ejor.2011.03.017
- Cachon, G.P. and Harker, P.T., Competition and Outsourcing with Scale Economies. Management Science, 2002, Vol. 48, p 1314-1333. https://doi.org/10.1287/mnsc.48.10.1314.271
- Dae-Young, C. and Byung-Cheon C., Outsourcing and scheduling for two-machine ordered flow shop scheduling problems. European Journal of Operational Research, 2013, Vol. 226 p 46-52. https://doi.org/10.1016/j.ejor.2012.10.048
- Dekkers, R., Decision Models for Outsourcing and Core Competencies in Manufacturing. International Journal of Production Research, 2000, Vol. 38, p 4085-4096. https://doi.org/10.1080/00207540050204948
- Huiskonen, J. and Pirttila, T., Lateral Coordination in a Logistics Outsourcing Relationship. International Journal of Production Economics, 2002, Vol. 78, p 177-185. https://doi.org/10.1016/S0925-5273(01)00114-1
- Kaipia, R. and Tanskanen, K., Vendor Managed Category Management-an Outsourcing Solution in Retailing. Journal of Purchasing and Supply Management, 2003, Vol. 9, p 165-175. https://doi.org/10.1016/S1478-4092(03)00009-8
- Kangbok, L. and Byung-Cheon, C., Two-stage production scheduling with an outsourcing option. European Journal of Operational Research, 2011, Vol. 213, p 489-497. https://doi.org/10.1016/j.ejor.2011.03.037
- Kim, B., Dynamic Outsourcing to Contract Manufacturers with Different Capabilities of Reducing the Supply Cost. International Journal of Production Economics, 2003, Vol. 86, p 63-80. https://doi.org/10.1016/S0925-5273(02)00473-5
- Kouvelis, P. and Milner, J.M., Supply Chain Capacity and Outsourcing Decisions : the Dynamic Interplay of Demand and Supply Uncertainty. IIE Transactions, 2002, Vol. 34, p 717-728.
- Lee, I.S. and Sung, C.S., Single Machine Scheduling with Outsourcing Allowed. International Journal of Production Economics, 2008, Vol. 111, p. 623-634. https://doi.org/10.1016/j.ijpe.2007.02.036
- Lee, I.S. and Sung, C.S., Minimizing Due Date Related Measures for a Single Machine Scheduling with Outsourcing Allowed. European Journal of Operational Research, 2008, Vol. 186, p 931-952. https://doi.org/10.1016/j.ejor.2007.02.015
- Ngwenyama, O.K. and Bryson, N., Making the Information Systems Outsourcing Decision : A Transaction Cost Approach to Analyzing Outsourcing Decision Problems. European Journal of Operational Research, 1999, Vol. 115, p 351-367. https://doi.org/10.1016/S0377-2217(97)00171-9
- Nicholson, L., Vakharia, A.J., and Erenguc, S.S., Outsourcing Inventory Management Decisions in Healthcare : Models and Application. European Journal of Operational Research, 2004, Vol. 154, p 271-290. https://doi.org/10.1016/S0377-2217(02)00700-2
- Offodile, O.F. and Abdel-Malek, L.L., The Virtual Manufacturing Paradigm : The Impact of IT/IS Outsourcing on Manufacturing Strategy. International Journal of Production Economics, 2002, Vol. 75, p 147-159. https://doi.org/10.1016/S0925-5273(01)00188-8
- Xiangtong, Q., Two-stage production scheduling with an option of outsourcing from a remote supplier. Journal of System Science and System Engineering, 2009, Vol. 18, p 1-15. https://doi.org/10.1007/s11518-009-5094-1
- Tarakci, H., Tang, K., Moskowitz, H., and Plante, R., Incentive Maintenance Outsourcing Contracts for Channel Coordination and Improvement. IIE Transactions, 2006, Vol. 38, p 671-684. https://doi.org/10.1080/07408170600692259
- Tarakci, H., Tang, K., Moskowitz, H., and Plante, R., Maintenance Outsourcing of a Multi-process Manufacturing System with Multiple Contractors. IIE Transactions, 2006, Vol. 38, p 67-78. https://doi.org/10.1080/07408170500243328
- Wu, F., Li, H.Z., Chu, L.K., and Sculli, D., An Outsourcing Decision Model for Sustaining Long-term Performance. International Journal of Production Research, 2005, Vol. 43, p 2513-2535. https://doi.org/10.1080/00207540500045717
- Yang, J., Qi, X., and Xia, Y., A Production-inventory System with Markovian Capacity and Outsourcing Option. Operations Research, 2005, Vol. 53, p 328-349. https://doi.org/10.1287/opre.1040.0165